7 Conclusion
This Engineering Services Report has been prepared to provide a review and information on the
engineering requirements to support the proposed development application at 5 School Street,
Pomona.
The following requirements have been reviewed as part of this report:
• Suitable access is provided from School St via an upgraded access.
• Vehicles can safely manoeuvre internal shared driveways and on-site parking.
• A flood search has been obtained to determine the minimum floor levels requirements and
freeboard for the site.
• Stormwater quantity has been assessed and on-site detention requirements is considered
unnecessary for reasonings provided;
• Stormwater quality objectives have been achieved by application of a bio-retention basin;
• The site is currently serviced by the existing water and sewerage network and augmentations
to connections will be provided to meet the development requirements.
In summary, this report shows that the development site can be adequately serviced, and provision
made as currently shown and in further detailed design for this development to be in accordance with
Council's code requirements.
15 November 2024 Page 17
Document Set ID: 23679130
Version: 1, Version Date: 08/04/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.