Decision Notice - Approved by Delegation of Authority RAL26 0020 & OPW26 0090 (As Published) · OPW26/0090
Currency Period
2. This development approval lapses if the requirements of the conditions have not been
completed and an application for plan seal is not lodged with Council by 2 September 2030
unless an application to extend the currency period is approved by Council.
Approved Plans
3. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
- - Plan of Development – Proposed Subdivision of Lot 34 26/01/2026
on RP179733 prepared by Danya Cook town Planning
Property Access and Driveways
4. A residential driveway must be constructed to Lot 1. The works must be undertaken in
accordance with the conditions of this Decision Notice and be generally in accordance with
Sunshine Coast Civil Engineers’ Site Works (C001, Rev. 01) dated 15 June 2026.
Stormwater Drainage
5. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with the conditions of this Decision
Notice.
Services
6. Reticulated electricity and telecommunication services must be provided to each lot in
accordance with the standards and requirements of the relevant service provider.
7. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
8. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Easements
9. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
10. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
11. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
12. All earthworks and associated batters/retaining structures, both above and below ground
level, both temporary and permanent, must be undertaken in accordance with an Operational
Works approval, and contained entirely within the subject site unless written permission from
the respective landowner(s) is provided to Council.
Page 2 of 10
Document Set ID: 25123881
Version: 4, Version Date: 07/09/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Approved by Delegation of Authority RAL26 0020 & OPW26 0090 (As Published)Related documentApplication case desk ↗
Decision Notice - Approved by Delegation of Authority RAL26 0020 & OPW26 0090 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 169 KB (small file)
- File type
No other editions are linked here.