Decision Notice - Approved by Delegation of Authority RAL26 0020 & OPW26 0090 (As Published) · OPW26/0090
DEVELOPMENT PERMIT FOR OPERATIONAL WORKS – EARTHWORKS, STORMWATER &
VEHICLE CROSSOVER
Approved Plans
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
C001 01 Site Works 15 June 2026
Prepared by Sunshine Coast Civil Engineers
Currency Period
2. The Currency Period for this development approval lapses if the development has not
substantially started by 4 September 2028, unless an application to extend the currency
period is approved by Council.
PRIOR TO COMMENCEMENT OF WORKS
Engineering
3. All necessary approvals from external service providers (e.g. Unitywater) and external parties
on which the development works are proposed have been obtained and a copy supplied to
Council.
4. Copies of the approved plans, duly signed by the consultant Registered Professional
Engineer of Queensland (RPEQ) and issued “FOR CONSTRUCTION” must be provided to
Council prior to the prestart meeting.
5. A condition report including photographs of the frontage of the site must be completed and
submitted to council at the prestart meeting.
6. Certificates demonstrating currency of public liability insurance and works insurance covering
the works must be submitted to Council prior to the prestart meeting.
7. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
pre-start meeting must include the relevant parties for the following aspects of the works:
a. Civil engineering works;
b. Erosion and sediment control works; and
c. Other relevant parties
8. A Construction Management Plan must be submitted prior to Council attending the prestart
meeting. The Management Plan must address:
a. Traffic management during all phases of construction;
b. Adequate parking arrangements for works and deliveries;
c. appropriate traffic signage in accordance with the Manual of Uniform Traffic Control
Devices (MUTCD); and
d. provision for safe vehicle and pedestrian access across the frontage of the site both
during daily construction and after daily construction has ceased.
9. Any changes to the details associated with the supervising RPEQ or Principal Contractor
during construction, must be notified to council in writing within five business days of the
change occurring.
10. Any conflict between the development and an existing or proposed service must be referred
to the relevant service authority for determination prior to commencement of works.
Page 3 of 10
Document Set ID: 25123881
Version: 4, Version Date: 07/09/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Approved by Delegation of Authority RAL26 0020 & OPW26 0090 (As Published)Related documentApplication case desk ↗
Decision Notice - Approved by Delegation of Authority RAL26 0020 & OPW26 0090 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 169 KB (small file)
- File type
No other editions are linked here.