Decision Notice - 010.2006.00002356.001 [As Published] · 152006.2356
Officer: Ian Lewis
Direct Telephone: (07) 5449 5259
Response Address: PO Box 141, Tewantin QLD 4565
Email: [email protected]
Our Reference: 2006/2356
Your Reference:
10 September 2008
John Stuart Hofmann
CARE Jones Flint & Pike Pty Ltd
PO Box 6
MAROOCHYDORE QLD 4558
Dear Sir
Decision Notice
Integrated Planning Act 1997
I refer to your application and advise that on 10 September 2008 Council decided to approve the
application subject to conditions.
Details of the decision are as follows:
1 APPLICATION DETAILS
Application No: 2006/2356
Street address: 99 Hollett Road NOOSAVILLE
Real property description: LOT: 2 SP: 179590
Planning Scheme: The Noosa Plan
2 DECISION DETAILS
The following type of approval has been issued:
for Reconfiguring a Lot - 06/2356 Lot Reconfiguration (4 Lots) and Access Easement
3 RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.
4 ASSESSMENT MANAGER CONDITIONS
1. Pursuant to Section 3.7.3(3)(b) of the Integrated Planning Act, all outstanding rates and
charges due and payable to Noosa Council in respect of the lots being reconfigured shall be
paid prior to endorsement of the Plan of Survey.
2. Pursuant to Section 3.5.21(2)(b) of the Integrated Planning Act 1997, the relevant period is
four (4) years from the day this permit takes effect during which time all conditions must have
been complied with, Operational Works completed, and the Plan of Survey lodged with the
Council for endorsement.
3. Plan of Survey for Council endorsement shall be submitted to Council in the correct form with
the fees prescribed in Council's adopted fee schedule.
Page 1 of 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 25 pages
Page 2
2006/2356
4. Prior to Council endorsing the Plan of Survey, a certificate from a registered Professional Civil
Engineer shall be submitted to Council for each Development Permit for Operational Works
issued pursuant to this permit. The engineer shall certify those works and that they have been
completed in a workman like manner in accordance with good engineering practice and in
accordance with that permit.
Access (Road)
5. A new “Access” standard 5.5m wide sealed road as described in Council’s Planning Scheme
Policy PSP 5 Engineering Design Standards – Roads, Drainage and Earthworks shall be
constructed from Hollett Road extending approximately 25m past the end of the Lot 2 on
SP179590 access handle and terminating in a cul-de-sac, generally as shown on Drawing
Number M1775-12, prepared by Jones, Flint and Pike Pty Ltd and dated 19 May 2008. The
cul-de-sac for the new road shall have a minimum radius of 10 metres and all road verges
shall be topsoiled and grassed following completion of the roadworks in conjunction with the
Development Permit for Operational Works. A Development Permit for Operational Works
shall be obtained prior to the commencement of any works.
6. The road formation of Hollett Road frontage of the site shall be constructed to a “Collector”
standard 7m wide sealed road as described in Council’s Planning Scheme Policy PSP 5
Engineering Design Standards – Roads, Drainage and Earthworks. These works shall be
constructed to match smoothly with the existing road formation and include all necessary
tapers, drainage etc. A Development Permit for Operational Works shall be obtained prior to
the commencement of any works.
7. The intersection of the new road and Hollett Road shall be designed and constructed in
accordance with Council’s Planning Scheme Policy PSP 5 Engineering Design Standards –
Roads, Drainage and Earthworks and generally in accordance with the Department of Main
Roads Road Planning and Design Manual Chapter 13 Intersections at Grade part 13.7.10.1
“Basic Right Turn Treatment (BAR) on a two lane rural road. These works shall be constructed
to match smoothly with the existing road formation and include all necessary widening, tapers,
drainage etc. A Development Permit for Operational Works shall be obtained prior to the
commencement of any works.
8. The proposed names of new roads (public and private) and parks shall be lodged with the
application for a Development Permit for Operational Works.
Names are to be selected from any of the following categories:-
8.1. Easily pronounced words of Murri languages.
8.2. Names or words of local significance or historical interest.
8.3. Flora, fauna, industry, topographical, geological and similar features and terms relative
to the district.
8.4. Surnames of persons of merit or historical significance. (Personal names should be
avoided.)
Approval will not be given to a name that is the same or similar to the name of another road in
the Shire, or of a road in close proximity in a neighbouring Shire. Names that are not easily
pronounced, or may cause confusion to emergency services are to be avoided.
All street signs on new roads (public and private) and parks shall be erected prior to works
being accepted on maintenance.
Page 2 of 26
Page 3
2006/2356
Access (Driveways)
9. A 4m wide sealed vehicular access driveway shall be constructed from the new proposed
road for the full length of the access handle on proposed Lot 2. The driveway shall incorporate
a passing bay approximately 40m from the proposed new road. The vehicle access shall be
designed and constructed in accordance with Council’s Planning Scheme Policy PSP 5
Engineering Design Standards – Roads, Drainage and Earthworks and Council’s Standard
drawings.
10. The applicant shall provide a vehicle access to each lot. The access shall be in accordance
with Council’s Planning Scheme Policy PSP 5 Engineering Design Standards – Roads,
Drainage and Earthworks and Council’s Standard drawings.
11. Those sections of the existing vehicle access to proposed Lot 1 that stand outside of the
boundaries of proposed lot 1 shall be removed.
12. Prior to commencement of work relating to a Development Permit for Operational Works, the
Applicant shall sign a written undertaking to be responsible for the full cost of repairs to road
pavement, footpath, or other Council property damaged as a result of construction of the
proposed development.
In all cases, Council reserves the right to carry out rectification works in an emergency and
where no reasonable attempt has been made to complete the rectification works as part of the
development.
All costs incurred by Council in any rectification works shall be repaid to Council prior to the
endorsement of the Plan of Survey.
Easements
13. Existing easement EMT C SP179590 on Lot 2 on SP179590 shall be extinguished.
14. A 10m wide access and services easement shall be created over Lot proposed 2 from the end
of the proposed new road reserve for the full length of the access handle on proposed Lot 2.
The easement shall benefit proposed Lot 3.
15. Prior to Council endorsement of the Plan of Survey, a duly executed copy of any required
Grant of Easement shall be submitted to Council for perusal.
Any changes required by Council’s Solicitor shall be attended to prior to endorsing the Plan of
Survey.
Any necessary Titles Office forms requiring the consent of Council is to be submitted prior to
the endorsing of the Plan of Survey.
16. Prior to the endorsement of the Plan of Survey, the Applicant's Solicitor shall give Council's
Solicitor an appropriate undertaking in writing that in conjunction with lodgement of the Plan of
Survey at the Land Titles Office, the Title Deed and the easement documents will also be
lodged and any additional Titles Office forms or requisitions requiring the consent of Council
being attended to forthwith.
Effluent Disposal
17. The design of the on-site effluent disposal system and disposal area (land application area)
shall be in accordance with Council’s Planning Scheme Policy PSP24 - Effluent Disposal and
the relevant report for the lot from the Effluent Disposal Reports (Job Numbers 07/1634-1,
07/1634-2, 07/1634-3 dated 18/02/2008 by Global Testing.
Please note the land application area shall be positioned to achieve the greatest possible
setback to any permanent or intermittent watercourse and at least 15m from any underground
rainwater tanks.
Page 3 of 26
Page 4
2006/2356
Vegetation Protection and Weed Removal
18. Existing trees on site and within the road reserve are to be retained, except where required to
be removed due to a building approval or the conduct of an approved use. Driveways and
buildings sites should be designed to avoid the removal of native vegetation.
19. All Class 1, Class 2 and Class 3 pest plants declared under the Land Protection (Pest and
Stock Route Management) Act 2002 and including all Camphor Laurel trees on the property
are to be controlled on the site prior to Council endorsement of the Plan of Survey. In this
context “controlled” shall mean, for class 1 and 2 pests, completely eradicated. For class 3
pests it shall mean removal of the plants where they threaten environmentally significant areas
of the site such as riparian zones and areas of natural vegetation.
Where class 3 plants are removed as a result of this condition and there is not sufficient
natural regeneration of native species, the areas shall be replanted with endemic native
species so that a sustainable natural ecosystem is restored.
Council’s Conservation Management Supervisor will not inspect the site until 30 days after the
weed treatment and replanting is complete.
20. If there is any cleared vegetation it shall be suitably processed by one of the following
methods and removed from the site:-
20.1. Processing through a wood chipper or shredder. The resulting mulch is to be
stockpiled loose in heaps of less than 1000 cubic metres, less than 2.5 metres high
with a minimum of 10 metres between edges of heaps.
20.2. Disposal for firewood.
20.3. Disposal for landscaping purposes.
20.4. Transport to alternative site for breaking down materials provided that all necessary
permits have been obtained to allow the alternate site to be used for this purpose.
The disposal method for clearing works is to be submitted in conjunction with an application
for a Development Permit for Operational Work. The Applicant is advised that other methods
may be considered provided full details of the method are submitted.
The Applicant is also advised that burning off is an unacceptable method of disposal.
Services
21. Any alteration of a public utility or other facility necessitated by the development of the land or
associated construction works either internal or external to the site shall be at no cost to
Council.
Power Supply
22. An electricity service shall be provided to all lots unless already provided. The electricity
service to proposed Lot 4 shall be provided overhead within the new road and then to a
property pole located inside the boundary of proposed Lot 4. An electricity service to proposed
Lots 2 and 3 shall be provided overhead within the new road then underground to a property
pole located inside the boundary of proposed Lot 2 and extending underground to the end of
the access handle.
In this regard, an approved ENERGEX Electrical Design Consultant shall work in conjunction
with Council’s Manager - Works Support to prepare detailed designs of the electrical proposal.
The detailed deigns shall then be submitted to ENERGEX for approval and a copy of their
approval submitted to Council in conjunction with a “Certificate of Electricity Supply for
Proposed Subdivisions” (prepared by an approved ENERGEX Electrical Design Consultant)
prior to Council endorsing the Plan of Survey.
Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant shall
be wholly at the applicant’s expense and shall not entail a financial encumbrance on future
purchasers of the proposed lots.
Page 4 of 26
Page 5
2006/2356
Telecommunication
23. The requirements for TELECOMMUNICATION services shall be satisfied in relation to the
provision of new telephone services to the proposed lots. In this regard written confirmation
from an approved telecommunication agency shall be submitted to the Council prior to Council
endorsing the Plan of Survey.
Contributions Towards Council Infrastructure
24. Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or
upgrading various infrastructure at the rates applicable at the time of payment. An estimate
only of the contribution amounts under the current Council policies and requirements is
outlined in the table below:
Contribution Required For: Amount:
PSP12 – Public Open Space Contributions (Park) $9,223
TOTAL Contribution Amount = $9,223
Please note, that these amounts are all subject to variations in the Consumer Price Index, All
Groups Brisbane from March 2008 until the date of payment.
All contributions must be paid prior to the issue of a Development Permit for Operational
Works.
In the event that this Development Permit lapses or is cancelled, the paid contributions will be
refunded.
Building Envelopes
25. The proposal plan drawing number M1775-11G titled “House Site Area Plan” prepared by
Jones Flint and Pike dated 21 April 2008 shall be amended to provide for building envelopes
for proposed Lot 2, 3 and 4 to be located outside of the Riparian Buffer Area as identified by
the Biodiversity Overlay of The Noosa Plan.
Fire Management
26. The development shall be undertaken in accordance with the bushfire recommendations
contained within correspondence by Cardno dated 7 March 2008, with the exception of the 5
metre revegetation zone.
Revegetation Plan
27. A revegetation plan for the site shall be submitted to Council prior to issue of a Development
Permit for Operational Works. This plan shall detail the proposed revegetation works to be
undertaken within that part of the Riparian Buffer Area, as identified by the Biodiversity
Overlay of The Noosa Plan, which is located between the southern watercourse on the site
and the existing fence line adjacent to the watercourse on proposed Lot 3 and the proposed
northern property boundary of proposed Lot 2 as shown indicatively on Attachment 1 titled
‘Extent of revegetation within Riparian Buffer Area’ and include the following:
27.1. Site preparation (this may include thinning, grass removal, weed removal and control,
etc);
27.2. Measures to protect to existing native plants on site during works;
27.3. Proposed planting of endemic species and koala food trees including type, size and
number of plants for the planting area; and
27.4. Edge planting shall comprise of fire retardant species (ie. rainforest species) to provide
a buffer between the development and hazardous vegetation.
Page 5 of 26
Page 6
2006/2356
The revegetation plan shall reflect the bushfire recommendations contained within
correspondence by Cardno dated 7 March 2008, with the exception of the 5 metre
revegetation zone.
A 2 year maintenance period from the date restoration works are completed by the contractor.
All works shall be undertaken to the reasonable satisfaction of the CEO prior to the sealing of
the plan of survey.
Covenants
28. An Environmental Covenant (as defined by Part 6 division 4A of the Land Title Act 1994) shall
be created at no cost to Council to protect the vegetation, identified as Environmental
Protection in accordance with the Biodiversity Overlay of The Noosa Plan and within the
revegetation area. The Environmental Covenant(s) shall be for the protection of the site’s
environmental values so that it retains and enhances the vegetation. The Environmental
Covenant shall be shown on the survey plan submitted to Council for approval prior to Council
endorsing the Plan of Survey.
General
29. For the following classes of work associated with development, a Development Permit for
Operational Works must be obtained prior to commencement of works relating to that class of
work. The application may combine any or all of these classes of work: -
29.1. Access and Drainage
29.2. Roadworks and Drainage.
29.3. Frontage Works.
29.4. Erosion and Sediment Control
29.5. Landscaping
30. The person acting on this permit shall apply and obtain for all other necessary permits
including crane permits, road opening permits, hoarding permits, footpath occupation permits
and/or any other approvals required under any other Act.
31. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
32. The requirements of this development approval are to be effected, prior to the transfer of
ownership of any of the new lots. Council reserves the right to call upon the bond or
guaranteed sum referred to in this approval to effect compliance with conditions.
Security
33. Prior to commencement of any operational works arising out of this permit, security in the sum
of $20,000 must be lodged with Noosa Council, to secure performance of all conditions of this
permit. The security shall be in the form of cash or unconditional trading bank guarantee
acceptable to the CEO.
The security will be returned upon satisfactory performance of all the conditions of this permit
and any other related development permits for operational works, less any costs incurred by
Council in ensuring compliance with these conditions or for any additional inspections incurred
for substandard work or work undertaken not in accordance with this permit.
Page 6 of 26
Page 7
2006/2356
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Referral Trigger Referral Referral Agency Referral Address
Status
Vegetation Concurrence PO Box 573
Acid Sulphate Soils Advice Department of Natural NAMBOUR QLD 4560
Resources, Mines and
Water
GPO Box 1461
Infrastructure Concurrence Energex BRISBANE QLD 4001
PO Box 64
Koala Concurrence Environmental BELLBOWRIE QLD 4070
Protection Agency
A copy of any referral agency conditions is attached.
6 APPROVED PLANS
The approved plans for this development approval are listed in the following table:
Plan No. Rev. Plan Name Date
M1775-12 Sheet 1 Proposal Plan 19 May 2008
M1175-11 G Sheet 1 House Site Area Plan 24 October 2007
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
For the purpose of these conditions, the following definitions apply: -
1. A Plan of Survey means the plan for the reconfiguration of a lot required to be endorsed by
Council pursuant to S3.7.1 of the Integrated Planning Act 1997.
2. A Registered Professional Civil Engineer means an engineer who is registered with the
board of Professional Engineers of Queensland.
3. The person acting on this permit means any person or company who undertakes
development pursuant to this permit.
The applicant is advised that development contributions and infrastructure charges applicable to this
development approval have been based on the following Uses Class/ Uses and applicable
quantities:-
Existing Development Approved Development
Approved Use Class /
Existing Use Class / Use Existing Quantity Approved Quantity
Use
Detached House 1 Dwelling Detached House 4 Dwellings
The applicant is informed that approval of this development application will trigger an Infrastructure
Charge in accordance with the Coastal Major Road Network Infrastructure Charges Plan for the
estimated amount of $8,569 and is subject to variations in the Consumer Price Index, All Groups
Brisbane from March 2008 until the date of payment. An Infrastructure Charge Notice will be issued
in accordance with Chapter 5 of the Integrated Planning Act 1997.
Page 7 of 26
Page 8
2006/2356
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can
also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or
the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
8 PROPERTY NOTES
The following property notes will be placed against the subject property in Council’s property record
system:
1. The Applicant is advised that the following property attributes (notations) or similar shall be
placed on the Council’s rates records for the proposed lots to advise prospective purchasers
of Council's requirements regarding sewage treatment method, effluent disposal, bushfire,
stormwater and access:-
a. “The property is in an unsewered area. You are advised that preliminary investigation for
this site indicated that a secondary wastewater treatment plant may be required. Effluent
shall be disposed of on-site in accordance with Council’s policy for on-site wastewater
disposal current at the time of Building Works. A detailed site assessment and effluent
land application design will be required to be submitted to Council at the time of an
application for a Development Permit for Building Works or modifications to the effluent
disposal system. For further information regarding on-site wastewater disposal please
contact SCRC’s – Tewantin Office, Plumbing Services Section – Phone 54495250.”
b. “A Bushfire Management Plan exists for this property. A copy may be obtained from
SCRC Tewantin Office, Land Development Section.”
c. “Roof runoff of the new dwellings shall be directed to a rainwater storage system or tank
(minimum storage 45,000 litres per dwelling). The design of the rainwater storage
system shall be part of a Plumbing and Drainage Application.”
d. “The access road to this property may be cut during flooding periods. No alternative
access is available.”
2. The Applicant is advised that the following property attributes (notations) or similar shall be
placed on the Council’s rates records for the proposed lots 2, 3 and 4 to advise prospective
purchasers of Council's requirements regarding house siting and effluent disposal:-
“A specific house site and effluent disposal area has been specified for this property – refer
attached plan.”
9 PRELIMINARY APPROVAL OVERRIDING SCHEME
Not Applicable.
Page 8 of 26
Page 9
2006/2356
10 FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit required Subject of the required Development Permit
Access and Drainage, Roadworks and Drainage.
Operational Works
Frontage Works.
Erosion and Sediment Control
Landscaping
11 SELF ASSESSABLE CODES
Not Applicable.
12 SUBMISSIONS
Not Applicable.
13 REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not Applicable.
14 RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. If Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice”
may be given. Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the Integrated Planning Act 1997).
15 OTHER DETAILS
Please note that an Infrastructure Charge in accordance with the Coastal Major Road Network
Infrastructure Charges Plan has been triggered by the approval of this development application. An
Infrastructure Charge Notice is attached in compliance with Chapter 5 of the Integrated Planning Act
1997.
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
Yours faithfully
Mark Lewis
MANAGER – LAND DEVELOPMENT
Page 9 of 26
Page 10
2006/2356
Referral Agency Conditions
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
Page 10 of 26
Page 11
2006/2356 Page 11 of 26 [OCR of page images] 2006/2356 we 19 January 2007 Jones Flint and Pike PO Box 6 MAROOCHYDORE QLD 4558 Attention: Patrick Atkinson cc Noosa Council PO Box 141 TEWANTIN QLD 4565 Attention: Jane Davissen Dear Patrick Feeder 790 / 132kV Proposed Reconfiguration of a Lot 99 Hollett Road, Noosaville, Lot 2 on SP179590 Your ref: M1775 Council ref: - 2006/2356 Our ref: NSID:07/L0064 We refer to your correspondence dated 11 December 2006 regarding the above application. ENERGEX Limited acting as a Concurrence Agency has no objection to the proposed Reconfiguration of a Lot, provided that no works are carried out on the easement. Please note that the affected Lot is traversed by a transmission line at the northern most end, in an area of the Lot designated as an Environmental Protection Area as shown on your Proposal Plan (M1775-08). For future reference, when considering development either on ENERGEX easements or in the vicinity of ENERGEX assets, please be aware of the following general conditions: « Nocivil works are to occur within 5 metres of any part of a tower base, pole or stay. Trenches must have a minimum horizontal separation from the trench to any tower base or pole, at least equal to the trench depth. Natural ground tevel on the easement should not be disturbed without ENERGEX approval. « ENERGEX trenching requirements for the installation of pipe include full depth shoring of trench sides for a minimum of 5 metres either side of a structure. The trench is not to be left open overnight and backfill is to be compacted in 150mm layers in the immediate vicinity of the structure. Reference: HBD331064 NSID:07/LO064 10 oa ee &; & ® 2 UALIT (AGEM! yt ee aa q i Enquiries Heidi Minto Telephone (07) 3407 4815, Facsimile (07) 3407 4144 Email [email protected] Corporate Office 150 Charlotte Street Brisbane Qld 4000 GPO Box 1461 Brisbane Qld 4001 Telephone (07) 3407 4000 Facsimile (07) 3407 4609 www.energex.com.au ENERGEX Limited ABN 40 078 849 055 Page 11 of 26
Page 12
2006/2356 Page 12 of 26 [OCR of page images] 2006/2356 mor e Final ground levels should slope gently to the edge of the easement or the proposed kerb or surrounding area such that pooling of water on the easement is avoided and conductor ground clearances are not decreased. « 10 metres clear access must be provided around all towers and pole structures. « Stockpiling of spoil on the easement is prohibited. « — Lighting structures are not permitted in the easement without prior written consent of ENERGEX. « Underground services should be kept to the outer edge of the easement and any crossing of the easement should be clearly marked. Please submit the relevant design drawings to the Principal Mains Design Engineer for review. The identification, assessment and mitigation of any possible hazards in the service due to electromagnetically induced voltages, is the responsibility of the developer. ° Any cut in the vicinity of a structure or between a structure and the road kerb will need to be stabilised by a retaining wall. The retaining wall design and location is to be submitted to ENERGEX for approval. «Any further proposal for works or development on the easement including those involving changes in ground level and retaining wall designs around towers and poles must have prior approval from ENERGEX. Please submit the relevant civil designs to the Principat Mains Design Engineer for approval. « Access to the easement and access along the easement must be available to ENERGEX personnel and heavy equipment at all times. ENERGEX will require the developer / owner to supply and install gates where fencing prohibits access to and along the easement area. To enable travel along the easement at anytime the gates must be series locked with an ENERGEX padlock. Both the padlock and a design drawing of an acceptable gate will be provided by ENERGEX,. e Any costs incurred by ENERGEX as a result of the works on the easement are to be met by the property developer / owner. « ~ Atall times the following minimum clearance must be maintained from the top of any machinery moving in the vicinity of energised conductors: — 132kV and 110kV conductors — 4.5m minimum clearance — 33kV and 11kV conductors — 3m minimum clearance ~ Should it be necessary to transport equipment or extend any equipment, such that these clearances cannot be confidently maintained, you are required to contact our office to ascertain whether a Safety Officer is required on-site. All operators of machinery are to be made aware of the presence of high voltage conductors. * Any proposal for landscaping on the easement must have prior approval from ENERGEX. Please submit the relevant landscaping design to the Principal Mains Design Engineer for approval. When considering landscape designs the planting of trees must be kept to the edges of the easement and not under any overhead conductors. When mature, plants or trees must not grow in excess of 4 metres in Reference: HBD331064 NSID:07/L0064 Page 12 of 26
Page 13
2006/2356 Page 13 of 26 [OCR of page images] 2006/2356 er ok height. If pertinent the ENERGEX Guide to “Powerline Friendly Plants” will be enclosed, please refer to this Guide for recommended species. » Any further proposal for works or development on the easement including those involving changes in ground level and retaining wall designs around towers and poles must have prior approval from ENERGEX. Please submit the relevant civil designs to the Principal Mains Design Engineer for approval. Should you require any further information on the above matter, please contact the undersigned on (07) 3407 4815. Yours faithfully of 6. —~e Heidi Minto Town Planning Officer Network Development and Property Department Enc: — Guideline to Powerline Friendly Plants Reference: HBD331064 NSID:07/L0064 Page 13 of 26
Page 14
2006/2356
Page 14 of 26
[OCR of page images]
2006/2356
Queensland
Government
Assessment Manager Ref 2006/2356
NRW Reference IC1206NAMO010
24 Apni 2008 Natural Resources and Water
Chief Executive Officer
Sunshine Coast Regional Za
Locked Bag 72 [4 SCRC CORRESPONDENCE
SCMC Qld 4560 (HE
Attention Jane Davissen $0006400
Dear Sir/Madam
APPLICATION FOR RECONFIGURING A LOT OVER -— LOT 2 SP179590, 99 HOLLETT
ROAD, NOOSAVILLE—REFERRAL AGENCY RESPONSE
The Chief Executive of the Department of Natural Resources and Water (NRW) advises
that the Referral Agency Response for the above mentioned application, prepared pursuant
to section 33 16 of the /ntegrated Planning Act 1997 (IPA), ts enclosed A copy of the
Referral Agency Response has been sent to the applicant
NRW looks forward to receiving a copy of the Decision Notice for the application in due
course
Should you have any questions, please contact Daniel Leo on (07) 5451 2287, quoting
reference number IC1206NAM0010
Yours sincerely
<— ap
Jeff Guinea
Senior Officer (Planning & Environment)
Nambour — South East Region
Authonsed Delegate
Enc NRW Referral Agency Response
Department of Natural
Resources & Water
Centenary Square Buriding,
Curne Street, Nambour Q 4560
PO Box 573, Nambour Q 4560
Page 14 of 26
Page 15
2006/2356
Page 15 of 26
[OCR of page images]
2006/2356
Department of Natural Resources and Water (NRW)
Referral Agency Response
Section 3 3 16 Integrated Planning Act 1997
1.
APPLICATION INFORMATION
1.1. Applicant name John Hofmann
1.2 Property description Lot 2 $P17590
1.3 Development Type Reconfiguring a Lot (RaL)
1.4 Assessment Manager Sunshine Coast Regional Council
(previously Noosa Shire Council)
1.6 Assessment Manager Reference 2006/2356
1.6 Departmental Reference IC1206NAM0010
CONCURRENCE AGENCY MATTERS
Vegetation Management Act 1999
The Chief Executive of the Department of Natural Resources and Water directs that
the following conditions must be imposed on any approval given by the Assessment
Manager (Underlined terms have been defined-—Schedule A ~ Glossary)
21 No clearing as a result of reconfiguring Lot 2 on SP179590 ts to occur in the
area shown as Area A on the attached Referral Agency Response
(Vegetation) Plan that has the reference RARP2006/013811
22 No infrastructure—including, but not limited to, buildings, roads, and
fences—is ta be established in the area shown as Area A on the attached
Referral Agency Response (Vegetation) Plan that has the reference
RARP2006/013811
23 No allotment boundaries are to be located or established within the area
shown as Area A on the attached Referral Agency Response (Vegetation)
Plan that has the reference RARP2006/013811
24 No infrastructure—except for underground services, fences, and roads—is
to be established in the area shown as Area B on the attached Referral
Agency Response {Vegetation} Plan that has the reference
RARP2006/013811
in accordance with section 3 3 18(8) of the integrated Planning Act 1997 reasons for
the referral agency response are as follows
NRW has assessed the application against the Concurrence Agency Policy for
Reconfiguring a Lot (Ral) 20 November 2006 (RaL Policy) and has determined
that the application meets the requirements of Criteria Table A, because clearing
as a result of the Ral will not occur within assessable vegetation
NRW has directed the assessment manager to include conditions in any
development approval given for the aprlication to ensure that
* clearing as a result of the Ral does not occur within assessable vegetation
Page 15 of 26
Page 16
2006/2356 Page 16 of 26 [OCR of page images] 2006/2356 * the application remains consistent with the Ral. Policy Referral Agency Response (Vegetation) Plan RARP2006/013811 is attached to and forms part of this Referral Agency Response . ADVICE AGENCY MATTERS The Chief Executive of the Department of Natural Resources and Water provides the following advice to the Assessment Manager on matters relating to State Planning Policy 2/02 ~ Planning and Managing Development involving Acid Suifate Soils (SPP 2/02) The application suggests that the proposed development will involve the excavation of greater than 1000m* of sol or sediment at or below 5m AHD Based on this information, SPP 2/02 ~ Planning and Menaging Development Invoiving Acid Sulfate Soils (SPP 2/02) requires the applicant to conduct investigations to identify the presence of Acid Sulfate Sol (ASS) consistent with SPP 2/02 and associated documents’ and, if required, to provide an ASS Management Plan The penod prescnbed within the integrated Planning Act 1997 for the provision of ths Referral Agency Response is about to expire and NRW has yet to receive adequate supporting information from the applicant relating to the identification and management of ASS As section 53 of SPP2/02 requires an Assessment Manager to confirm whether ASS ts present within the area to be disturbed by the proposed development, NRW suggests that the Assessment Manager may wish to defer any decision on the application unti an ASS mvestigation report and, if required, an ASS Management Plan is submitted and assessed This will provide an opportunity for NRW to give the Assessment Manager appropnate technical advice regarding the ability of the proposal to meet Development Outcome 1 enunciated within SPP 2/02 . THIRD PARTY MATTERS The Chief Executive of the Department of Natural Resources and Water provides the following advice to assist the Assessment Manager to fully consider the application Aboriginal Cultural Heritage Act 2003 NRW also takes this opportunity to adwse the Assessment Manager of the responsibilittes of applcants under the Abonginal Cultural Hentage Act 2003 The Assessment Manager may wish to include this information as an Advisory Note on the Decision Notice issued for the application Under section 23 of the Abonginal Cultural Hentage Act 2003 a person who carnes out an activity must take all reasonable and practicable measures to ensure the activity does not harm Abonginal cultural hentage (the “cultural hentage duty of care”) Maximum penalties for breaching the duty of care are $750,000 for a corporation and $75,000 for an individual Applicants wil comply with the duty of care in relation to Aboriginal cultural heritage if they are acting in accordance with cultural hentage duty of care guidelines gazetted under the Aborigmal Cultural Heritage Act 2003, available on the NRW website, or m accordance with an agreement with the Aboriginal party for the area or a cultural heritage management plan approved under part 7 of the Abonginal Cultural Hentage Act 2003 Applicants are also encouraged to undertake a search of the Aborgmal Cultural Hentage Database and the Abonginal Culiural Hentage Register, administered by the ' SPP 2102 and the SPP 2/02 Gustelne are avaiable from www ipa gid gov auloodesicodespomes asp “The SSSOClated TeChAKaT GOCUMENTS ara aValAble from Kith /Naew Arw id Gov alviandassiproducts hint Department of Natural Resources and Water Page 2 of 3
Page 17
2006/2356 Page 17 of 26 [OCR of page images] 2006/2356 Cultural Heritage Coordination Unit, NRW Application forms to undertake a free search of the Cultural Heritage Register and the Database may be obtained by contacting the Cultural Heritage Coordination Unit on (07) 3238 3838 or on the NRW website www nrw aid gov au/cultural_ heritage <— Agim _ Jeff Guinea Senior Officer (Planning & Environment) Nambour — South East Region Authonsed Delegate 24 April 2008 Page 17 of 26
Page 18
2006/2356 Page 18 of 26 [OCR of page images] 2006/2356 ‘ stat | é r i i i renanete 4 cd | 4 “ene j @ | | en | ROCKY POINT ROAD he Be ths ee Be HR se Be Be cd me Be Be fie Be Sete Parse al seated. Parebes at SEOTED TSTAROS at SOAS POET ERS at sediod. Parner At HOS POTTOPE at sorngrt at Parone aL POTTS as POrTney at yornpa at Porrnes a PORT END at a AOE aria Scale 4:3,000 GAS paper sae Mole GAB reteranoe sets oe gecented to The, roma shan ove norte secores APPR , re an orurate 0 om ha 100 a 200 ae Bean Ross screwy early of the loge boundaries, sSoareg nove Gocasamiea teu bebty a : must ba read in conju! Projection: UTM (MGA Zone $8) — Datum: GDABE ing innatctiee and detegnled cremacter) we ‘iene ggancy Response anoeorsent LEGE! * wat Rekawce Poets fs OFS J) ber nyt ae (iil) ARO A» Spake condone apply - se Ratan eee if Fapared TOUSEN fi dette Referral Agency Response (Vegetation) Plan Pian of Area A and Area B in Lot 2 on SP179690 “Trankgod Mo CLD ENANIEID isto Aaih - Sigal aa tel apy » tote: Prep piney Raionee DOURIET br daily | [CENTRE GYMPIE LOCA, GOVERMENT: SUNSHINE COABT MHGIONAL LOCALITY OF MOOSAVILLE RESON SOU UST! PARE 2006/013814 Has Rateernsss Bett Foe pm piaten ot ate snes nee GUMIOOE RIS Pate Retemrce GOCE ‘Pranared try L6G ‘Gee ThApee ROA Sheet tof 1 Sheet Page 18 of 26
Page 19
2006/2356
Page 19 of 26
[OCR of page images]
2006/2356
Notice
Concurrence Agency Response
This notice is issued by the Environmental Protection Agency pursuant to Sections 3.3.16 and 3.3.78 of the Integrated
Planning Act 1997 to advise of a decision or action.
Sunshine Coast Regional Council cc: Mr John Hofmann
PO Box 141 c/- Jones, Flint & Pike Pty LTD.
TEWANTIN, QLD 4565 PO Box 6
MAROOCHYDORE, QLD 4006
Our reference: 308608
Dear Sir/Madam
Re: Referral for Concurrence Agency Response
The Environmental Protection Agency (EPA) wishes to advise that the referral for a concurrence agency
response relating to the Nature Conservation (Koala) Conservation Plan 2006 and Management Program
2006-2016 (the Koala Plan), received on 8 December 2006, has been assessed and decided on 28 April
2008.
Property/Location: 99 Hollett Road, Noosaville
a’
RE yep
29 APR 2008
Lot 2 on SP 179590
Details of the Recommendation
Aspect of Development
Concurrence Response for Development in a Koala Habitat Area.
Reconfiguration of a lot within a Koala Conservation Area resulting in additional lots.
Recommendation
Approve in full with conditions.
The Approved Plans
The approved plans and/or documents for this approval are:
Plan/Document No. Plan/Document Name Date
M1775-11E Figure 1 Overlay of Proposed Plan of Development on ‘4 March 2008
Vegetation Categories and Koala Habitat Types
739609 (lot 2) — Koala Habitat Management Plan - prepared by Cardno | 7 March 2008
KHMP-01
Page 1 of 6 - AF0B0109
° Queensland Government
Environmental Protection Agency
Environmental Protection Agency Queenstand Parks and Wildlife Service
www.epa.gid.gov.au ABN 87 221 158 786
Page 19 of 26
Page 20
2006/2356
Page 20 of 26
[OCR of page images]
2006/2356
ecoaccess
environmenial licences and permits
Notice
Concurrence Agency Response
739609 (lot 2) — Buffer Rehabilitation and Management Plan - prepared 7 March 2008
BRMP-01 by Cardno
EPA Concurrence Conditions of Approval
The following conditions are to be placed on the final decision notice which pertain to fulfilling the
requirements of the Koala Plan for committed development in a Koala Conservation Area.
Retention of Koala Habitat Trees
1. All koala habitat trees with a height of 4m or greater or a trunk diameter of 10cm or more at
1.3m above the ground are not to be cleared if they occur within the following areas:
a. outside of the approved building envelopes as depicted on the Koala Habitat Management
Plan, Plan Number 739609 (lot 2)-KHMP-01 (dated 7 March 2008);
b. Mandatory Building Setback area as defined within Figure 1 of the Town Planning Report
produced by Cardno {dated 7 March 2008);
c. within the remnant vegetation located within proposed Lot 3 described as Habitat Management
Area A on the Koala Habitat Management Plan (739609 (lot 2)-KHMP-01 dated 7 March 2008);
d. within proposed Lot 1.
Koala habitat trees are defined in the Nature Conservation (Koala) Conservation Plan 2006. They include all
species of Angophora, Corymbia, Eucalyptus, Lophostemon and Melaleuca genera.
Building Envelopes
2. Building envelopes of no greater than 2000m? are to be sited in accordance with the Koala
Habitat Management Plan, Plan Number 739609 (lot 2)-KHMP-01 (dated 7 March 2008) on
proposed lots 2, 3, and 4,
3. Building envelopes are to include all infrastructure, such as dwellings, sheds, » barbeque areas,
and effluent disposal areas. ee
4, The required Fuel Reduced Zones and Fuel Free Zones for bushfire management purposes are
to be wholly contained within the approved building envelope area.
Rehabilitation of Koala Conservation Area
Rehabilitation of koala habitat must be undertaken in accordance with the following requirements:
5. Rehabilitation of the Koala Conservation Area must be undertaken in accordance with the
Koala Habitat Management Plan (739609 (lot 2) - KHMP-01 dated 7 March 2008) and the
Buffer Rehabilitation and Management Plan (739609 (lot 2) - BRMP-01 dated 4 March 2008)
within the following areas:
a. Habitat Management Area B (proposed lots 1, 2, and 4) as described on Plan 739609 (lot 2)
- KHMP-01 dated 7 March 2008;
Page 2 of 6 « AF080109 Environmental Protection Agency
Page 20 of 26
Page 21
2006/2356 Page 21 of 26 [OCR of page images] 2006/2356 “ecoaccess environmental licences and permits Notice Concurrence Agency Response b. Habitat Management Area C (proposed lot 3) as described on Plan 739609 (lot 2) - KHMP- 01 dated 7 March 2008. 6. Revegetation within the areas listed in condition 5 are to include canopy and understorey species and meet the following requirements: a. canopy plantings are to utilise all of the following species: i. Eucalyptus robusta; ii. Melaleuca quinquenervia; iii, Eucalyptus racemosa; iv. Corymbia intermedia; and vy. Lophostomen suaveolens. b. understorey species are to utilise plants based on the surrounding regional ecosystem 12.3.5; c. densities, composition, and distribution of plants should be based on the surrounding regional ecosystem 12.3.5; all koala habitat tree species are to be derived from local seed stock; e. suitable protective measures are required to be installed around the rehabilitation area(s) at the time of planting and remain in place until the maintenance period has finished. Please refer to (i) for maintenance requirements; f. all revegetation must be completed within one (1) year of the date an operational works approval is issued by Sunshine Coast Regional Council; and g. maintenance of all completed revegetation is to be undertaken by the applicant over a period of two (2) years, commencing from the date revegetation is completed. Maintenance actions are to address the following: i. stabilisation of soil structure; ii. replacement of dead or diseased tree plantings; iii. regular watering, taking into consideration current water restrictions; and iv. removal and management of noxious plant and environmental weed species. 7. Habitat Management Area B is to be rehabilitated in accordance with condition 6 and will meet the following requirements: a. Plantings are to be undertaken over an area totalling 2000m? within proposed lots 1, 2 and 4, outside of the building envelopes; b. Aminimum of 50 canopy stems and 100 understorey stems are to be planted. Densities, composition, and distribution of plants should be based on the naturally occurring adjacent regional ecosystem 12.3.5. 8. Habitat Management Area C is to be rehabilitated in accordance with condition 6 and will meet the following requirements: a. Plantings will be undertaken over an area of 1000m? within proposed lot 3 (areas depicted in green cross-hatch on plan number 739609 (lot 2) - BRMP-01 dated 3 March 2008). Page 3 of 6 » AF080109 Environmental Protection Agency Page 21 of 26
Page 22
2006/2356 Page 22 of 26 [OCR of page images] 2006/2356 ecoaccess . environmental licences and permits Notice Concurrence Agency Response b. A minimum of 25 canopy stems and 50 understorey stems are to be planted. Densities, composition, and distribution of plants should be based on the naturally occurring adjacent regional ecosystem 12.3.5; c. active management of remnant vegetation contained within proposed tot 3 must be undertaken and is to include monitoring and maintenance of pest weeds and animals, soil erosion and the restriction of detrimental land uses. Bushfire 9. No clearing of koala habitat trees 4m in height or greater or a trunk diameter of 10cm or more at 1.3m above the ground in the areas designated for Mandatory Building Setback as described on the Buffer Rehabilitation and Management Plan (739609 (lot 2) - BRMP-01 dated 3 March 2008) is to occur. 10. Any future bushfire management activities undertaken within the proposed lots (1-4) must be undertaken in a manner which minimises degradation to koala habitat. Landscaping 11. At least 70% of any landscaping within the proposed lots, other than what is required for rehabilitation is to consist of Australian natives, 50% of which are to be native to the local area and include koala habitat trees species derived from local seed stock. Clearing of Koala Habitat Trees 12. The clearing of koala habitat trees must be undertaken in accordance with sections 15 and 16 of the Nature Conservation (Koala) Conservation Plan 2006. 13. The applicant shall ensure that all employees, contractors, subcontractors, agents or any other person engaged or employed to carry out the clearing of vegetation under this Development Permit comply at all times with the requirements of this Development Permit and do not clear any vegetation that is not approved to be cleared under this Development Permit or in a manner that is inconsistent with it. 14. The applicant shall notify the Senior Project Officer, Sustainable Communities via email at [email protected] or tetephone EPA Customer Service Centre (07) 3227 8185, at least two (2) business days prior to the commencement of any native vegetation clearing, of the date clearing is to commence and the koala spotter to be used. ‘ 15. Construction and any associated clearing on the subject site must be limited to the hours between 6am and 6pm. 16. During construction, vegetation to be retained must be clearly identified and the driving and parking of vehicles, as well as stockpiling of soil and other materials, must be carried out away from the root zone of trees to be retained. Dogs 17. Domestic dogs are not permitted on the site during construction. The applicant shail ensure that all employees, contractors, subcontractors, agents or any other person engaged or employed on the site are aware of this requirement. Page 4 of 6 - AF080109 Environmental Protection Agency Page 22 of 26
Page 23
2006/2356 Page 23 of 26 [OCR of page images] 2006/2356 “ecoaccess environmentel licences and permits Notice Concurrence Agency Response 18. Any domestic dogs to be kept on proposed lots 1-4 once the construction phase is completed Fencing are to be secured within the designated building envelope or an area around the dwelling via koala exclusion fencing. 19. Any fencing to be constructed on the boundary of the proposed allotments will be koala friendly; 20. The installation of new boundary fences within the development site, and ongoing maintenance shalt minimise the clearing of koala habitat trees. Traffic and Road Design 21. Appropriate koala sensitive road design elements must be implemented for the new road and Education access easement including the following: i, The new internal road to the allotments is to have a speed limit of a maximum of 40 km/hr at all times; ii, Koala signage (which shows a koala and the speed limit) is to be erected at the entrance to the site off Hollett Road to alert residents and visitors of koalas on the site and required speed; iii, Any landscaping to be placed either side of the new internal road and access easement is to be setback at least 1 metre from the pavement to ensure greater visibility of koalas. 22. The applicant is required to develop and articulate educational material to residents within the a) b) c) q) e) e) f) 9) development to raise awareness of the areas koaia habitat values and the requirements of this development. Information should include topics such as: Koala sensitive dog ownership Importance of retaining koala food trees and other native vegetation Encourage the planting of appropriate koala food trees Fencing requirements Koala friendly backyards - including koala friendly fencing and ropes in pools Keep outdoor lighting to a minimum after 6pm at night and before Gam the next morning near occupied trees, or trees known to be utilised by neighbourhood koalas Drive slowly and watch for koalas on local roads Building envelopes 5. Assessment Manager Responsibilities Please note that it is a requirement under Sections 3.5.15 and 3.5.17 of the integrated Planning Act 1997 that a copy of the final Decision Notice (which includes EPA's concurrence response) for this application issued by the Sunshine Coast Regional Council, be forwarded to each referral agency. Therefore could you please send a signed hardcopy to the EPA's Ecoaccess Customer Service Unit at PO Box 155, Brisbane Albert Street, 4002 and an electronic copy to [email protected] 5 of 6 + AF080109 Environmental Protection Agency Page 23 of 26
Page 24
2006/2356 Page 24 of 26 [OCR of page images] 2006/2356 ecoaccess - environmental licances and permits Notice Concurrence Agency Response Defi “Koala friendly fencing” is defined as a fence that: ions a. allows koalas to easily climb through or over the fence by choosing materials such as post and rail and leaving at feast a 30 centimetre gap between ground level and the first rail or strand; or b. provides a means for koalas to get over a fence that cannot be easily climbed by: i. instailing a timber post leaning against the fence at a 45 degree angle on either side; ji. planting vegetation within-close proximity on either side of the fence to provide a natural ladder; iii. installing planks or panels horizontally along the top of the fence to provide a walkway; and iv. building the fence around existing trees and vegetation “Koala exclusion fencing” is defined as a fence that: a. has a gap of less than 10cm between the ground and the fence and nearby trees and shrubs should be at least 3m away from the exclusion fencing; and . is made of materials that a koala cannot easily grip (eg cotorbond metal fence); or is a fence that has smooth metal or perspex sheets of at least 50cm in height attached to the tap of fencing so that a koala cannot get a grip to climb over; or d. floppy top design fence so that a koala can climb the fence but it will flop over with the animals weight and force it to drop back to the ground. These are often made with chain link materiat. og “Koala habitat trees” are defined in the Nature Conservation (Koala) Conservation Plan 2006. They include tree species of the Angophora, Corymbia, Eucalyptus, Lophostemon and Melaleuca genera. “Subject site” means lot 2 SP 179590. Assessment Manager Responsibilities Please note that it is a requirement under Sections 3.5.15 and 3.5.17 of the Integrated Planning Act 1997 that a copy of the final Decision Notice (which includes EPA's concurrence response) for this application be forwarded to each referral agency. Therefore could you please send a signed hardcopy to the EPA's Ecoaccess Customer Service Unit at PO Box 155, Brisbane Albert Street, 4002 and an electronic copy to [email protected] you require more information, please contact Berlinda Ezzy, the Project Manager, via email or the telephone number listed below. Yours sincerely Kp pbbla— oF Enquiries: R.D. Williams 24 Berlinda Ezzy Director Koala Conservation Unit Threatened Species Level 8, 160 Ann Street Sustainable Communities CITY EAST QLD 4002 Environmental Protection Agency Phone: (07) 3404 3364 Fax: (07) 3227 6386 28-APRIL-O8 Email:[email protected] Page 6 of 6 » AF080109 - Environmental Protection Agency Page 24 of 26
Page 25
2006/2356
Appeal Rights
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
(5) If an application is processed under section
The following is an extract from the Integrated 6.1.28(2), appeal rights for submitters for the
Planning Act (Chapter 4). application are available only for the aspects of the
development that would have required public
Division 8 - Appeals to court relating to
notification under the repealed Act.
development applications
Appeals by applicants (6) If an application involves assessment
4.1.27.(1) An applicant for a development against a concurrence agency code, appeal rights
application may appeal to the court against any of for submitters for the application are not available
the following- against the part of the approval that represents the
(a) the refusal, or the refusal in part, of a concurrence agency’s response for the code.
development application; Appeals by advice agency submitters
(b) a matter stated in a development approval, 4.1.29.(1) An advice agency may, within the limits
including any condition applying to the of its jurisdiction, appeal to the court about the
development, and the identification of a code giving of a development approval for a
1
under section 3.1.6; development application if-
(c) the decision to give a preliminary approval (a) the development application involves impact
when a development permit was applied for; assessment; and
(d) the length of a currency period; (b) the advice agency told the applicant and the
(e) a deemed refusal. assessment manager to treat its response to
the application as a submission for an appeal.
(2) An appeal under subsection (1)(a) to (d)
must be started within 20 business days (the (2) The appeal must be started within 20
“applicant’s appeal period”) after the day the business days after the day the decision notice or
decision notice or negotiated decision notice is negotiated decision notice is given to the advice
given to the applicant. agency as a submitter.
(3) An appeal under subsection (1)(e) may be Appeals for matters arising after approval given
started at any time after the last day a decision on (co-respondents)
the matter should have been made. 4.1.30.(1) For a development approval given for a
Appeals by submitters development application, a person to whom any of
the following notices have been given may appeal
4.1.28.(1) A submitter for a development
to the court against the decision in the notice-
application may appeal to the court about-
(a) a notice giving a decision on a request for
(a) the giving of a development approval, including
extension of the currency period for an
any conditions (or lack of conditions) or other
approval;
provisions of the approval; or
(b) a notice giving a decision on a request to make
(b) the length of a currency period for the approval.
a minor change to an approval.
(2) The appeal must be started within 20
(2) The appeal must be started within 20
business days (the “submitters appeal period”)
business days after the day the notice of the
after the day the decision notice or negotiated
decision is given to the person.
decision notice is given to the submitter.
(3) Subsection (1)(a) does not apply if the
(3) If a person withdraws a submission before
approval resulted from a development
the application is decided, the person may not
application (superseded planning scheme)
appeal the decision.
that was assessed as if it were an
(4) If an application involves both impact application under a superseded planning
assessment and code assessment, appeal rights scheme.
for submitters are available only for the part of the
(4) Also, a person who has made a request
application involving impact assessment.
mentioned in subsection (1) may appeal to
the court against a deemed refusal of the
request.
1
Section 3.1.6 (Preliminary approval may override
local planning instrument)
Page 25 of 26
Page 26
2006/2356
(5) An appeal under subsection (4) may be For Building Works Only
started at any time after the last day the Rights of appeal conferred by Section 4.2.9 of the
decision on the matter should have been Integrated Planning Act 1997 as follows:
made.
Division 3 – Appeals to tribunals relating to
development applications
Division 9 - Appeals to court about other
matters Appeals by applicants
Appeals for matters arising after approval given
(no co-respondents)
4.2.9(1) An applicant for a development application
4.1.31.(1) A person to whom any of the following may appeal to the Building and Development
notices have been given may appeal to the court Tribunal against any of the following-
against the decision in the notice-
(a) the refusal, or the refusal in part, of a
(a) a notice giving a decision on a request to development application;
change or cancel a condition of a development
approval. (b) a matter stated in a development approval,
2 including any condition applying to the
(b) a notice under section 6.1.44 giving a decision development, and the identification of a code
to change or cancel a condition of a under section 3.1.6;
3
development approval.
(c) the decision to give a preliminary approval when a
(2) The appeal must be started within 20 development permit was applied for;
business days after the day the notice of the
(d) the length of a period mentioned in section 3.5.21
decision is given to the person.
currency period;
(3) Also, a person who has made a request
(e) a deemed refusal.
mentioned in subsection (1)(a) may appeal
to the court against a deemed refusal of the (2) An appeal under subsection (1)(a) to (d) must
request. be started within 20 business days (the “applicant’s
appeal period”) after the day the decision notice or
(4) An appeal under subsection (3) may be negotiated decision notice is given to the applicant.
started at any time after the last day the
(3) An appeal under subsection (1)(e) may be
decision on the matter should have been started at any time after the last day a decision on the
made. matter should have been made.
Appeals against decisions to change approval The Registrar for the Building and Development
conditions under the repealed Act Tribunal may be contacted at the website
4.1.33A.(1) A person who is dissatisfied with a http://www.localgovernment.qld.gov.au/
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act
may appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
(2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice
of the decision is to be given to the person.
(3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on
the matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to
the court against the decision or the conditions
applied.
(2) The appeal must be started within 20
business days after the day notice of the decision
is given to the applicant.
2
Section 6.1.44 (Conditions may be changed or
3
cancelled by assessment manager or concurrence Section 3.1.6 (Preliminary approval may override
agency in certain circumstances) local planning instrument)
Page 26 of 26
Used in these records
Decision Notice - 010.2006.00002356.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.