Skip to the record
Accept no substitutions.

Council archive · source document

Decision Notice - 010.2006.00002356.001 [As Published] · 152006.2356

of 26

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

   2006/2356




Page 21 of 26


[OCR of page images]
2006/2356

 

“ecoaccess

environmental licences and permits
Notice

Concurrence Agency Response

 

b. Habitat Management Area C (proposed lot 3) as described on Plan 739609 (lot 2) - KHMP-
01 dated 7 March 2008.

6. Revegetation within the areas listed in condition 5 are to include canopy and understorey
species and meet the following requirements:
a. canopy plantings are to utilise all of the following species:

i. Eucalyptus robusta;

ii. Melaleuca quinquenervia;
iii, Eucalyptus racemosa;

iv. Corymbia intermedia; and
vy. Lophostomen suaveolens.

b. understorey species are to utilise plants based on the surrounding regional ecosystem
12.3.5;

c. densities, composition, and distribution of plants should be based on the surrounding
regional ecosystem 12.3.5;

all koala habitat tree species are to be derived from local seed stock;

e. suitable protective measures are required to be installed around the rehabilitation area(s) at
the time of planting and remain in place until the maintenance period has finished. Please
refer to (i) for maintenance requirements;

f. all revegetation must be completed within one (1) year of the date an operational works
approval is issued by Sunshine Coast Regional Council; and

g. maintenance of all completed revegetation is to be undertaken by the applicant over a
period of two (2) years, commencing from the date revegetation is completed. Maintenance
actions are to address the following:

i. stabilisation of soil structure;
ii. replacement of dead or diseased tree plantings;
iii. regular watering, taking into consideration current water restrictions; and
iv. removal and management of noxious plant and environmental weed species.

7. Habitat Management Area B is to be rehabilitated in accordance with condition 6 and will meet
the following requirements:

a. Plantings are to be undertaken over an area totalling 2000m? within proposed lots 1, 2 and
4, outside of the building envelopes;

b. Aminimum of 50 canopy stems and 100 understorey stems are to be planted. Densities,
composition, and distribution of plants should be based on the naturally occurring adjacent
regional ecosystem 12.3.5.

8. Habitat Management Area C is to be rehabilitated in accordance with condition 6 and will meet
the following requirements:

 

a. Plantings will be undertaken over an area of 1000m? within proposed lot 3 (areas
depicted in green cross-hatch on plan number 739609 (lot 2) - BRMP-01 dated 3
March 2008).
Page 3 of 6 » AF080109 Environmental Protection Agency

Page 21 of 26

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2006.00002356.001 [As Published].pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.