Council archive · source document
Decision Notice - 010.2006.00002356.001 [As Published] · 152006.2356
2006/2356 Page 22 of 26 [OCR of page images] 2006/2356 ecoaccess . environmental licences and permits Notice Concurrence Agency Response b. A minimum of 25 canopy stems and 50 understorey stems are to be planted. Densities, composition, and distribution of plants should be based on the naturally occurring adjacent regional ecosystem 12.3.5; c. active management of remnant vegetation contained within proposed tot 3 must be undertaken and is to include monitoring and maintenance of pest weeds and animals, soil erosion and the restriction of detrimental land uses. Bushfire 9. No clearing of koala habitat trees 4m in height or greater or a trunk diameter of 10cm or more at 1.3m above the ground in the areas designated for Mandatory Building Setback as described on the Buffer Rehabilitation and Management Plan (739609 (lot 2) - BRMP-01 dated 3 March 2008) is to occur. 10. Any future bushfire management activities undertaken within the proposed lots (1-4) must be undertaken in a manner which minimises degradation to koala habitat. Landscaping 11. At least 70% of any landscaping within the proposed lots, other than what is required for rehabilitation is to consist of Australian natives, 50% of which are to be native to the local area and include koala habitat trees species derived from local seed stock. Clearing of Koala Habitat Trees 12. The clearing of koala habitat trees must be undertaken in accordance with sections 15 and 16 of the Nature Conservation (Koala) Conservation Plan 2006. 13. The applicant shall ensure that all employees, contractors, subcontractors, agents or any other person engaged or employed to carry out the clearing of vegetation under this Development Permit comply at all times with the requirements of this Development Permit and do not clear any vegetation that is not approved to be cleared under this Development Permit or in a manner that is inconsistent with it. 14. The applicant shall notify the Senior Project Officer, Sustainable Communities via email at [email protected] or tetephone EPA Customer Service Centre (07) 3227 8185, at least two (2) business days prior to the commencement of any native vegetation clearing, of the date clearing is to commence and the koala spotter to be used. ‘ 15. Construction and any associated clearing on the subject site must be limited to the hours between 6am and 6pm. 16. During construction, vegetation to be retained must be clearly identified and the driving and parking of vehicles, as well as stockpiling of soil and other materials, must be carried out away from the root zone of trees to be retained. Dogs 17. Domestic dogs are not permitted on the site during construction. The applicant shail ensure that all employees, contractors, subcontractors, agents or any other person engaged or employed on the site are aware of this requirement. Page 4 of 6 - AF080109 Environmental Protection Agency Page 22 of 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2006.00002356.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.