Vegetation Protection and Weed Removal
18. Existing trees on site and within the road reserve are to be retained, except where required to
be removed due to a building approval or the conduct of an approved use. Driveways and
buildings sites should be designed to avoid the removal of native vegetation.
19. All Class 1, Class 2 and Class 3 pest plants declared under the Land Protection (Pest and
Stock Route Management) Act 2002 and including all Camphor Laurel trees on the property
are to be controlled on the site prior to Council endorsement of the Plan of Survey. In this
context “controlled” shall mean, for class 1 and 2 pests, completely eradicated. For class 3
pests it shall mean removal of the plants where they threaten environmentally significant areas
of the site such as riparian zones and areas of natural vegetation.
Where class 3 plants are removed as a result of this condition and there is not sufficient
natural regeneration of native species, the areas shall be replanted with endemic native
species so that a sustainable natural ecosystem is restored.
Council’s Conservation Management Supervisor will not inspect the site until 30 days after the
weed treatment and replanting is complete.
20. If there is any cleared vegetation it shall be suitably processed by one of the following
methods and removed from the site:-
20.1. Processing through a wood chipper or shredder. The resulting mulch is to be
stockpiled loose in heaps of less than 1000 cubic metres, less than 2.5 metres high
with a minimum of 10 metres between edges of heaps.
20.2. Disposal for firewood.
20.3. Disposal for landscaping purposes.
20.4. Transport to alternative site for breaking down materials provided that all necessary
permits have been obtained to allow the alternate site to be used for this purpose.
The disposal method for clearing works is to be submitted in conjunction with an application
for a Development Permit for Operational Work. The Applicant is advised that other methods
may be considered provided full details of the method are submitted.
The Applicant is also advised that burning off is an unacceptable method of disposal.
Services
21. Any alteration of a public utility or other facility necessitated by the development of the land or
associated construction works either internal or external to the site shall be at no cost to
Council.
Power Supply
22. An electricity service shall be provided to all lots unless already provided. The electricity
service to proposed Lot 4 shall be provided overhead within the new road and then to a
property pole located inside the boundary of proposed Lot 4. An electricity service to proposed
Lots 2 and 3 shall be provided overhead within the new road then underground to a property
pole located inside the boundary of proposed Lot 2 and extending underground to the end of
the access handle.
In this regard, an approved ENERGEX Electrical Design Consultant shall work in conjunction
with Council’s Manager - Works Support to prepare detailed designs of the electrical proposal.
The detailed deigns shall then be submitted to ENERGEX for approval and a copy of their
approval submitted to Council in conjunction with a “Certificate of Electricity Supply for
Proposed Subdivisions” (prepared by an approved ENERGEX Electrical Design Consultant)
prior to Council endorsing the Plan of Survey.
Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant shall
be wholly at the applicant’s expense and shall not entail a financial encumbrance on future
purchasers of the proposed lots.
Page 4 of 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2006.00002356.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.