Council archive · source document
Decision Notice - 010.2006.00002356.001 [As Published] · 152006.2356
2006/2356
Access (Driveways)
9. A 4m wide sealed vehicular access driveway shall be constructed from the new proposed
road for the full length of the access handle on proposed Lot 2. The driveway shall incorporate
a passing bay approximately 40m from the proposed new road. The vehicle access shall be
designed and constructed in accordance with Council’s Planning Scheme Policy PSP 5
Engineering Design Standards – Roads, Drainage and Earthworks and Council’s Standard
drawings.
10. The applicant shall provide a vehicle access to each lot. The access shall be in accordance
with Council’s Planning Scheme Policy PSP 5 Engineering Design Standards – Roads,
Drainage and Earthworks and Council’s Standard drawings.
11. Those sections of the existing vehicle access to proposed Lot 1 that stand outside of the
boundaries of proposed lot 1 shall be removed.
12. Prior to commencement of work relating to a Development Permit for Operational Works, the
Applicant shall sign a written undertaking to be responsible for the full cost of repairs to road
pavement, footpath, or other Council property damaged as a result of construction of the
proposed development.
In all cases, Council reserves the right to carry out rectification works in an emergency and
where no reasonable attempt has been made to complete the rectification works as part of the
development.
All costs incurred by Council in any rectification works shall be repaid to Council prior to the
endorsement of the Plan of Survey.
Easements
13. Existing easement EMT C SP179590 on Lot 2 on SP179590 shall be extinguished.
14. A 10m wide access and services easement shall be created over Lot proposed 2 from the end
of the proposed new road reserve for the full length of the access handle on proposed Lot 2.
The easement shall benefit proposed Lot 3.
15. Prior to Council endorsement of the Plan of Survey, a duly executed copy of any required
Grant of Easement shall be submitted to Council for perusal.
Any changes required by Council’s Solicitor shall be attended to prior to endorsing the Plan of
Survey.
Any necessary Titles Office forms requiring the consent of Council is to be submitted prior to
the endorsing of the Plan of Survey.
16. Prior to the endorsement of the Plan of Survey, the Applicant's Solicitor shall give Council's
Solicitor an appropriate undertaking in writing that in conjunction with lodgement of the Plan of
Survey at the Land Titles Office, the Title Deed and the easement documents will also be
lodged and any additional Titles Office forms or requisitions requiring the consent of Council
being attended to forthwith.
Effluent Disposal
17. The design of the on-site effluent disposal system and disposal area (land application area)
shall be in accordance with Council’s Planning Scheme Policy PSP24 - Effluent Disposal and
the relevant report for the lot from the Effluent Disposal Reports (Job Numbers 07/1634-1,
07/1634-2, 07/1634-3 dated 18/02/2008 by Global Testing.
Please note the land application area shall be positioned to achieve the greatest possible
setback to any permanent or intermittent watercourse and at least 15m from any underground
rainwater tanks.
Page 3 of 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2006.00002356.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.