PA6-L




Our reference:        2008-18430 SPL



13 October 2020

 Noosa Shire Council
 C/- BMT Global
 Level 8, 200 Creek St
 SPRING HILL QLD 4004
 [email protected]

Attention:       Ms Lisa McKinnon



Dear Ms McKinnon

Pre-lodgement advice

Thank you for your correspondence received on 25 August 2020 in which you sought pre-lodgement
advice from the State Assessment and Referral Agency (SARA) regarding the proposed development
described below.

Reference information
 Departmental role:               Assessment manager
 Departmental jurisdiction:       Schedule 10, Part 5, Division 3, Table 1 – Environmentally relevant
                                  activities (Schedule 8, Table 4, Item 1)
                                  Schedule 10, Part 6, Division 3, Subdivision 3, Table 1 – Marine
                                  plants
                                  Schedule 10, Part 17, Division 2, Table 1 – Tidal works or works in a
                                  coastal management district (Schedule 8, Table 4, Item 3(l)(ii))
                                  Schedule 10, Part 17, Division 3, Table 2 – Tidal works or work in a
                                  coastal management district


Location details
 Street address:                 Claude Batten Drive, Noosa Heads
 Real property description:      Lot 114 on MCH839107
 Local government area:          Noosa Shire Council (the council)
 Pre-lodgement advice            The council are proposing to undertake remediation and rehabilitation
 request:                        of erosion that is occurring at the Noosa Spit (along the beach area
                                 known as 'Dog Beach'). The works will involve dredging of sand


                                                                      South East Queensland (North) regional
                                                                      office
                                                                      Mike Ahern Building, Level 3, 12 First
                                                                      Avenue, Maroochydore
 Page 1 of 10                                                         PO Box 1129, Maroochydore QLD 4558
Log in to download the original file

Appendix A_2008-18430 SPL - Pre-lodgement advice (1).pdf · 227 KB (small file)

Full text of the other 9 pages

Page 2

                                                                                                       2008-18430 SPL




                                        material from the Noosa River (unallocated state land), beach
                                        nourishment and installation of two 'sand plugs' to divert flows into the
                                        central channel at the river mouth. Seeking advice about the relevant
                                        State triggers and application requirements.

Details of proposal
 Development type:                      Material change of use AND Operational work
 Development description:               Environmentally relevant activity – 16(1)(b) and Tidal works involving
                                        beach nourishment


Supporting information
 Drawing/report title              Prepared by                  Date            Reference no.      Version/issue
 Noosa Spit Shoreline              BMT                          31/10/2019      R.B23636.001.      2
 Erosion Management Plan                                                        02.SEMP_final
                                                                                .docx
 General Arrangement               BMT                          02/09/2020      A10342-01-         B
 Concept Plan                                                                   01A
 Acid Sulfate Soils and            Coffey Geotechnics           17/03/2011      GEOTKPAR01         2
 Dredging Assessment               Pty Ltd                                      783AA/A

SARA has carried out a review of the information provided and the impacts of the proposal. The following
advice outlines the matters of interest to the department and matters that should be addressed if you
lodge your development application with the department as the assessment manager.

SARA jurisdiction and fees
1. Based on the information provided, a future development application will require assessment by the
   Chief Executive of the Planning Act 2016 (Planning Act), through SARA, under the following
   provisions of the Planning Regulation 2017 (Planning Regulation):
        Schedule 10, Part 5, Division 3, Table 1 – Environmentally relevant activities (Schedule 8, table
         4, Item 1). The applicable fee to be paid in accordance with Schedule 10, Part 5, Division 3,
         Table 1, Item 5(b)(i).
        Schedule 10, Part 6, Division 3, Subdivision 2, Table 1 – Operational work involving marine
         plants. The applicable referral fee to be paid in accordance with Schedule 10, Part 6, Division 3,
         Subdivision 2, Table 1, Item 5.
        Schedule 10, Part 17, Division 3, Table 1 – Tidal works or work in a coastal management
         district. The applicable referral fee to be paid in accordance with Schedule 10, Part 17, Division
         3, Table 1, Item 8(a)(i).
        Schedule 10, Part 17, Division 3, Table 2 – Tidal works or work in a coastal management
         district. The applicable referral fee to be paid in accordance with Schedule 10, Part 17, Division
         3, Table 2, Item 8(c).
    A formal development application should demonstrate compliance with the performance outcomes
    (PO) and acceptable outcomes (AO) of the relevant modules of the State Development Assessment
    Provisions (SDAP). SARA recommends the following be submitted with the application at formal
    lodgement:
         An assessment against the latest version of SDAP:
            o State code 7: Maritime safety (State code 7)
            o State code 8: Coastal development and tidal works (State code 8)
            o State code 11: Removal, destruction or damage of marine plants (State code 11), and


 State Assessment and Referral Agency                                                                    Page 2 of 10

Page 3

                                                                                             2008-18430 SPL



            o State code 22: Environmentally relevant activities (State code 22).
         A Shoreline Erosion Management Plan.
   The State Development Assessment Provisions are available at:
   https://planning.dsdmip.qld.gov.au/planning/better-development/the-development-assessment-
   process/the-states-role/state-development-assessment-provisions
   Further guidance on what information needs to be supplied with a formal development application can
   be obtained from the Department of Transport and Main Roads’ State Development Assessment
   Provisions (SDAP) Supporting Information available at
   https://www.tmr.qld.gov.au/Community-and-environment/Planning-and-development/Planning-and-
   development-assessment-under-the-Planning-Act/Assessable-development
Environmentally Relevant Activity (ERA) 16
1. Based on the information provided, it is advised that the proposed development constitutes:
   • ERA 16(1)(b) dredging more than 10,000t but not more than 100,000t in a year.

    Based on the information provided, the proposed dredging activity will include both the removal of
    dredge spoil and land/sea based disposal of dredge spoil.

    This ERA threshold is classified as a concurrence ERA under the Environmental Protection
    Regulation 2019 (EP Reg) and therefore will trigger a material change of use (MCU), which also
    requires a development approval under the Planning Act 2016.

2. The development application will also be taken as an Environmental Authority (EA) application under
   section 115 of the Environmental Protection Act 1994.

    Please refer to https://www.business.qld.gov.au/running-business/environment/licences-
    permits/applying/technical for a number of technical guidelines, which outline the technical
    information requirements for applications for an environmental authority.

    It should be noted, multiple Environmental Authorities (EAs) can exist over the one site, as long as
    they are different operators, i.e. the same operator cannot hold multiple EAs for the same ERA.

    For further information on combining or amalgamating environmental authorities, please refer to the
    following website:
    https://www.business.qld.gov.au/running-business/environment/licences-permits/change-
    combine/combine

3. In the EA application please provide information on, but not limited to, the following:
    Operational plans for the removal of dredge spoil including:
               o the proposed footprint of the dredge area
               o the method by which the dredge spoil will be removed
               o the volume of dredge spoil to be removed
               o the proposed depth of extraction, and
               o physical and chemical characteristics of the dredge spoil including potential
                   contaminants in accordance with the National Assessment Guidelines for Dredging
                   2009.
    Operational plans for the disposal of dredge spoil including:
               o the proposed location for disposal of dredge spoil
               o the method by which the dredge spoil will be transported and placed in the area
               o the method by which the spoil is to be contained within the area
               o the method by which the spoil will be dewatered


 State Assessment and Referral Agency                                                          Page 3 of 10

Page 4

                                                                                              2008-18430 SPL



                o expected water quality parameters for the discharge
                o the current and intended land use of the proposed disposal site, and
                o detail on how the dredge spoil disposal area will be made fit for future land use.
       An acid sulfate soil management plan detailing how any acid sulfate soils are to be managed.
       An ecological report identifying any significant ecological values (particularly matters of State
        environmental significance) within or adjacent to the proposed dredge footprint and disposal area
        that could be impacted as a result of the activity.

4. The application must address the PO’s for the environmental objectives of the operational
   assessment prescribed in Schedule 8, Part 3, Division 1 of the EP Reg.

    The application must include a technical assessment of the environmental risks to the receiving
    environment in relation to air, water, noise, land and waste associated with the activity/ies. The
    application must show how the PO’s for each environmental objective are met. Technical guidelines
    detailing the minimum information that should be supplied to support an application are available on
    the Business and Industry Portal:
    • Air: https://environment.des.qld.gov.au/assets/documents/regulation/era-gl-air-impacts.pdf
    • Land: https://environment.des.qld.gov.au/assets/documents/regulation/era-gl-land-impacts.pdf
    • Noise: https://environment.des.qld.gov.au/assets/documents/regulation/era-gl-noise-impacts.pdf
    • Water: https://environment.des.qld.gov.au/assets/documents/regulation/era-gl-water-impacts.pdf
    • Waste: https://environment.des.qld.gov.au/assets/documents/regulation/era-gl-waste-impacts.pdf

5. Please address the standard criteria as defined in Schedule 4 Dictionary of the Environmental
   Protection Act 1994 in regards to the proposed activity (including the dredging aspects and disposal
   of dredge spoil aspects).

6. The diagnostic tool function (link below) can be used to generate a report that will include how and
   where to apply, the application and annual fees that apply, how to determine environmental
   impacts/relevant Environmental Protection Policies, guidance materials to assist in the preparation of
   supporting information and additional resources.
   https://www.business.qld.gov.au/business/running/environment/licences-permits/form-fees-finder

7. Concurrence ERA
   Any development application made should provide a response to the latest version of the SDAP
   State code 22, in its entirety, identifying how the proposed development meets each PO by
   addressing all applicable AO’s.
8. As part of the application supporting documentation, a Shoreline Erosion Management Plan (SEMP)
   that has been reviewed and supported by the Department of Environment and Science (DES) will
   need to be provided. Please ensure the SEMP has been sent to [email protected] for
   technical review.

    Please note, DES does not endorse SEMPs, however it is critical to have it reviewed and supported
    by DES as it will be a key document to support any future development applications.
Tidal works or work is a coastal management district
9. State code 8
    Please provide a response to the latest version of the SDAP State code 8, in its entirety, identifying
    how the proposed development meets each PO.

10. Matters of State environmental significance (MSES)
    Following a preliminary investigation, the proposed works are within the following MSES:
    • Regulated Vegetation (defined watercourse).


 State Assessment and Referral Agency                                                           Page 4 of 10

Page 5

                                                                                             2008-18430 SPL




    The proposed works are adjacent to the following MSES:
    • Regulated Vegetation (essential habitat)
    • Wildlife Habitat (special least concern animal)
    • Wildlife Habitat (endangered or vulnerable)
    • Declared High Ecological Value Waters (wetland)
    • Declared Fish Habitat area (A and B areas)
    • Protected Area (estates)
    • High Ecological Significance Wetlands

11. To address PO16 of State code 8, it will be required to determine if there are any MSES on or
    adjacent to the proposed development site. A definition of MSES is available in Schedule 2 of the
    Environmental Offsets Regulation.

12. Environmental Reports Online (https://apps.des.qld.gov.au/report-request/environment/) can be used
    to conduct a desktop analysis to identify any mapped MSES that exists on (using the lot on plan
    option to search) and near the proposed site/s (using the central coordinates option to search).
    Where MSES are identified:
     Provide a targeted assessment to ground truth any MSES identified.
     Demonstrate how the development avoids adverse impacts on each MSES to the greatest extent
        practicable.
     Where the above is not reasonably possible, demonstrate how impacts on MSES have or will be
        minimised and/or mitigated to the greatest extent practicable.
     Demonstrate whether the development will have a Significant Residual Impact (SRI) on any
        identified MSES using the Queensland Treasury’s Significant Residual Impact Guideline
        (http://www.dlgrma.qld.gov.au/resources/guideline/planning/dsdip-significant-residual-impact-
        guideline.pdf). An assessment will need to be undertaken for each MSES to determine whether
        the proposed development will result in a SRI.
     Identify any potential offset obligation as per PO16 (3) of State code 8. For further advice on
        environmental offsets please visit the following website
        http://www.qld.gov.au/environment/pollution/management/offsets/ or contact DES to organise a
        meeting to discuss this.

    Please refer to the Guideline: State Development Assessment Provisions, State code 8: Coastal
    development and tidal works (https://environment.des.qld.gov.au/coastal/development/pdf/state-
    code8-coastal-development-tidal-works.pdf) in responding to State code 8.

    The guideline contains information on how to respond to particular PO’s and outlines specific
    information requirements. It should be noted that if the PO has no relevance to the proposed
    development a response of “not applicable” and a statement as to why it is not relevant is required.
    For this application, the following PO’s will require a detailed response: PO2 – PO5, PO8, PO11,
    PO13, PO16 and PO19- PO21.
    The following tools may be helpful for a desktop analysis and assessment:
     DES Environmental Reports Online
    https://apps.des.qld.gov.au/report-request/environment/
     DNRME Regulated Vegetation Mapping
        https://www.qld.gov.au/environment/land/management/vegetation/maps/map-request
     DES Map of Referable Wetlands
    https://environment.des.qld.gov.au/ecosystems/wetlands/referable-wetlands-form.php
     DES WetlandInfo
    https://wetlandinfo.des.qld.gov.au/wetlands/



 State Assessment and Referral Agency                                                          Page 5 of 10

Page 6

                                                                                                  2008-18430 SPL



     DES Protected Plants Flora Survey Trigger Map
    https://environment.des.qld.gov.au/licences-permits/plants-animals/protected-plants/map-request.php
     DES Species List
    https://apps.des.qld.gov.au/report-request/species-list/
     Queensland Wetland Buffer Guideline
    https://wetlandinfo.des.qld.gov.au/resources/static/pdf/resources/reports/buffer-guide/wetland-buffer-
    guideline-14-04-13.pdf
     Queensland Treasury SPP Interactive Mapping
    https://planning.dsdmip.qld.gov.au/planning/spa-system/plan-making-under-spa/state-planning-
    under-spa/state-planning-policy
13. Acid Sulfate Soils
    It is likely that acid sulfate soils will be present at this location. An application must also consider the
    risk of disturbing acid sulfate soils, as well as providing a statement about how the risk is intended to
    be managed. Issues regarding acid sulfate soils should be addressed when responding to SDAP
    State code 8, especially with regard to PO11.

    The Queensland Acid Sulfate Soil Technical Manual outlines relevant scientific information and
    guidelines for Acid Sulfate Soil Management (https://publications.qld.gov.au/dataset/acid-sulfate-soil-
    management-guidelines).
14. Development Description
    Any application made should include a detailed description of the proposed development and a
    description of the existing site conditions of the proposed development location. In particular, the
    following documentation should be provided:
     Description of the land intended to be developed, including:
          o the property address, tenure and real property description of the land, and
     Description of the development, including:
          o location of all built structures, or structures to be modified or demolished, as a result of the
             proposed development
          o description of any operational works occurring on site including expected timeframes;
          o any machinery to be used or stored on the site
          o staging of the development if applicable, and
     Detailed and appropriately scaled drawings and/or plans which clearly identify the location of
         proposed development, including:
          o adjacent real property boundaries
          o adjacent riverbanks, walls, sandbanks, structures, the limit of vegetation, and/or other
             principal features of the immediate area
          o relevant tidal planes (e.g. Highest Astronomical Tide (HAT), Mean High Water Springs)
          o the location and setting out details for cross-sections, and
          o any other information required to accurately define the area and to allow the site to be
             readily identified from the plan.

    All plans/drawings should include title, date and numbering suitable to identify the plan and should be
    mapped to GDA94 projection.
Removal destruction or damage of marine plants
15. The proposed works are likely to involve the removal, destruction or damage of marine plants.
       Marine plants include:
         o any plant (a tidal plant (including marine algae) that usually grows on or adjacent to tidal
             lands whether it is living, dead, standing or fallen, or
         o any plant material on tidal land (up to the level of HAT).
     Plants such as mangroves, mangrove fern, saltcouch or samphire species are considered marine
     plants regardless of whether or not they are above or below the level of HAT.

 State Assessment and Referral Agency                                                                Page 6 of 10

Page 7

                                                                                                 2008-18430 SPL



        -    Marine plants do not include:
                     a plant that is prohibited matter or restricted matter under the Biosecurity Act 2014,
                      or
                     a plant that is controlled biosecurity matter or regulated biosecurity matter under the
                      Biosecurity Act 2014.


    Marine plant protection applies irrespective of the tenure (e.g. unallocated state land and all state
    tenured lands, including private freehold and leasehold lands) of the land on which the plant occurs,
    the time the plant has been growing at the location, or the degree of or purpose of the disturbance.
    Under the Planning Regulation 2017, works involving the removal, destruction or damage of marine
    plants must be undertaken in accordance with the relevant accepted development requirements
    (ADR) or under a development approval (assessable development).
    The proposed works will not comply with the ADR as the proposal does not constitute any of the
    prescribed work types. A development approval will be required for assessable development that is
    the removal, destruction or damage of marine plants.
    If possible, avoiding marine plant disturbance would remove the need for an approval and potential
    fees for this component of the works.
    If the works require marine plant disturbance but cannot comply with the ADR, the applicant will need
    to provide the following in an application for a development approval:
        -    Completed copy of DA form 1
        -    A full response to the relevant sections of State code 11 of SDAP. Particular attention should
             be paid to the following POs:
                     All development – PO1 to PO15 and PO31
                     Erosion control structures and beach replenishment – PO17 to PO22
                     Dredging – PO23 to PO25
                  Temporary works – PO26 to PO28, and
        -    Relevant plans as per SARA’s DA Forms guide: Relevant plans, including:
                     the total amount of marine plants that will be disturbed, identifying portion of
                      permanent and/or temporary disturbance (in square meters or hectares)
                     the location of the marine plants to be disturbed in relation to the development works
                     the level of HAT, mean high water spring tide, and low water spring tide, and
                    location and extent of fish habitat within the development area, including creeks,
                     sand and/or yabby banks, drainage lines, lagoons and marshes.
                  Note: All plans should be able to be read to scale at A3 size.

16. PO1 to PO25 of State code 11, address critical issues relating to coastal development proposals
    which create the need to remove, destroy or damage marine plants. The applicant will need to
    respond to all relevant PO’s. Particular attention should be paid to the following PO’s.

    PO1 - The proposal must be justified in terms of need and alternative designs or locations that avoid
    or have a lesser impact on marine plants. Within an application it is recommended to provide
    evidence that demonstrates the utility of the dog beach is threatened and alternative solutions have
    been considered. Where an options analysis is used, provide a discussion detailing why the
    proposed works are the preferred solution.

    PO4 – the spatial extent of disturbance to marine plants is minimised. To meet this PO provide
    evidence that demonstrates the dredging and nourishment works have been designed to minimise
    the spatial extent of marine plant disturbance. Provide a marine plant disturbance plan that clearly
    shows all marine plant communities in the vicinity of all aspect of the works, the extent and area of
    permanent and temporary marine plant disturbance in relation to the construction footprint, and the
    level of HAT.



 State Assessment and Referral Agency                                                              Page 7 of 10

Page 8

                                                                                               2008-18430 SPL



   PO5 The timing of works avoids marine plant flowering, fish spawning and fish migration periods.
      The proposed works will need to be scheduled to avoid the peak spawning and migration times
       for common recreational and commercial fish species (incl. Whiting, flathead, sea mullet and
       some prawn species) that are known to spawn in / migrate through, estuarine waters.

   PO6 – To meet this PO provide evidence that demonstrates the impacts arising from the dredging
   and nourishment works have been considered and will be managed to avoid the unnecessary loss,
   degradation or fragmentation of marine plants, fish and fish habitats in the vicinity of the works.
      An application should discuss buffer zones and the proximity of the declared Noosa River Fish
       Habitat Area to the dredge channel; beach replenishment and sand plug design; and the
       management of dredge plumes and water quality.

   PO7 – Development does not increase the risk of mortality, disease or injury, or compromise the
   health, productivity, marketability or suitability for human consumption of fisheries resources, having
   regard to (but not limited to):
   a) biotic and abiotic conditions, such as water and sediment quality
   b) substances that are toxic to plants or toxic to or cumulative within fish
   c) design of structures
   d) impacts on reproductive success
   e) effect on fish energy reserves
   f) whether fish may be physically damaged, killed, trapped or stranded
   g) fish passage and access to habitats generally, and
   h) the impacts of pest fish and other relevant pest species.

  Given the proximity of the proposed dredge extraction area to a declared FHA, management ‘A’ area,
  information must be provided detailing how the proposed dredge and beach nourishment operations
  will be managed to avoid impacts in relation to items 1, 2, 4 and 6 in particular (ties in with PO’s 5, 6 &
  9).

   PO9 – If acid sulfate soils are present within the proposed dredge footprint provide evidence that
   demonstrates they will be managed according to current best practice. If necessary, discuss soil
   transfer and treatment locations.

   PO10 and PO11 – The proposed works will modify tidal and freshwater inundation patterns and the
   natural processes of accretion and erosion. To meet these PO’s it will be necessary to provide a
   performance solution that demonstrates the proposed works are:
    justifiable in terms of project outcomes
    the least impact option with respect to fish habitats
    are designed to minimise construction and future impacts on marine plant and fish habitats, and
    include a post-works monitoring plan that provides for marine plants in the vicinity of the works
    demonstrate that the proposed sand extraction and beach nourishment will not result in the
       transfer of severe erosive conditions to a new part of the estuary, and
    demonstrate that the proposed design is sustainable i.e. will result in the least frequent
       maintenance requirements of all considered options.

   In accordance with PO12 the proposed works will need to be designed, sited and constructed to
   ensure its long-term use and operability will not result in on-going (or new) adverse impacts or
   additional development including dredging to maintain access.

   Dredging and beach nourishment works should not cause or require further works to be conducted
   that will have adverse ongoing or additional impacts on marine plants. An application is required to
   demonstrate that the proposed works have considered and avoided / mitigated ongoing impacts to
   marine plants and fish habitat post construction, e.g. Via ongoing maintenance to ensure works
   achieve the required need. A post-works monitoring plan with an alert/action commitment should be
   discussed here.




State Assessment and Referral Agency                                                             Page 8 of 10

Page 9

                                                                                               2008-18430 SPL



    PO13, PO14 and PO15 – The works have the potential to affect the community accessing fisheries
    resources. To meet these PO’s, provide evidence that demonstrates that safe access to fisheries
    resources will be maintained for the duration of the works.

    PO17 – An application is required to provide evidence that demonstrates the dog beach is
    undergoing significant erosion. Further response to this PO should discuss the value of the beach to
    the community, the loss of utility, infrastructure and any safety issues arising from the proximity of
    motorised vessels to beachgoers.

    PO18 – Provide evidence that demonstrates the proposed beach replenishment works are on a high
    energy sandy sediment shoreline and the biological communities are adapted to mobile sediments.

    PO20 – Show that the proposed works preclude the need for other erosion control activities or works.
    See also PO1, PO7 and PO12.

    PO21 – Discuss the design of the proposed works and the duration of the replenishment cycle, see
    PO12.

    PO23 – The works constitute capital dredging as the works will result in a new boat channel. Provide
    a discussion detailing why the current access to the river bar or public infrastructure is not suitable.

    PO25 – To meet this PO show that the placement of sand will avoid adverse impacts on marine
    plants.

    PO26 - PO28 – If temporary works are needed, it is necessary to show that any such works:
     will be in place for a specified period and as short a time as possible,
     will be completely removed once they are no longer required, and
     the area impacted by temporary works will be restored to at least pre-works condition.

    Matters of state environmental significance (MSES) – PO31. Marine plants are a MSES under the
    Environment Offsets Act 2014. All applications impacting MSES must comply with PO31, which
    outlines the ‘avoid, minimise (mitigate), offset’ framework.

    This framework requires in the first instance that impacts to marine plants are avoided. Where
    avoidance cannot be achieved, it must be demonstrated that impacts have been carefully managed
    and minimised. Notwithstanding any measures to avoid or mitigate impacts to marine plants, the
    works may still result in a SRI, in which case an offset will be required. Offsets will not be considered
    until it has been demonstrated that all reasonable measures to firstly avoid and/or mitigate impacts to
    marine plants have been taken. Any rehabilitation of marine plants on site may help to reduce the
    scale of the SRI. Options to mitigate the SRI to marine plants must be pursued before an offset can
    be considered. In accordance with the Significant Residual Impact Guideline, removal, destruction or
    damage to marine plants may result in a Significant Residual Impact (SRI) if the marine plants will not
    return to their pre-disturbed extent and condition within 5 years of the impact (this includes impacts to
    marine plants that are permanent and those that may be temporary and meet this criterion (see
    Section 3.9).

Maritime Safety
17. The works will require a Marine Execution Plan and Vessel Traffic Management Plan to ensure
    the safety of mariners during the period of works. This should outline what vessels are being
    used, mooring arrangement, periods of work and so on.

    Repair or replace of any navigational aid that are damaged due to the construction, operation or
    maintenance of the approved development will be required. Any replacement or repair of aids to
    navigation must be carried out at no cost to the Department of Transport and Main Roads and to the
    satisfaction of the Harbour Master.

    The dredging operations are to be conducted in a manner that ensures a suitable navigation channel
    is open to vessel traffic at all time.



 State Assessment and Referral Agency                                                            Page 9 of 10

Page 10

                                                                                               2008-18430 SPL



    All navigation lights, buoys, marks or signs associated with the development must be supplied,
    installed and maintained in accordance with The Department of Transport and Main Roads through
    Maritime Safety Queensland ’s requirements.

    Any ships, plant or equipment that deploy anchors in open waters, and in and near shipping channels
    must have the anchors marked with yellow buoys and fitted with FI lights.

    All floating plant, equipment and pipelines shall be appropriately lit and/or marked to the satisfaction
    of the Harbour Master. Any anchors deployed to be marked with yellow buoys and fitted with FI
    Yellow lights.

Owner’s consent
18. An application for a development permit for MCU on premises below high-water mark and outside a
    canal under the Planning Act 2016 will require owner’s consent from the Department of Natural
    Resource, Mines and Energy (DNRME) to lodge a properly made application. Find out more
    information including how to apply here: https://www.qld.gov.au/environment/land/state/owner-
    consent.

19. Owner’s consent cannot be granted until the appropriate tenure or interest in state land that supports
    the proposed development is secured by the applicant under the Land Act 1994. More information is
    available at https://www.qld.gov.au/environment/land/state. Please contact the State Land Asset
    Management Team Senior Land Officer Matthew Halls on [email protected] or Ph.
    (07) 5352 4209 to discuss options and to begin proceedings under the Land Act 1994.

This pre-lodgement advice is valid for a period of 9 months from the date on this letter. This pre-
lodgement advice does not constitute an approval or an endorsement that SARA supports the
development proposal. Additional information may be required to allow SARA to properly assess the
development proposal when a formal application has been lodged.

For further information please contact Danika Cowie, Principal Planning Officer, on (07) 5352 9776 or via
email [email protected] who will be pleased to assist.

Yours sincerely




Garth Nolan
Manager (Planning)




 State Assessment and Referral Agency                                                           Page 10 of 10

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.