Appendix A_2008-18430 SPL - Pre-lodgement advice (1)
2008-18430 SPL
material from the Noosa River (unallocated state land), beach
nourishment and installation of two 'sand plugs' to divert flows into the
central channel at the river mouth. Seeking advice about the relevant
State triggers and application requirements.
Details of proposal
Development type: Material change of use AND Operational work
Development description: Environmentally relevant activity – 16(1)(b) and Tidal works involving
beach nourishment
Supporting information
Drawing/report title Prepared by Date Reference no. Version/issue
Noosa Spit Shoreline BMT 31/10/2019 R.B23636.001. 2
Erosion Management Plan 02.SEMP_final
.docx
General Arrangement BMT 02/09/2020 A10342-01- B
Concept Plan 01A
Acid Sulfate Soils and Coffey Geotechnics 17/03/2011 GEOTKPAR01 2
Dredging Assessment Pty Ltd 783AA/A
SARA has carried out a review of the information provided and the impacts of the proposal. The following
advice outlines the matters of interest to the department and matters that should be addressed if you
lodge your development application with the department as the assessment manager.
SARA jurisdiction and fees
1. Based on the information provided, a future development application will require assessment by the
Chief Executive of the Planning Act 2016 (Planning Act), through SARA, under the following
provisions of the Planning Regulation 2017 (Planning Regulation):
Schedule 10, Part 5, Division 3, Table 1 – Environmentally relevant activities (Schedule 8, table
4, Item 1). The applicable fee to be paid in accordance with Schedule 10, Part 5, Division 3,
Table 1, Item 5(b)(i).
Schedule 10, Part 6, Division 3, Subdivision 2, Table 1 – Operational work involving marine
plants. The applicable referral fee to be paid in accordance with Schedule 10, Part 6, Division 3,
Subdivision 2, Table 1, Item 5.
Schedule 10, Part 17, Division 3, Table 1 – Tidal works or work in a coastal management
district. The applicable referral fee to be paid in accordance with Schedule 10, Part 17, Division
3, Table 1, Item 8(a)(i).
Schedule 10, Part 17, Division 3, Table 2 – Tidal works or work in a coastal management
district. The applicable referral fee to be paid in accordance with Schedule 10, Part 17, Division
3, Table 2, Item 8(c).
A formal development application should demonstrate compliance with the performance outcomes
(PO) and acceptable outcomes (AO) of the relevant modules of the State Development Assessment
Provisions (SDAP). SARA recommends the following be submitted with the application at formal
lodgement:
An assessment against the latest version of SDAP:
o State code 7: Maritime safety (State code 7)
o State code 8: Coastal development and tidal works (State code 8)
o State code 11: Removal, destruction or damage of marine plants (State code 11), and
State Assessment and Referral Agency Page 2 of 10