$s WJ RV EYO rR . - Director Brian Naismith

Bach Applied Scierice
(Surveying)
Consulting Cadastral
Surveyor

16" September 2026
Our Ref: 3365
Your Ref: OPW26/0033

Danie! Epps

Senicr Development Engineer
Devalopment Assessment
Development & Regulation
Noosa Regional Council

FO Box 141

TEWANTIN QLD 4665

Dear Sir,

RE: Operational Works - OPW26/0033
Lot 496 on MCH591
30 Pottery Street, Pomona
Applicant: Surveyor Pity Ltd

As applicant and on behalf of the landowner/s, we suspended the applicant's appeal
period in accordance with Section 75(2) of the Planning Act 2015 on 31* August by
emailing a letter to Council.

We desire Council's further consideration in assessing the conditions of approval
imposed on the above mentioned.

We hereby make change representations to Council seeking a negotiated decision
notice.

Surveyor Pty Ltd | ABN 97625813998
30 Pottery Stree., Pomona Q 4568
M 0477 925 871 ninaismith11@amail, 307

 
   

Log in to download the original (3365 change representations seeking negotiated decision notice Op Works issue_signed.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 6 pages

Page 2

$ W RVEYO R Director Brian Naisimith

Bach Applied
(Surveying)
Consulting Cadastral
Surveyor

  

Submit a Construction Management Plan to Council prior te the pre-start meeting. The
Consiruction Management Plan must specifically address the following:

a. traffic management during all aspects of the construct phase including:

i. a Traffic Management Plan in accordance with Manual of
Uniform Traffic Control Devices (MUTCD) detailing ail
temporary signage and traffic control measures prior io
construction;

ii, maintenance of safe vehicle and pedestrian access across
the frontage of the site both during claily construction and
after daily construction has ceased;

iil, proposed fencing to the site during the construction phase of
the development;

iv. adequate parking arrangements for construction workers
and deliveries; and

¥. no queuing of trucks is permittec! on residential streets;

b. maintenance and protection of water quality and existing drainage lines
through the construction site through the implementation of appropriate
erosion and sediment contro! measures;

c. works programme identifying key components of the works and their
respective durations;

d. establishment of a communication protocol with the general public,
adjoining awners, emergency services and local businesses to acivise of
agreec' construction times, impacts on traffic and services and other
relevant issues;

e. include a post out to the local residents and businesses advising of the
proposed development, the expected time frames and the site contact
details,

f. include signage in prominent iocations on the boundaries of the site
advising of the proposed development, the expected time frames and the
site contact details;

g. identification of complaint management procedures including:

i. confact details for the on-site manager; and
ji. dispute resolution procedures.

h. details on the location of external fill/dump sites/sources, the haulage
route, type of vehicle to be utilised during filling operations and frequency
of usage.

Surveyor Pty Ltd | ABN 97625813998
30 Pottery $i Pomona Q 4568

M 0477 925 871 | E: briannaismith11@qmail. se"

 
 
  

 

Page 3

 

$s W RV EYO R Director Brian Naismith

Bach Applied Science
(Surveying)
Consulting Cadastral
Surveyor

Construction activities cn this site will occur in distinct stages.

®
©

A. Initially, clearing is required, itself in three stages.
i. Groundcover and mid storey
ii. Non habitat trees
iii, Habitat trees
B. Buik earthworks
C. Civil works — external and internal, etc.

We suggest the CMP submission should be staged accordingly, with matters
addressing the upcoming works and controls in place to enable the safe completion of
those soon to be commenced works.

Significant and slow work is necessary in clearing the site ir: the manner conditioned in
the approval. For example, Condition 24 “Groundcover anc! midstorey will be cleared
utilising a slasher with a mulching head attachment or similar’.

We deem it is premature to require a CMP addressing civil works before clearing of the
development site is near complete. Requiring such prior to a re-start meeting is an
unnecessary time arid cast burden, making the significant clearing work very difficult to
commence.

Furthermore, tree ard vegetation clearing will be mostly internal, apart from the road
reserve south of the proposed new road. Pottery Street is an Access and Local Road
under Council's road hierarchy general standards. Traffic is minimal south of Red
Street, providing access to a total of 5 properties. Traffic management controls will be
considerate of the road usage. Pedestrians are unable to use the existing western road
verge for access due to Council’s vegetation and trees. The eastern side is generally
clear and more favourable for pedestrians.

Surveyor Pty Ltd | ABN 97625813998
30 Pottery Stree", Pomona Q 4568
M 0477 925 871] E

 
 

Page 4

Ss W RVEYO R Director Brian Naismith

Bach Applied Science
(Surveying)
Consulting Cadastral
Surveyor

Preferred Condition 10 - Construction Management Plan (CMP)

Submit an initial Construction Management Plan to Council prior to the pre-start
meeting. The Construction Management Pian must specifically address the following:

a.

traffic management during vegetation clearing stages of the consiruction
phase inciuding:
i. adequate road signage and traffic control measures.
i. maintenance of safe vehicle and pedestrian access across
the frontage of the site;
ii, proposed fencing to the site during the clearing phase of the
development;
iv. adequate parking arrangements for construction workers,
residents and deliveries; and
¥.. NO queuing of tricks is permittec! on residential streets;
maintenarice and protection of water quality and existing drainage lines
through the construction site through the implementation of appropriate
erosion and sediment control measures;
works programme identifying key components of the clearing works and
their respective durations;
establishment of a communication protocol with adjoining owners and
local residents affected by tie clearing works, to advise of agreed! clearing
times, impacts on access arc services and other relevant issues;
include @ post out to the neighbouring and nearby residents advising of
the proposed development, the expected clearing time frames and the site
contact details;
include signage in a prominent location at the front of the site advising of
the proposed development approval number and the site contact details;

We request Council amend the decision notice conditions to allow preparation and
submission of the CMP in stages reflecting upcoming works. ie; introduce a new
condition requiring subrnission of a later CMIP prior to bulk earthworks and civil works
commencement.

Surveyor Pty Lic | ABN 97625813998
30 Pottery St Pomona Q 4568
M 0477 925 871 | E: naismith4 1@amail. sen

 

 

Page 5

 

SU RVEYOR Director Brian Naismith

Bach Applied Sciarice
(Surveying)
Consulting Cadastral
Surveyor

 

Current Condition 17 ~ Removal of existing trees and vegetation

Approved vegetation removal, felling and flopping must:

a) Be undertaken in a manner that avoids damaging surrounding vegetation and
habitat to be retained.

b) Retain old growth tree hollows and suitably relocate and distribute for nesting
fauna.

c) Mulch all other wood and leaf material (without root balls, soil or debris and
minimising weed seeds) for re-usable mulch.

d) Have mulch for re-use in landscape ar rehabilitation stockpiled and agec! for a
minimum of three months.

e) Have mulch stackpiles no larger thar: 1000m3, 2.5m in height and with 10m
separation between piles.

Standing timber to be cleared on the subject site includes trees with trunks varying in
diameter from <150mm to a metre or more. As condition 17 is currently worded, felled
logs will need to be rnuiched. We deem the condition needs amendment to allow
usable logs to be milled. thus making best use of the felled timber.

Surveyor Pty Ltd | ABN 97625813998
30 Pottery & Pomona Q 4568

M 0477 925 871 inaismitht1@amail. sen

  

Page 6

§ Wy RVEYOR Director Brian Naismith

Bach Applied Science
(Surveying)
Consulting Cadastral
Surveyor

Preferred Condition 17 ~ Removal of existing trees and vegetation

Approved vegetation removal, felling and fopping must:

a)
b)

Be undertaken in a manner that avoids damaging surrounding vegetation
and habitat to be retained.

Retain old growth tree hollows and suitably relocate and distribute for
nesting fauna.

Stockpile timber logs for transportation and/or milling.

Mulch ail ether wood and leaf material (without roct balls, soil or debris
and minimising weed seec's) for re-usable mutch.

Have mutch for re-use in landscape or rehabilitation stockpiled and aged
for a minimum of three months.

Have mulch stockpiles no larger than 1000m3, 2.5m in height and with
10m separation between piles.

After under scrubbing of each area is complete, non-habitat trees (i.e. trees other than
thase identified as habitat trees) will be cleared and stockpiled for mulching. Clearing of
non-habitat trees wil! only occur where their removal will not impact on identified habitat
trees (e.g. canopies do not interconnect with habitat trees).

Stancling timber to be cleared on the subject site includes trees with trunks varying in
diameter from <150rnm to a metre or more. As condition 17 is currently worded, felled
logs will need to be mulched. We deem the condition needs amendment to allow
usable logs to be milled, thus making best use of the felled tirmoer.

Surveyor Pty Ltd | ABN 97625813998
30 Pottery Stree, Pomona Q 4568
M 0477 925 871 annaismith1 1@amail 2o-n

  
 

Page 7

Su RVEYOR Director Brian Naismith

Bach Applied Sciarice
(Surveying)
Consulting Cadastral
Surveyor

Preferred Condition 25 -- Clearing non-habitat trees

After under scrubbing of each area is cerriciete, non-habitat trees (i.e. trees other than
those identified as habitat trees) will be cleared and stockpiled for transportation and/or
milling or mulching. Clearing of non-habitat trees will only occur where their removal will
not impact on identified habitat trees (e.g. canopies do not interconnect with habitat
trees),

We request Council's consideration of the preferred conditions stated and acceptance
in full or in part.

Should you have any queries or require any additional information, please do nct hesitate
to contact me as applicant and consultant for the owner.

Yours faithfully,
B. F. NAISMITH

Cadastral Surveyor / Director

Surveyor Pty L
30 Pottery &
M 0477 925 871 |

 
   

a | ABN 97625813993
Pomona Q 4568
inaismitht [email protected]

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.