3365 change representations seeking negotiated decision notice Op Works issue_signed
$s WJ RV EYO rR . - Director Brian Naismith Bach Applied Scierice (Surveying) Consulting Cadastral Surveyor 16" September 2026 Our Ref: 3365 Your Ref: OPW26/0033 Danie! Epps Senicr Development Engineer Devalopment Assessment Development & Regulation Noosa Regional Council FO Box 141 TEWANTIN QLD 4665 Dear Sir, RE: Operational Works - OPW26/0033 Lot 496 on MCH591 30 Pottery Street, Pomona Applicant: Surveyor Pity Ltd As applicant and on behalf of the landowner/s, we suspended the applicant's appeal period in accordance with Section 75(2) of the Planning Act 2015 on 31* August by emailing a letter to Council. We desire Council's further consideration in assessing the conditions of approval imposed on the above mentioned. We hereby make change representations to Council seeking a negotiated decision notice. Surveyor Pty Ltd | ABN 97625813998 30 Pottery Stree., Pomona Q 4568 M 0477 925 871 ninaismith11@amail, 307
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 6 pages
Page 2
$ W RVEYO R Director Brian Naisimith Bach Applied (Surveying) Consulting Cadastral Surveyor Submit a Construction Management Plan to Council prior te the pre-start meeting. The Consiruction Management Plan must specifically address the following: a. traffic management during all aspects of the construct phase including: i. a Traffic Management Plan in accordance with Manual of Uniform Traffic Control Devices (MUTCD) detailing ail temporary signage and traffic control measures prior io construction; ii, maintenance of safe vehicle and pedestrian access across the frontage of the site both during claily construction and after daily construction has ceased; iil, proposed fencing to the site during the construction phase of the development; iv. adequate parking arrangements for construction workers and deliveries; and ¥. no queuing of trucks is permittec! on residential streets; b. maintenance and protection of water quality and existing drainage lines through the construction site through the implementation of appropriate erosion and sediment contro! measures; c. works programme identifying key components of the works and their respective durations; d. establishment of a communication protocol with the general public, adjoining awners, emergency services and local businesses to acivise of agreec' construction times, impacts on traffic and services and other relevant issues; e. include a post out to the local residents and businesses advising of the proposed development, the expected time frames and the site contact details, f. include signage in prominent iocations on the boundaries of the site advising of the proposed development, the expected time frames and the site contact details; g. identification of complaint management procedures including: i. confact details for the on-site manager; and ji. dispute resolution procedures. h. details on the location of external fill/dump sites/sources, the haulage route, type of vehicle to be utilised during filling operations and frequency of usage. Surveyor Pty Ltd | ABN 97625813998 30 Pottery $i Pomona Q 4568 M 0477 925 871 | E: briannaismith11@qmail. se"
Page 3
$s W RV EYO R Director Brian Naismith Bach Applied Science (Surveying) Consulting Cadastral Surveyor Construction activities cn this site will occur in distinct stages. ® © A. Initially, clearing is required, itself in three stages. i. Groundcover and mid storey ii. Non habitat trees iii, Habitat trees B. Buik earthworks C. Civil works — external and internal, etc. We suggest the CMP submission should be staged accordingly, with matters addressing the upcoming works and controls in place to enable the safe completion of those soon to be commenced works. Significant and slow work is necessary in clearing the site ir: the manner conditioned in the approval. For example, Condition 24 “Groundcover anc! midstorey will be cleared utilising a slasher with a mulching head attachment or similar’. We deem it is premature to require a CMP addressing civil works before clearing of the development site is near complete. Requiring such prior to a re-start meeting is an unnecessary time arid cast burden, making the significant clearing work very difficult to commence. Furthermore, tree ard vegetation clearing will be mostly internal, apart from the road reserve south of the proposed new road. Pottery Street is an Access and Local Road under Council's road hierarchy general standards. Traffic is minimal south of Red Street, providing access to a total of 5 properties. Traffic management controls will be considerate of the road usage. Pedestrians are unable to use the existing western road verge for access due to Council’s vegetation and trees. The eastern side is generally clear and more favourable for pedestrians. Surveyor Pty Ltd | ABN 97625813998 30 Pottery Stree", Pomona Q 4568 M 0477 925 871] E
Page 4
Ss W RVEYO R Director Brian Naismith Bach Applied Science (Surveying) Consulting Cadastral Surveyor Preferred Condition 10 - Construction Management Plan (CMP) Submit an initial Construction Management Plan to Council prior to the pre-start meeting. The Construction Management Pian must specifically address the following: a. traffic management during vegetation clearing stages of the consiruction phase inciuding: i. adequate road signage and traffic control measures. i. maintenance of safe vehicle and pedestrian access across the frontage of the site; ii, proposed fencing to the site during the clearing phase of the development; iv. adequate parking arrangements for construction workers, residents and deliveries; and ¥.. NO queuing of tricks is permittec! on residential streets; maintenarice and protection of water quality and existing drainage lines through the construction site through the implementation of appropriate erosion and sediment control measures; works programme identifying key components of the clearing works and their respective durations; establishment of a communication protocol with adjoining owners and local residents affected by tie clearing works, to advise of agreed! clearing times, impacts on access arc services and other relevant issues; include @ post out to the neighbouring and nearby residents advising of the proposed development, the expected clearing time frames and the site contact details; include signage in a prominent location at the front of the site advising of the proposed development approval number and the site contact details; We request Council amend the decision notice conditions to allow preparation and submission of the CMP in stages reflecting upcoming works. ie; introduce a new condition requiring subrnission of a later CMIP prior to bulk earthworks and civil works commencement. Surveyor Pty Lic | ABN 97625813998 30 Pottery St Pomona Q 4568 M 0477 925 871 | E: naismith4 1@amail. sen
Page 5
SU RVEYOR Director Brian Naismith Bach Applied Sciarice (Surveying) Consulting Cadastral Surveyor Current Condition 17 ~ Removal of existing trees and vegetation Approved vegetation removal, felling and flopping must: a) Be undertaken in a manner that avoids damaging surrounding vegetation and habitat to be retained. b) Retain old growth tree hollows and suitably relocate and distribute for nesting fauna. c) Mulch all other wood and leaf material (without root balls, soil or debris and minimising weed seeds) for re-usable mulch. d) Have mulch for re-use in landscape ar rehabilitation stockpiled and agec! for a minimum of three months. e) Have mulch stackpiles no larger thar: 1000m3, 2.5m in height and with 10m separation between piles. Standing timber to be cleared on the subject site includes trees with trunks varying in diameter from <150mm to a metre or more. As condition 17 is currently worded, felled logs will need to be rnuiched. We deem the condition needs amendment to allow usable logs to be milled. thus making best use of the felled timber. Surveyor Pty Ltd | ABN 97625813998 30 Pottery & Pomona Q 4568 M 0477 925 871 inaismitht1@amail. sen
Page 6
§ Wy RVEYOR Director Brian Naismith Bach Applied Science (Surveying) Consulting Cadastral Surveyor Preferred Condition 17 ~ Removal of existing trees and vegetation Approved vegetation removal, felling and fopping must: a) b) Be undertaken in a manner that avoids damaging surrounding vegetation and habitat to be retained. Retain old growth tree hollows and suitably relocate and distribute for nesting fauna. Stockpile timber logs for transportation and/or milling. Mulch ail ether wood and leaf material (without roct balls, soil or debris and minimising weed seec's) for re-usable mutch. Have mutch for re-use in landscape or rehabilitation stockpiled and aged for a minimum of three months. Have mulch stockpiles no larger than 1000m3, 2.5m in height and with 10m separation between piles. After under scrubbing of each area is complete, non-habitat trees (i.e. trees other than thase identified as habitat trees) will be cleared and stockpiled for mulching. Clearing of non-habitat trees wil! only occur where their removal will not impact on identified habitat trees (e.g. canopies do not interconnect with habitat trees). Stancling timber to be cleared on the subject site includes trees with trunks varying in diameter from <150rnm to a metre or more. As condition 17 is currently worded, felled logs will need to be mulched. We deem the condition needs amendment to allow usable logs to be milled, thus making best use of the felled tirmoer. Surveyor Pty Ltd | ABN 97625813998 30 Pottery Stree, Pomona Q 4568 M 0477 925 871 annaismith1 1@amail 2o-n
Page 7
Su RVEYOR Director Brian Naismith Bach Applied Sciarice (Surveying) Consulting Cadastral Surveyor Preferred Condition 25 -- Clearing non-habitat trees After under scrubbing of each area is cerriciete, non-habitat trees (i.e. trees other than those identified as habitat trees) will be cleared and stockpiled for transportation and/or milling or mulching. Clearing of non-habitat trees will only occur where their removal will not impact on identified habitat trees (e.g. canopies do not interconnect with habitat trees), We request Council's consideration of the preferred conditions stated and acceptance in full or in part. Should you have any queries or require any additional information, please do nct hesitate to contact me as applicant and consultant for the owner. Yours faithfully, B. F. NAISMITH Cadastral Surveyor / Director Surveyor Pty L 30 Pottery & M 0477 925 871 | a | ABN 97625813993 Pomona Q 4568 inaismitht [email protected]