Original source · versioned page text
3365 change representations seeking negotiated decision notice Op Works issue_signed
$ W RVEYO R Director Brian Naisimith Bach Applied (Surveying) Consulting Cadastral Surveyor Submit a Construction Management Plan to Council prior te the pre-start meeting. The Consiruction Management Plan must specifically address the following: a. traffic management during all aspects of the construct phase including: i. a Traffic Management Plan in accordance with Manual of Uniform Traffic Control Devices (MUTCD) detailing ail temporary signage and traffic control measures prior io construction; ii, maintenance of safe vehicle and pedestrian access across the frontage of the site both during claily construction and after daily construction has ceased; iil, proposed fencing to the site during the construction phase of the development; iv. adequate parking arrangements for construction workers and deliveries; and ¥. no queuing of trucks is permittec! on residential streets; b. maintenance and protection of water quality and existing drainage lines through the construction site through the implementation of appropriate erosion and sediment contro! measures; c. works programme identifying key components of the works and their respective durations; d. establishment of a communication protocol with the general public, adjoining awners, emergency services and local businesses to acivise of agreec' construction times, impacts on traffic and services and other relevant issues; e. include a post out to the local residents and businesses advising of the proposed development, the expected time frames and the site contact details, f. include signage in prominent iocations on the boundaries of the site advising of the proposed development, the expected time frames and the site contact details; g. identification of complaint management procedures including: i. confact details for the on-site manager; and ji. dispute resolution procedures. h. details on the location of external fill/dump sites/sources, the haulage route, type of vehicle to be utilised during filling operations and frequency of usage. Surveyor Pty Ltd | ABN 97625813998 30 Pottery $i Pomona Q 4568 M 0477 925 871 | E: briannaismith11@qmail. se"
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.