Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Noosa Springs SMP_Rev 4 · OPW17/0612

Attached to the e-mail Operational Works Application OPW17/0612 2 of 2– Precinct E2 Noosa Springs, Noosa Heads (MCU15/0109).

of 48

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (13.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                   ALTUM CONSTRUCTIONS

Precinct F & E2 Noosa Springs Development
        Detailed Stormwater Quality Management Plan




                                         December 2017

                                            M7130_001
Full text of the other 47 pages

Page 2

ALTUM CONSTRUCTIONS
PRECINCT F & E2 NOOSA SPRINGS DEVELOPMENT




DISCLAIMER

This report has been prepared on behalf of and for the exclusive use of ALTUM
CONSTRUCTIONS and is subject to and issued in accordance with ALTUM CONSTRUCTIONS
instruction to Engeny Water Management (Engeny). The content of this report was based on
previous information and studies supplied by ALTUM CONSTRUCTIONS.

Engeny accepts no liability or responsibility whatsoever for it in respect of any use of or reliance
upon this report by any third party.          Copying this report without the permission of ALTUM
CONSTRUCTIONS or Engeny is not permitted.




    M7130_001 Noosa Springs SMP_Rev 4
    \\EGIBRAPP02\management$\Projects\M7000_Miscellaneous     Clients\M7130_001   Noosa    Springs     SMP\07
    Delivery\Docs\Report\Revs\Noosa Springs SMP_Rev 4.docx
    REV     DESCRIPTION     AUTHOR             REVIEWER            APPROVED BY        DATE

    Rev 0   Client Issue    Emily Gordon       David Sexton        David Sexton       19 August 2016

    Rev 1   Client Issue    Emily Gordon       David Sexton        Mark Page          22 August 2016
                                                                   RPEQ 15454

    Rev 2   Client Issue    Emily Gordon       David Sexton        Mark Page          24 August 2017
                                                                   RPEQ 15454

    Rev 4   Client Issue    Gordon Huang       David Sexton        Mark Page          7 December 2017
                                                                   RPEQ 15454

    Signatures




 Job No. M7130_001                                                                                         Page ii
                                                                                          Rev 4 : 7 December 2017

Page 3

ALTUM CONSTRUCTIONS
PRECINCT F & E2 NOOSA SPRINGS DEVELOPMENT




CONTENTS
1.       INTRODUCTION .......................................................................................................1

2.       EXISTING SITE CHARACTERISTICS .......................................................................2
2.1      Location and Zoning ..................................................................................................2
2.2      Topography and Services ..........................................................................................2

3.       PROPOSED DEVELOPMENT ...................................................................................4

4.       STORMWATER QUALITY MANAGEMENT ..............................................................5
4.1      Water Quality Design Objectives ...............................................................................5
4.2      Treatment Sizing and Location ..................................................................................7
4.3      Stormwater Harvesting ..............................................................................................8
4.4      Water Quality Model Results......................................................................................9

5.       TREATMENT TRAIN OPERATION AND MAINTENANCE ......................................13
5.1      Construction & Establishment ..................................................................................13
5.2      Bioretention / Infiltration Swale Maintenance ...........................................................14

6.       CONCLUSION .........................................................................................................16

7.       QUALIFICATIONS ...................................................................................................18

8.       REFERENCES ........................................................................................................19




Appendices

APPENDIX A                 CATCHMENT LAYOUT AND STORMWATER QUALITY DEVICE LAYOUT

APPENDIX B                 DESIGN PLANS



List of Tables
Table 4.1 MUSIC Model Parameters ....................................................................................7
Table 4.2 Adopted Bioretention Basin Parameters ...............................................................8
Table 4.3 Adopted Infiltration Swale Parameters ..................................................................8
Table 4.4 Water Quality Assessment....................................................................................9



 Job No. M7130_001                                                                                                          Page iii
                                                                                                            Rev 4 : 7 December 2017

Page 4

ALTUM CONSTRUCTIONS
PRECINCT F & E2 NOOSA SPRINGS DEVELOPMENT




List of Figures
Figure 2.1 Site Locality Plan .................................................................................................3
Figure 3.1 Proposed Lot Layout – Precinct F........................................................................4
Figure 3.2 Proposed Lot Layout – Precinct E2 .....................................................................4




 Job No. M7130_001                                                                                                           Page iv
                                                                                                             Rev 4 : 7 December 2017

Page 5

ALTUM CONSTRUCTIONS
PRECINCT F & E2 NOOSA SPRINGS DEVELOPMENT




1.        INTRODUCTION
          Engeny Water Management (Engeny) has been commissioned by Altum Constructions to
          prepare a Detailed Stormwater Quality Management Plan (DSQMP) which complies with
          the Noosa Council CDA Decision Notice and associated conditions, issued to Altum
          Construction on 11 March 2016. The report includes information pertaining to items of
          Council’s Information Request dated 20th October 2017 not challenged in the information
          response.

          This DSQMP has been prepared in support of the development applications for the
          proposed 155 multiple dwelling units and associated facilities on Resort Drive, Noosa
          Heads (Application No: 132005.1133.4) – Precinct F, and 44 multiple dwellings – Precinct
          E2. The key objective of the DSQMP includes stormwater quality modelling to develop a
          treatment train which satisfies the requirements of Conditions 46-50 in the Noosa Springs
          Precinct F decision notice.

          The DSQMP has been prepared in accordance with the following:

             Queensland Urban Drainage Manual (2013).

             MUSIC Modelling Guidelines (Water by Design 2010).




Job No. M7130_001                                                                            Page 1
                                                                             Rev 4 : 7 December 2017

Page 6

ALTUM CONSTRUCTIONS
PRECINCT F & E2 NOOSA SPRINGS DEVELOPMENT



2.        EXISTING SITE CHARACTERISTICS

2.1       Location and Zoning

          The subject sites, Lot 7 on SP178340 (Precinct F) and Lot 6 SP178340 (Precinct E2) are
          approximately 5.6 ha and 1.18 ha in area respectively. The site is located on Resort Drive
          (formerly Links and Leslie Drive), Noosa Heads. The proposed development will occupy
          the entire site and will consist of 155 multiple dwelling units and associated facilities,
          including a theatre, restaurant, shops and function rooms (Precinct F) and 44 multiple
          dwelling units (Precinct E2).

2.2       Topography and Services

          The current site topography and existing services can be summarised as follows:

             The site is located to the east of Resort Drive, and is steeply sloping to the west.

             Stormwater runoff within the development will be contained by a series of infiltration
              swales and an underground stormwater network. These systems will discharge from
              the development at four (4) separate locations.

             Stormwater discharged from site will be directed into the existing Noosa Springs
              stormwater network which has connection points located along Resort Drive. The
              ultimate discharge point of the stormwater network is the Noosa Springs Lakes
              System located downstream, specifically into monitoring pond W5.

          The layout of the existing Noosa Springs Lake System and discharge points are identified
          in Figure 2.1 below. A layout plan depicting the proposed stormwater quality treatment
          train and associated drainage infrastructure is included as Figure 1 in Appendix A.




Job No. M7130_001                                                                                 Page 2
                                                                                  Rev 4 : 7 December 2017

Page 7

ALTUM CONSTRUCTIONS
PRECINCT F & E2 NOOSA SPRINGS DEVELOPMENT



             Noosa Springs Lake System




                                            Development Site




                                            Discharge Point (W5)
                              Lake Weyba

          Figure 2.1 Site Locality Plan




Job No. M7130_001                                            Page 3
                                             Rev 4 : 7 December 2017

Page 8

ALTUM CONSTRUCTIONS
PRECINCT F & E2 NOOSA SPRINGS DEVELOPMENT




3.        PROPOSED DEVELOPMENT
          It is proposed to develop Precinct F - Lot 7 Resort Drive (formerly Links and Leslie Drive),
          Noosa Heads, into 155 Multiple Dwelling Units and associated facilities (incl. Theatre,
          Restaurant, Shops and Functions Rooms. It is also proposed to develop Precinct E2 – Lot
          6 into 44 multiple dwelling units. The proposed developments are shown in Figure 3.1 and
          Figure 3.2, design plans are included in Appendix B.




          Figure 3.1 Proposed Lot Layout – Precinct F




          Figure 3.2 Proposed Lot Layout – Precinct E2

          Stormwater quality treatment devices (Bioretention Basins and Infiltration Swales) are
          proposed to manage water quality treatment for both precincts. These devices are
          essential to meeting the requirements of Condition 49 in the Noosa Springs decision
          Notice for Precinct F and have been adopted to address the conditions for Precinct E2. A
          layout plan depicting the proposed stormwater quality treatment train and associated
          drainage layout is included as in Appendix A.

Job No. M7130_001                                                                              Page 4
                                                                               Rev 4 : 7 December 2017

Page 9

ALTUM CONSTRUCTIONS
PRECINCT F & E2 NOOSA SPRINGS DEVELOPMENT




4.        STORMWATER QUALITY MANAGEMENT

4.1       Water Quality Design Objectives

          A conceptual stormwater quality treatment strategy has been developed in accordance
          with Condition 49 of the Precinct F decision notice (March, 2016) and draft approval
          condition received from council in relation to Precinct E2. Condition 49 identifies four
          possible requirements for demonstrating water quality treatment of runoff from the
          proposed development. The requirements for stormwater quality treatment as outlined in
          condition 49 are summarised below:

          1.   Where stormwater runoff from the site will enter the Noosa Springs Lake System:

               a) “MUSIC Modelling and calculations to demonstrate that concentrations of Total
                  Nitrogen, Total Phosphorus and prescribed water contaminants at risk of occurring
                  in runoff from the developed site will be no more than pre-development
                  concentration, or be of a concentration that is compatible to the water quality
                  needs of the lake system.”

               b) “Monitoring protocol to confirm that any nutrients or prescribed water contaminants
                  at risk of runoff from the development site is not responsible for adverse water
                  quality matters within the Noosa Springs Lake System.”

          2.   Where waters will bypass the Noosa Springs Lake System:

               a) “The design residence times of the Noosa Springs Golf Course lake system are
                  maintained.”

               b) “An 80% reduction in TSS, 60% reduction in Total Phosphorus and 45% reduction
                  in Total Nitrogen prior to discharge of water from the site.”

          The draft stormwater quality condition for Site requires a Stormwater Quality Management
          Plan must be submitted to council for approval. The SQMP must be prepared by a RPEQ
          experienced in water sensitive urban design and include the following information:

          1.   Details demonstrating the type, size and location of measures necessary to achieve
               the water quality pollutant reduction targets required by the State Planning Policy.

          2.   Water quality criteria necessary to be met to ensure the waters entering the receiving
               lake systems will not increase the likelihood of cyanobacteria blooms within lake
               systems.

          3.   Design requirements necessary to be incorporated into the development to ensure
               waters leaving the development meet the necessary water quality criteria.

          4.   Landscaping and fertilisation methods to prevent release of chemicals or fertilisers to
               receiving lake systems.



Job No. M7130_001                                                                               Page 5
                                                                                Rev 4 : 7 December 2017

Page 10

ALTUM CONSTRUCTIONS
PRECINCT F & E2 NOOSA SPRINGS DEVELOPMENT



          5.   Maintenance and monitoring criteria for necessary water quality improvement
               devices.

4.1.1     Proposed Treatment Train

          The proposed treatment train utilises a series of Bioretention Basins and Infiltration
          Swales to treat stormwater runoff as it flows within the proposed developments. All water
          to flow into the bioretention basins will be captured via the under drainage and overflow
          riser pit, this water will be directed into the below ground stormwater network which will
          discharge into the existing Noosa Springs lake system.

          There will be three (3) Infiltration Swales located around the facilities area central to
          Precinct F, these swales will also act as conveyance systems for flows exceeding the
          infiltration rate of the filter media discharged into the piped stormwater drainage network.

          Based on the operation of the proposed arrangement all water entering the piped
          drainage network will trigger the requirements of Part 1a of Condition 49. However all
          runoff lost from the system via infiltration will enter the groundwater table and eventually
          discharge to Lake Weyba in the south. This proportion of stormwater runoff from the
          development technically bypasses the Noosa Springs Lake System and therefore triggers
          the requirements of Part 2b of Condition 49.

          The stormwater quality management approach has ensured the concentration of
          pollutants in runoff discharged from the two sites combined (Precinct F and Precinct E2)
          are lower than the existing concentrations at the discharge location.

          Additionally the Noosa Springs Lake System was originally designed to provide water
          quality treatment for the Precinct F and Precinct E2 developments and therefore the runoff
          discharged to the lake system will undergo further treatment prior to entering the natural
          environment (Lake Weyba).

4.1.2     Climate Data

          Climate data for the catchment was sourced from the Bureau of Meteorology (BOM).
          Rainfall data was obtained from Cooroy Composite (40059) for the 10 years between
          1973 and 1983 at six (6) minute intervals as specified by MUSIC Modelling Guidelines for
          South East Queensland (Water by Design, 2010).

4.1.3     Catchment Properti es

          The catchment area for water quality is based on the proposed development layout. A
          lumped catchment approach was considered appropriate and adopted for the
          assessment. Rainfall-runoff and pollutant export parameters were adopted from the
          recommended values identified in Tables 3.7 and 3.8 of MUSIC Modelling Guidelines for
          Southeast Queensland (Water by Design, 2010). Table 4.1 provides a summary of the
          MUSIC Model parameters adopted with the various land uses throughout the study area.
          Fraction impervious is sourced from the recommended values provided by MUSIC
          Modelling Guidelines for Southeast Queensland (Water by Design, 2010).

Job No. M7130_001                                                                              Page 6
                                                                               Rev 4 : 7 December 2017

Page 11

ALTUM CONSTRUCTIONS
PRECINCT F & E2 NOOSA SPRINGS DEVELOPMENT



          Table 4.1 MUSIC Model Parameters

                    Catchments            MUSIC Land Use       Roof Area (ha)   Road Area (ha)      Ground Area (ha)

                                                              100% Impervious   60% Impervious       20% Impervious

             To Swale 1 (North East)      Urban Residential        0.227              -                      -

                    To Basin 1            Urban Residential        0.021            0.359                 0.391

                    To Swale 2            Urban Residential        0.093            0.129                 0.816

                    To Swale 3            Urban Residential          -              0.054                 0.199

           To Basin 2 (Local Catchment)   Urban Residential        0.061            0.121                 0.128

                    To Basin 3            Urban Residential        0.180            0.248                 0.408

                     Untreated            Urban Residential        0.262            0.554                 1.851


4.1.4     Exfiltration Rat e

          Soil permeability at this site has been assessed using empirical relationships with
          laboratory PSD results. The results of the PSD testing for all three samples from site were
          similar, resulting in a calculated hydraulic conductivity of 2.56 x 10-4 m/s (920 mm/hr). In
          order to account for reductions in hydraulic conductivity associated with sediment and
          organic matter an exfiltration rate of 500 mm/hr has been adopted within the MUSIC
          model.

4.2       Treatment Sizing and Location

          The proposed treatment system consists of three (3) bioretention basins and seven (7)
          infiltration swales.

4.2.1     Bioretenti on Basins

          Three month ARI flows will enter the bioretention systems from either the underground
          drainage network and via overland flow. Once the extended detention depth is exceeded
          in the basins, stormwater will overtop the overflow riser pit and be discharged to the piped
          drainage network.

          Scour protection and coarse sediment forebay calculations will be undertaken as part of
          the detailed design stage of the application in accordance with the WSUD Technical
          Design Guidelines for South East Queensland.

          Bioretention basin parameters have been adopted using the WSUD Technical Design
          Guidelines for South East Queensland and the Water by Design MUSIC Modelling
          Guidelines for Southeast Queensland, with the exception of the exfiltration rate applied to


Job No. M7130_001                                                                                           Page 7
                                                                                            Rev 4 : 7 December 2017

Page 12

ALTUM CONSTRUCTIONS
PRECINCT F & E2 NOOSA SPRINGS DEVELOPMENT



          each device. Parameters used for the proposed bioretention basins are provided in Table
          4.2.

          Table 4.2 Adopted Bioretention Basin Parameters

            Bioretention Basin                          Extended Detention
                                      Filter Area                             Filter Media Depth
                    ID                                        Depth

                    Basin 1             100 m2

                    Basin 2             42 m2                 0.2 m                 0.4 m

                    Basin 3             40 m2


4.2.2     Infiltration Sw ales

          Infiltration Swales 1, 2 and 3 will only receive inflows from direct runoff of contributing
          catchments. The flows from Swales 2 and 3 will also discharge into Bio-retention Basin 2.

          Infiltration Swale parameters have been adopted using the WSUD Technical Design
          Guidelines for South East Queensland and the Water by Design MUSIC Modelling
          Guidelines for Southeast Queensland, with the exception of the exfiltration rate applied to
          each device. Parameters used for the proposed infiltration swales are provided in Table
          4.3.

          Table 4.3 Adopted Infiltration Swale Parameters

            Infiltration Swale ID      Length           Base Width      Swale Grade     Swale Depth

              Infiltration Swale 1      120 m                                1%

              Infiltration Swale 2      147 m               1m               0.5%           0.3 m

              Infiltration Swale 3      100 m                                0.5%


4.3       Stormw ater Harvesting

          Condition 46 states that roofwater runoff from any new building should be directed to a
          rainwater storage systems or tank. The proposed design incorporates a 60,000L below
          ground tank that has been sized by the landscaper to intermittently supplement irrigation
          requirements with captured stormwater. In extended dry periods the tank will be topped up
          by a water bore. From a stormwater engineering perspective, it is not necessary for all
          new buildings to direct roofwater to storage tanks. The proposed design still complies with
          the broad intent of condition 46 as the volumes of water caught are substantial and
          captured stormwater will be used for irrigation of landscaped areas.



Job No. M7130_001                                                                                           Page 8
                                                                                            Rev 4 : 7 December 2017

Page 13

ALTUM CONSTRUCTIONS
PRECINCT F & E2 NOOSA SPRINGS DEVELOPMENT



4.4       Water Quality Model Results

4.4.1     Flow s Entering the Noosa Spri ngs Lake System

          The water quality modelling results for water entering the Noosa Springs Lake System
          from the Noosa Springs development are summarised in Table 4.4. These results are
          presented as the average concentration of pollutants in outflows from the system and
          have been compared to the water quality in the existing Noosa Springs Lake system at
          the discharge point (W5). For the purposes of comparison the proposed discharge levels
          have been compared to average results for all documented records between December
          2008 and March 2016, as well as the latest recorded results from March 2016.

          Table 4.4 Water Quality Assessment

                 Location           TSS Concentration            TN Concentration             TP Concentration

              Noosa Springs         Average: 15.4 mg/L          Average: 0.781 mg/L           Average: 0.07 mg/L
               development
                                     Median: 0.00 mg/L           Median: 0.00 mg/L            Median: 0.00 mg/L
             (Precinct F & E2)
                                 90th Percentile: 30.5 mg/L   90th Percentile: 2.26 mg/L   90th Percentile: 0.23 mg/L

              Noosa Springs         Average: 0.41 mg/L           Average: 0.01 mg/L           Average: 0.00 mg/L
               development
                                     Median: 0.00 mg/L           Median: 0.00 mg/L            Median: 0.00 mg/L
            (Precinct E2 ONLY)
                                 90th Percentile: 0.00 mg/L   90th Percentile: 0.00 mg/L   90th Percentile: 0.00 mg/L

              Existing Noosa         Average: 149 mg/L             Average: 4 mg/L            Average: 0.23 mg/L
              Springs Lakes
              (Location W5)           Median: 11 mg/L             Median: 1.5 mg/L             Median: 0.11 mg/L

              (2008 – 2016)       90th Percentile: 491 mg/L    90th Percentile: 3.0 mg/L   90th Percentile: 0.24 mg/L


             Water Quality at
             existing Noosa
             Springs Lakes               1320 mg/L                    30.5 mg/L                    2.16 mg/L
             (Location W5)

               (March 2016)


          The information presented in this table proves the water quality of runoff from the
          proposed Noosa Springs development (Precinct F and E2) will be compatible with the
          existing water quality in the Noosa Springs Lake System at the discharge point (W5). In
          fact, the water quality is significantly better than the existing conditions in the lake.

          It is noted that the median concentrations TSS, TN and TP are below two significant
          figures. This is because pollutant loads are dominated by high pollutant concentration
          events which are unaccounted for by the median values.




Job No. M7130_001                                                                                          Page 9
                                                                                           Rev 4 : 7 December 2017

Page 14

ALTUM CONSTRUCTIONS
PRECINCT F & E2 NOOSA SPRINGS DEVELOPMENT



          It is noted that the 90th percentile TSS concentration for Precinct E2 is less than the
          average also because the TSS pollutant load is dominated by high pollutant concentration
          events. The top 10% of high pollutant events are therefore accounted for in the average
          but not accounted for in the 90th percentile value.

          Based on these results the proposed Noosa Springs development satisfies the
          requirements of Condition 49, Part 1a.

4.4.2     Monitoring Protocol

          Condition 49 Part 1b specifies that a monitoring protocol be developed to confirm that any
          nutrients or prescribed water contaminants at risk of runoff from the development site is
          not responsible for adverse water quality matters within the Noosa Springs Lake System.

          To meet this condition it is proposed that event based monitoring be undertaken on
          discharges from the site prior to entering the Noosa Springs Lake System. Monitoring will
          sample the same constituents currently sampled within the Noosa Springs Lake System
          and be triggered by a storm event greater than 40mm.

          Analysis of Noosaville rainfall data for years with complete rainfall data (2010 to 2016)
          shows that a 40mm trigger will allow for collection of a minimum of 5 samples. On
          average this will trigger collection of 10 events per annum. It will also be proposed that if
          by the end of November, 5 rainfall events have not been collected for that year the trigger
          will be reduced to 20mm to ensure that the minimum of 5 rainfall events are likely to be
          collected.

          The monitoring strategy will be as follows:

             Following Parameters will be monitored

                   Nitrite plus Nitrate as N (NOx)
                   Total Kjeldahl Nitrogen (TKN)
                   Total Nitrogen as N (TKN + NOx)
                   Total Nitrogen as N
                   Total Phosphorus as P
                   Reactive Phosphorus as P (Dissolved)
                   Reactive Phosphorus – Filtered
                   Suspended solids

             Monitoring will be undertaken by a suitably qualified person using NATA accredited
              methods

             Water quality monitoring results must be retained in electronic form by the property
              owner for a minimum of 5 years and will be made available to Noosa Council on
              request

             Samples will be collected at the 3 stormwater manholes immediately upstream of the 3
              legal points of discharge between half an hour and 24 hours following commencement
              of a trigger rainfall event.


Job No. M7130_001                                                                              Page 10
                                                                                Rev 4 : 7 December 2017

Page 15

ALTUM CONSTRUCTIONS
PRECINCT F & E2 NOOSA SPRINGS DEVELOPMENT



             The 3 manholes where monitoring is to occur will pond 100mm of water in the base to
              allow the samples to be collected following a rainfall event.

             Trigger rainfall event is 40 mm based on a minimum of 5 samples per annum

             If by the End of November 5 rainfall events have not been collected the trigger will be
              reduced to 20 to ensure that the minimum of 5 rainfall events are likely to be collected.

             Monitoring will commence following completion of construction and all stabilization
              works within the catchment that reports to the monitoring location.

             Monitoring will be undertaken for a minimum of 2 year period. Following the 2 year
              period if it is deemed that the development is meeting water quality requirements
              monitoring will cease.

4.4.3     Flow s Bypassi ng the Noosa Springs Lake Syst em

          All stormwater infiltrating the groundwater table and therefore bypassing the Noosa
          Springs Lake System will be treated via the following means, prior to interaction with the
          water table:

             Contact with vegetation in the infiltration swales prior to infiltration.

             Contact with filter media in the base of the infiltration swales.

             Contact with the sandy subsurface profile between the base of the filter media and the
              surface of underlying bedrock.

          The groundwater table is approximately 5 to 6 m below ground level within the vicinity of
          the proposed development; this provides additional filtration potential for water infiltrating
          the groundwater table. Coupled with the dense planting of the infiltration swales, there is
          significant potential for water quality treatment for flows entering the groundwater system.
          Consideration should also be given to the distance flows will travel within the subsurface
          profile (Approx. 500m), before they will interact with the water quality in Lake Weyba.

          We believe the development of the Noosa Springs site and the proposed stormwater plan
          will not have a material impact on residence times within the existing Noosa Springs Lake
          System. Precinct F and E2 are relatively small catchments when compared to the greater
          catchment for the lakes system, and therefore any changes to these catchments could
          only have marginal impacts to residence times in the full lakes system. Additionally the
          proposed development has endeavoured to maintain the existing hydrology of the site as
          much as possible. As the existing site consists of sandy soil it is reasonable to assume a
          significant proportion of runoff infiltrates across the existing site, therefore bypassing the
          lakes system. The incorporation of infiltration swales will best simulate the existing
          hydrology of the site and offset the increased rate of runoff from impervious surfaces.

          The Noosa Springs Lake system was designed for a developed catchment which includes
          the Site. (Refer to Noosa Springs Master Drainage Plan). The impervious fraction of the


Job No. M7130_001                                                                                   Page 11
                                                                                     Rev 4 : 7 December 2017

Page 16

ALTUM CONSTRUCTIONS
PRECINCT F & E2 NOOSA SPRINGS DEVELOPMENT



          Site is approximately 50% in alignment with the design assumptions in the Noosa Springs
          Master Drainage Plan. Therefore it is not considered that the subject Site will have a
          material impact on residence times. Further information has previously been provided to
          Council by Morgan Consulting Engineers in the form of a stormwater quantity assessment
          letter dated 20/09/2017 (Clause 49 - Part 2a).

          Due to the limitations of the MUSIC modelling software it is not possible to quantify the
          level of treatment achieved for infiltrating runoff and therefore it cannot be determined
          whether the SPP targets have been met (Clause 49 - Part 2b).

          The site discharges to an enclosed stormwater system which discharges to the Noosa
          Springs Lake System as opposed to an open drain or non-tidal waterway. The Noosa
          Springs Golf Course Lake System was originally designed and constructed to cater for the
          Noosa Springs resort flows and therefore considerations for frequent flow objectives (no
          increase in 1 year ARI peak stormwater flows) are not deemed necessary. (Clause 47 -
          Part a).




Job No. M7130_001                                                                           Page 12
                                                                             Rev 4 : 7 December 2017

Page 17

ALTUM CONSTRUCTIONS
PRECINCT F & E2 NOOSA SPRINGS DEVELOPMENT




5.        TREATMENT TRAIN OPER ATION AND MAINTENANCE
          In the context of development sites and associated construction and building works,
          delivering water sensitive urban design (WSUD) devices and establishing vegetation can
          be very challenging. Therefore, WSUD devices require a careful construction and
          establishment approach to ensure the devices establish in accordance with their design
          intent. The followings sections outline a recommended staged construction and
          establishment methodology for bioretention basins and infiltration swales as outlined
          within Healthy Waterways Technical Design Guidelines.

5.1       Construction & Establishment

          The following is a proposed staged construction and establishment method:

5.1.1     Functional Installat ion

          Construction of the functional elements of the basins/swales at the end of civil works
          construction and the installation of temporary protective measures.

          For example, using a temporary arrangement of a suitable geofabric covered with shallow
          topsoil (e.g. 25 mm) and instant turf, in lieu of the final basin planting.

5.1.2     Sediment and Erosi on Control

          The temporary protective measures preserve the functional infrastructure of the basins
          and swales whilst providing temporary erosion and sediment facilities through the building
          phase.

5.1.3     Operational Establi shment

          At completion of the building phase, removal of the temporary protective measures along
          with accumulated sediment and the system planted in accordance with the design planting
          schedule.

          Vegetation establishment will be aided based on the following controls:

          Weed control

          Adopting high planting densities and if necessary, applying a suitable biodegradable
          erosion control matting to the basin batters will help to combat weed invasion and reduce
          labour intensive maintenance requirements. A heavy application of seedless hydro-mulch
          can also provide short term erosion and weed control. No matting or hydro-mulch is to be
          applied to the surface of the bioretention basins or infiltration swales following the
          construction phase, as this will hinder filtration of stormwater through the filter media.




Job No. M7130_001                                                                            Page 13
                                                                              Rev 4 : 7 December 2017

Page 18

ALTUM CONSTRUCTIONS
PRECINCT F & E2 NOOSA SPRINGS DEVELOPMENT



          Watering

          Regular watering of vegetation is essential for successful establishment and healthy
          growth. The frequency of watering to achieve the successful plant establishment is
          dependent upon rainfall, maturity of planting stock and the water holding capacity of the
          soil. The following watering program is generally adequate but should be adjusted to suit
          the site conditions:

             Week 1-2             3 visits/week

             Week 3-6             2 visits/week

             Week 7-12            1 visit/week

          After this initial 3 month period, watering may still be required, particularly during the first
          winter. Watering requirements to sustain healthy vegetation should be determined during
          ongoing maintenance site visits.

5.2       Bioretention / Infiltration Sw ale Maintenance

          Vegetation plays a key role in maintaining the porosity of the filter media of a bioretention
          basin or infiltration swale and a strong healthy growth of vegetation is critical to its
          performance. Therefore the most intensive period of maintenance is during the plant
          establishment period (first two years) when weed removal and replanting may be required.

          Typical maintenance of bioretention basin and infiltration swale elements as outlined
          within Healthy Waterways Technical Design Guidelines will involve:

             Routine inspection of the basin/swale profile to identify any areas of obvious increased
              sediment deposition, scouring from storm flows, rill erosion of the batters from lateral
              inflows, damage to the profile from vehicles and clogging of the filter media (evident by
              a ‘boggy’ filter media surface).

             Routine inspection of the inflows systems, overflow pits and under-drains to identify
              and clean any areas of scour, litter build up and blockages.

             Removal of sediment where it is smothering the vegetation.

             Where a sediment forebay is adopted, removal of accumulated sediment.

             Repairing any damage to the profile resulting from scour, rill erosion or vehicle
              damage by replacement of appropriate fill and revegetation.

             Tilling of the filter media surface, or removal of the surface layer, if there is evidence of
              clogging.

             Regular watering/irrigation of vegetation until plants are established and actively
              growing.


Job No. M7130_001                                                                                 Page 14
                                                                                   Rev 4 : 7 December 2017

Page 19

ALTUM CONSTRUCTIONS
PRECINCT F & E2 NOOSA SPRINGS DEVELOPMENT



             Removal and management of invasive weeds (herbicides should not be used).

             Removal of plants that have died and replacement with plants of equivalent size and
              species as detailed in the plant schedule.

             Pruning to remove dead or diseased vegetation material and to stimulate growth.

             Vegetation pest monitoring and control.

          Maintenance should only occur after a reasonable rain free period when the filter media is
          dry. Inspections are also recommended following large storm events to check for scour
          and other damage. Inspections should occur every 1-6 months depending on the size and
          complexity of the system.

          To ensure the successful establishment and operation of the bioretention basins and
          infiltration swales the following checklists have been developed by Healthy Waterways
          and are available within the Technical Design Guidelines for South East Queensland:

             Design assessment checklist (detailed design).

             Construction inspection checklist (during and post construction).

             Operation and maintenance inspection form.




Job No. M7130_001                                                                                Page 15
                                                                                  Rev 4 : 7 December 2017

Page 20

ALTUM CONSTRUCTIONS
PRECINCT F & E2 NOOSA SPRINGS DEVELOPMENT




6.        CONCLUSION
          The SQMP for the development application for Lot 7 Resort Drive, Noosa Heads
          (132005.1133.4) – Precinct F and Lot 6 Resort Drive - Precinct E2 has been developed to
          achieve the required stormwater management objectives as outlined in condition 49 of the
          decision notice issued by Noosa Council in March 2016. The key objectives of this SQMP
          included:

             Water quality modelling to develop a stormwater quality treatment train to demonstrate
              compliance with condition 49 of the Noosa Springs decision notice.

          Key design outcomes of the stormwater quality management are as follows:

             Flows will enter a series of bioretention basins and infiltration swales located within the
              proposed development. Flows will enter the treatment devices by the underground
              drainage network and overland flow paths.

             Three (3) bioretention basins will be required with a combined filter area of 182 m2.

             Three (3) infiltration swales will be incorporated with a combined filter area of 367 m2.

             For flows entering the Noosa Springs Lake System (Conditions 49 Part 1a), the
              concentration of pollutants in stormwater runoff discharged from the development site
              is less than the existing concentration at the discharge point (W5).

             For flows bypassing the Noosa Springs Lake System (Conditions 49 Part 2b), the
              percentage reduction of pollutants in infiltrated runoff cannot be quantified due to the
              limitations of the MUSIC modelling software. Therefore it is not possible to prove
              compliance with Part 2b of Condition 49.

             There will be no material impact on the residence times of the Noosa Springs Lake
              System as it was designed for a developed (50% impervious) catchment which
              includes the Site (Refer to Noosa Springs Master Drainage Plan).

          The proposed water quality treatment train outlined within this SQMP achieves most of the
          requirements of Condition 49 in the Noosa Springs Decision Notice (Precinct F); however
          as it is stated above it is not possible to prove compliance with Part 2b of the condition, for
          infiltrated flows bypassing the lakes system, due to the limitations of the MUSIC modelling
          software. However there is reasonable evidence to support the conclusion stormwater
          discharged from site via infiltration to below ground aquifers will be sufficiently treated
          prior to interacting with Lake Weyba.

          This stormwater quality management approach satisfies the treatment requirements for
          Precinct F and E2. The proposed strategy will improve the water quality of runoff entering
          the Noosa Springs Lake System to a point where the water quality is better than the
          existing water quality in the lake. Additionally the Noosa Springs Lake System was
          originally designed to provide water quality treatment for the Precinct F and Precinct E2


Job No. M7130_001                                                                                Page 16
                                                                                  Rev 4 : 7 December 2017

Page 21

ALTUM CONSTRUCTIONS
PRECINCT F & E2 NOOSA SPRINGS DEVELOPMENT



          developments and therefore the runoff discharged to the lake system will undergo further
          treatment prior to entering the natural environment (Lake Weyba).

          It is considered this stormwater management approach meets the requirements of
          Condition 49, as much as reasonably possible. Should there be any queries regarding the
          approach please do not hesitate to contact David Sexton on 07 3221 7174.




Job No. M7130_001                                                                          Page 17
                                                                            Rev 4 : 7 December 2017

Page 22

ALTUM CONSTRUCTIONS
PRECINCT F & E2 NOOSA SPRINGS DEVELOPMENT



7.         QUALIFICATIONS
           a.   In preparing this document, including all relevant calculation and modelling, Engeny
                Management Pty Ltd (Engeny) has exercised the degree of skill, care and diligence
                normally exercised by members of the engineering profession and has acted in
                accordance with accepted practices of engineering principles.

           b.   Engeny has used reasonable endeavours to inform itself of the parameters and
                requirements of the project and has taken reasonable steps to ensure that the works
                and document is as accurate and comprehensive as possible given the information
                upon which it has been based including information that may have been provided or
                obtained by any third party or external sources which has not been independently
                verified.

           c.   Engeny reserves the right to review and amend any aspect of the works performed
                including any opinions and recommendations from the works included or referred to in
                the works if:

                (i)   Additional sources of information not presently available (for whatever reason)
                      are provided or become known to Engeny; or

                (ii) Engeny considers it prudent to revise any aspect of the works in light of any
                     information which becomes known to it after the date of submission.

           d.   Engeny does not give any warranty nor accept any liability in relation to the
                completeness or accuracy of the works, which may be inherently reliant upon the
                completeness and accuracy of the input data and the agreed scope of works. All
                limitations of liability shall apply for the benefit of the employees, agents and
                representatives of Engeny to the same extent that they apply for the benefit of
                Engeny.

           e.   This document is for the use of the party to whom it is addressed and for no other
                persons. No responsibility is accepted to any third party for the whole or part of the
                contents of this report.

           f.   If any claim or demand is made by any person against Engeny on the basis of
                detriment sustained or alleged to have been sustained as a result of reliance upon the
                report or information therein, Engeny will rely upon this provision as a defence to any
                such claim or demand.

           g.   This report does not provide legal advice.




     Job No. M7130_001                                                                             Page 18
                                                                                    Rev 4 : 7 December 2017

Page 23

ALTUM CONSTRUCTIONS
PRECINCT F & E2 NOOSA SPRINGS DEVELOPMENT



8.         REFERENCES
1.      Australian Government Bureau of Meteorology (www.bom.gov.au)
2.      Healthy Waterways 2006, WSUD Technical Design Guidelines for Southeast Queensland.
3.      Queensland Department of Natural Resources and Water, “Queensland Urban Drainage
        Design Manual”, 2013;
4.      Queensland Government 2013, “State Planning Policy December 2013”.
5.      Wallace, D 2016, Change to an Existing Approval, Noosa Council, March 2016.
6.      Water by Design 2010, MUSIC Modelling Guidelines for Southeast Queensland – Version 1.




     Job No. M7130_001                                                                       Page 19
                                                                              Rev 4 : 7 December 2017

Page 24

ALTUM CONSTRUCTIONS
PRECINCT F & E2 NOOSA SPRINGS DEVELOPMENT




                                            APPENDIX A
         Catchment Layout and Stormwater Quality
                              Device Layout Plan




  Job No. M7130_001                                           Appendix
                                               Rev 4 : 7 December 2017

Page 25

     

 

Legend

| Site Boundary
Water Quality Catc!

Cadastre

WSUD- Swales

   
 
   
  

Level 7, 500 Queen Street, Brisbane

  

PO Box 10183 Brisbane

yww.engeny.com.aul =

So
ENGENY

WATER MANAGEMENT

   
  
   
  

 

errors
3)
Se 7

 

 

hy

i,
G

 

#ekTUM

 

CONSTRUCTIONS

Scale 1:1,250

Map Projection: Tranverse Mercator
Horizontal Datum: Geocentric Datum of Australia
Vertical Datum: Australia Height Datum
Grid: Map Grid of Australia, Zone 56

40 60 m |Noosa Springs SMP

Water Quality Catchments and Treatment
Device Layout

Ore GY
‘atchment|B3

 
 
 
 
 

   
   
    
  

Job Number: M7130_001

Revision: 0
Drawn: GH
Checked: DS
Date: 4/12/2017

   

 

Page 26

ALTUM CONSTRUCTIONS
PRECINCT F & E2 NOOSA SPRINGS DEVELOPMENT




                                            APPENDIX B
                                            Design Plans




  Job No. M7130_001                                           Appendix
                                               Rev 4 : 7 December 2017

Page 27

PROPOSED RESIDENTIAL DEVELOPME
PRECINCT F - STAGE 1 NOOSA SPRINGS, NOO
                HEADS




                                          P:             (07) 3369 8411
                                          F:             (07) 3369 1893
                                          E : [email protected]
                                          © Morgan Consulting Engineers
                                          This drawing is not to be copied,
                                          retained or used without the
                                          permission of the copyright holder.


                1 GREAT GEORGE STREET
                PADDINGTON Q LD 4 0 6 4

Page 28

                          P:             (07) 3369 8411
                          F:             (07) 3369 1893
                          E : [email protected]
                          © Morgan Consulting Engineers
                          This drawing is not to be copied,
                          retained or used without the
                          permission of the copyright holder.


1 GREAT GEORGE STREET
PADDINGTON Q LD 4 0 6 4

Page 29

                          P:             (07) 3369 8411
                          F:             (07) 3369 1893
                          E : [email protected]
                          © Morgan Consulting Engineers
                          This drawing is not to be copied,
                          retained or used without the
                          permission of the copyright holder.


1 GREAT GEORGE STREET
PADDINGTON Q LD 4 0 6 4

Page 30

                          P:             (07) 3369 8411
                          F:             (07) 3369 1893
                          E : [email protected]
                          © Morgan Consulting Engineers
                          This drawing is not to be copied,
                          retained or used without the
                          permission of the copyright holder.


1 GREAT GEORGE STREET
PADDINGTON Q LD 4 0 6 4

Page 31

                          P:             (07) 3369 8411
                          F:             (07) 3369 1893
                          E : [email protected]
                          © Morgan Consulting Engineers
                          This drawing is not to be copied,
                          retained or used without the
                          permission of the copyright holder.


1 GREAT GEORGE STREET
PADDINGTON Q LD 4 0 6 4

Page 32

                          P:             (07) 3369 8411
                          F:             (07) 3369 1893
                          E : [email protected]
                          © Morgan Consulting Engineers
                          This drawing is not to be copied,
                          retained or used without the
                          permission of the copyright holder.


1 GREAT GEORGE STREET
PADDINGTON Q LD 4 0 6 4

Page 33

                          P:             (07) 3369 8411
                          F:             (07) 3369 1893
                          E : [email protected]
                          © Morgan Consulting Engineers
                          This drawing is not to be copied,
                          retained or used without the
                          permission of the copyright holder.


1 GREAT GEORGE STREET
PADDINGTON Q LD 4 0 6 4

Page 34

                          P:             (07) 3369 8411
                          F:             (07) 3369 1893
                          E : [email protected]
                          © Morgan Consulting Engineers
                          This drawing is not to be copied,
                          retained or used without the
                          permission of the copyright holder.


1 GREAT GEORGE STREET
PADDINGTON Q LD 4 0 6 4

Page 35

                          P:             (07) 3369 8411
                          F:             (07) 3369 1893
                          E : [email protected]
                          © Morgan Consulting Engineers
                          This drawing is not to be copied,
                          retained or used without the
                          permission of the copyright holder.


1 GREAT GEORGE STREET
PADDINGTON Q LD 4 0 6 4

Page 36

                          P:             (07) 3369 8411
                          F:             (07) 3369 1893
                          E : [email protected]
                          © Morgan Consulting Engineers
                          This drawing is not to be copied,
                          retained or used without the
                          permission of the copyright holder.


1 GREAT GEORGE STREET
PADDINGTON Q LD 4 0 6 4

Page 37

                          P:             (07) 3369 8411
                          F:             (07) 3369 1893
                          E : [email protected]
                          © Morgan Consulting Engineers
                          This drawing is not to be copied,
                          retained or used without the
                          permission of the copyright holder.


1 GREAT GEORGE STREET
PADDINGTON Q LD 4 0 6 4

Page 38

                          P:             (07) 3369 8411
                          F:             (07) 3369 1893
                          E : [email protected]
                          © Morgan Consulting Engineers
                          This drawing is not to be copied,
                          retained or used without the
                          permission of the copyright holder.


1 GREAT GEORGE STREET
PADDINGTON Q LD 4 0 6 4

Page 39

                          P:             (07) 3369 8411
                          F:             (07) 3369 1893
                          E : [email protected]
                          © Morgan Consulting Engineers
                          This drawing is not to be copied,
                          retained or used without the
                          permission of the copyright holder.


1 GREAT GEORGE STREET
PADDINGTON Q LD 4 0 6 4

Page 40

                          P:             (07) 3369 8411
                          F:             (07) 3369 1893
                          E : [email protected]
                          © Morgan Consulting Engineers
                          This drawing is not to be copied,
                          retained or used without the
                          permission of the copyright holder.


1 GREAT GEORGE STREET
PADDINGTON Q LD 4 0 6 4

Page 41

                          P:             (07) 3369 8411
                          F:             (07) 3369 1893
                          E : [email protected]
                          © Morgan Consulting Engineers
                          This drawing is not to be copied,
                          retained or used without the
                          permission of the copyright holder.


1 GREAT GEORGE STREET
PADDINGTON Q LD 4 0 6 4

Page 42

                          P:             (07) 3369 8411
                          F:             (07) 3369 1893
                          E : [email protected]
                          © Morgan Consulting Engineers
                          This drawing is not to be copied,
                          retained or used without the
                          permission of the copyright holder.


1 GREAT GEORGE STREET
PADDINGTON Q LD 4 0 6 4

Page 43

                          P:             (07) 3369 8411
                          F:             (07) 3369 1893
                          E : [email protected]
                          © Morgan Consulting Engineers
                          This drawing is not to be copied,
                          retained or used without the
                          permission of the copyright holder.


1 GREAT GEORGE STREET
PADDINGTON Q LD 4 0 6 4

Page 44

                          P:             (07) 3369 8411
                          F:             (07) 3369 1893
                          E : [email protected]
                          © Morgan Consulting Engineers
                          This drawing is not to be copied,
                          retained or used without the
                          permission of the copyright holder.


1 GREAT GEORGE STREET
PADDINGTON Q LD 4 0 6 4

Page 45

                          P:             (07) 3369 8411
                          F:             (07) 3369 1893
                          E : [email protected]
                          © Morgan Consulting Engineers
                          This drawing is not to be copied,
                          retained or used without the
                          permission of the copyright holder.


1 GREAT GEORGE STREET
PADDINGTON Q LD 4 0 6 4

Page 46

                          P:             (07) 3369 8411
                          F:             (07) 3369 1893
                          E : [email protected]
                          © Morgan Consulting Engineers
                          This drawing is not to be copied,
                          retained or used without the
                          permission of the copyright holder.


1 GREAT GEORGE STREET
PADDINGTON Q LD 4 0 6 4

Page 47

                          P:             (07) 3369 8411
                          F:             (07) 3369 1893
                          E : [email protected]
                          © Morgan Consulting Engineers
                          This drawing is not to be copied,
                          retained or used without the
                          permission of the copyright holder.


1 GREAT GEORGE STREET
PADDINGTON Q LD 4 0 6 4

Page 48

                          P:             (07) 3369 8411
                          F:             (07) 3369 1893
                          E : [email protected]
                          © Morgan Consulting Engineers
                          This drawing is not to be copied,
                          retained or used without the
                          permission of the copyright holder.


1 GREAT GEORGE STREET
PADDINGTON Q LD 4 0 6 4

Used in these records

About this file

File size
13.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Noosa Springs SMP_Rev 4.pdf · 13.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.