Council archive · source document
Noosa Springs SMP_Rev 4 · OPW17/0612
Attached to the e-mail Operational Works Application OPW17/0612 2 of 2– Precinct E2 Noosa Springs, Noosa Heads (MCU15/0109).
Very large file (13.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.
ALTUM CONSTRUCTIONS
PRECINCT F & E2 NOOSA SPRINGS DEVELOPMENT
DISCLAIMER
This report has been prepared on behalf of and for the exclusive use of ALTUM
CONSTRUCTIONS and is subject to and issued in accordance with ALTUM CONSTRUCTIONS
instruction to Engeny Water Management (Engeny). The content of this report was based on
previous information and studies supplied by ALTUM CONSTRUCTIONS.
Engeny accepts no liability or responsibility whatsoever for it in respect of any use of or reliance
upon this report by any third party. Copying this report without the permission of ALTUM
CONSTRUCTIONS or Engeny is not permitted.
M7130_001 Noosa Springs SMP_Rev 4
\\EGIBRAPP02\management$\Projects\M7000_Miscellaneous Clients\M7130_001 Noosa Springs SMP\07
Delivery\Docs\Report\Revs\Noosa Springs SMP_Rev 4.docx
REV DESCRIPTION AUTHOR REVIEWER APPROVED BY DATE
Rev 0 Client Issue Emily Gordon David Sexton David Sexton 19 August 2016
Rev 1 Client Issue Emily Gordon David Sexton Mark Page 22 August 2016
RPEQ 15454
Rev 2 Client Issue Emily Gordon David Sexton Mark Page 24 August 2017
RPEQ 15454
Rev 4 Client Issue Gordon Huang David Sexton Mark Page 7 December 2017
RPEQ 15454
Signatures
Job No. M7130_001 Page ii
Rev 4 : 7 December 2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Noosa Springs SMP_Rev 4.pdfRelated documentApplication case desk ↗
About this file
- File size
- 13.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.