ALTUM CONSTRUCTIONS
PRECINCT F & E2 NOOSA SPRINGS DEVELOPMENT
each device. Parameters used for the proposed bioretention basins are provided in Table
4.2.
Table 4.2 Adopted Bioretention Basin Parameters
Bioretention Basin Extended Detention
Filter Area Filter Media Depth
ID Depth
Basin 1 100 m2
Basin 2 42 m2 0.2 m 0.4 m
Basin 3 40 m2
4.2.2 Infiltration Sw ales
Infiltration Swales 1, 2 and 3 will only receive inflows from direct runoff of contributing
catchments. The flows from Swales 2 and 3 will also discharge into Bio-retention Basin 2.
Infiltration Swale parameters have been adopted using the WSUD Technical Design
Guidelines for South East Queensland and the Water by Design MUSIC Modelling
Guidelines for Southeast Queensland, with the exception of the exfiltration rate applied to
each device. Parameters used for the proposed infiltration swales are provided in Table
4.3.
Table 4.3 Adopted Infiltration Swale Parameters
Infiltration Swale ID Length Base Width Swale Grade Swale Depth
Infiltration Swale 1 120 m 1%
Infiltration Swale 2 147 m 1m 0.5% 0.3 m
Infiltration Swale 3 100 m 0.5%
4.3 Stormw ater Harvesting
Condition 46 states that roofwater runoff from any new building should be directed to a
rainwater storage systems or tank. The proposed design incorporates a 60,000L below
ground tank that has been sized by the landscaper to intermittently supplement irrigation
requirements with captured stormwater. In extended dry periods the tank will be topped up
by a water bore. From a stormwater engineering perspective, it is not necessary for all
new buildings to direct roofwater to storage tanks. The proposed design still complies with
the broad intent of condition 46 as the volumes of water caught are substantial and
captured stormwater will be used for irrigation of landscaped areas.
Job No. M7130_001 Page 8
Rev 4 : 7 December 2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Noosa Springs SMP_Rev 4.pdfRelated documentApplication case desk ↗
About this file
- File size
- 13.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.