ALTUM CONSTRUCTIONS
PRECINCT F & E2 NOOSA SPRINGS DEVELOPMENT
Table 4.1 MUSIC Model Parameters
Catchments MUSIC Land Use Roof Area (ha) Road Area (ha) Ground Area (ha)
100% Impervious 60% Impervious 20% Impervious
To Swale 1 (North East) Urban Residential 0.227 - -
To Basin 1 Urban Residential 0.021 0.359 0.391
To Swale 2 Urban Residential 0.093 0.129 0.816
To Swale 3 Urban Residential - 0.054 0.199
To Basin 2 (Local Catchment) Urban Residential 0.061 0.121 0.128
To Basin 3 Urban Residential 0.180 0.248 0.408
Untreated Urban Residential 0.262 0.554 1.851
4.1.4 Exfiltration Rat e
Soil permeability at this site has been assessed using empirical relationships with
laboratory PSD results. The results of the PSD testing for all three samples from site were
similar, resulting in a calculated hydraulic conductivity of 2.56 x 10-4 m/s (920 mm/hr). In
order to account for reductions in hydraulic conductivity associated with sediment and
organic matter an exfiltration rate of 500 mm/hr has been adopted within the MUSIC
model.
4.2 Treatment Sizing and Location
The proposed treatment system consists of three (3) bioretention basins and seven (7)
infiltration swales.
4.2.1 Bioretenti on Basins
Three month ARI flows will enter the bioretention systems from either the underground
drainage network and via overland flow. Once the extended detention depth is exceeded
in the basins, stormwater will overtop the overflow riser pit and be discharged to the piped
drainage network.
Scour protection and coarse sediment forebay calculations will be undertaken as part of
the detailed design stage of the application in accordance with the WSUD Technical
Design Guidelines for South East Queensland.
Bioretention basin parameters have been adopted using the WSUD Technical Design
Guidelines for South East Queensland and the Water by Design MUSIC Modelling
Guidelines for Southeast Queensland, with the exception of the exfiltration rate applied to
Job No. M7130_001 Page 7
Rev 4 : 7 December 2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Noosa Springs SMP_Rev 4.pdfRelated documentApplication case desk ↗
About this file
- File size
- 13.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.