ALTUM CONSTRUCTIONS
PRECINCT F & E2 NOOSA SPRINGS DEVELOPMENT
Site is approximately 50% in alignment with the design assumptions in the Noosa Springs
Master Drainage Plan. Therefore it is not considered that the subject Site will have a
material impact on residence times. Further information has previously been provided to
Council by Morgan Consulting Engineers in the form of a stormwater quantity assessment
letter dated 20/09/2017 (Clause 49 - Part 2a).
Due to the limitations of the MUSIC modelling software it is not possible to quantify the
level of treatment achieved for infiltrating runoff and therefore it cannot be determined
whether the SPP targets have been met (Clause 49 - Part 2b).
The site discharges to an enclosed stormwater system which discharges to the Noosa
Springs Lake System as opposed to an open drain or non-tidal waterway. The Noosa
Springs Golf Course Lake System was originally designed and constructed to cater for the
Noosa Springs resort flows and therefore considerations for frequent flow objectives (no
increase in 1 year ARI peak stormwater flows) are not deemed necessary. (Clause 47 -
Part a).
Job No. M7130_001 Page 12
Rev 4 : 7 December 2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Noosa Springs SMP_Rev 4.pdfRelated documentApplication case desk ↗
About this file
- File size
- 13.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.