ALTUM CONSTRUCTIONS
PRECINCT F & E2 NOOSA SPRINGS DEVELOPMENT
5. TREATMENT TRAIN OPER ATION AND MAINTENANCE
In the context of development sites and associated construction and building works,
delivering water sensitive urban design (WSUD) devices and establishing vegetation can
be very challenging. Therefore, WSUD devices require a careful construction and
establishment approach to ensure the devices establish in accordance with their design
intent. The followings sections outline a recommended staged construction and
establishment methodology for bioretention basins and infiltration swales as outlined
within Healthy Waterways Technical Design Guidelines.
5.1 Construction & Establishment
The following is a proposed staged construction and establishment method:
5.1.1 Functional Installat ion
Construction of the functional elements of the basins/swales at the end of civil works
construction and the installation of temporary protective measures.
For example, using a temporary arrangement of a suitable geofabric covered with shallow
topsoil (e.g. 25 mm) and instant turf, in lieu of the final basin planting.
5.1.2 Sediment and Erosi on Control
The temporary protective measures preserve the functional infrastructure of the basins
and swales whilst providing temporary erosion and sediment facilities through the building
phase.
5.1.3 Operational Establi shment
At completion of the building phase, removal of the temporary protective measures along
with accumulated sediment and the system planted in accordance with the design planting
schedule.
Vegetation establishment will be aided based on the following controls:
Weed control
Adopting high planting densities and if necessary, applying a suitable biodegradable
erosion control matting to the basin batters will help to combat weed invasion and reduce
labour intensive maintenance requirements. A heavy application of seedless hydro-mulch
can also provide short term erosion and weed control. No matting or hydro-mulch is to be
applied to the surface of the bioretention basins or infiltration swales following the
construction phase, as this will hinder filtration of stormwater through the filter media.
Job No. M7130_001 Page 13
Rev 4 : 7 December 2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Noosa Springs SMP_Rev 4.pdfRelated documentApplication case desk ↗
About this file
- File size
- 13.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.