Council archive · source document
Noosa Springs SMP_Rev 4 · OPW17/0612
Attached to the e-mail Operational Works Application OPW17/0612 2 of 2– Precinct E2 Noosa Springs, Noosa Heads (MCU15/0109).
Very large file (13.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.
ALTUM CONSTRUCTIONS
PRECINCT F & E2 NOOSA SPRINGS DEVELOPMENT
Removal and management of invasive weeds (herbicides should not be used).
Removal of plants that have died and replacement with plants of equivalent size and
species as detailed in the plant schedule.
Pruning to remove dead or diseased vegetation material and to stimulate growth.
Vegetation pest monitoring and control.
Maintenance should only occur after a reasonable rain free period when the filter media is
dry. Inspections are also recommended following large storm events to check for scour
and other damage. Inspections should occur every 1-6 months depending on the size and
complexity of the system.
To ensure the successful establishment and operation of the bioretention basins and
infiltration swales the following checklists have been developed by Healthy Waterways
and are available within the Technical Design Guidelines for South East Queensland:
Design assessment checklist (detailed design).
Construction inspection checklist (during and post construction).
Operation and maintenance inspection form.
Job No. M7130_001 Page 15
Rev 4 : 7 December 2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Noosa Springs SMP_Rev 4.pdfRelated documentApplication case desk ↗
About this file
- File size
- 13.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.