ALTUM CONSTRUCTIONS
PRECINCT F & E2 NOOSA SPRINGS DEVELOPMENT
Watering
Regular watering of vegetation is essential for successful establishment and healthy
growth. The frequency of watering to achieve the successful plant establishment is
dependent upon rainfall, maturity of planting stock and the water holding capacity of the
soil. The following watering program is generally adequate but should be adjusted to suit
the site conditions:
Week 1-2 3 visits/week
Week 3-6 2 visits/week
Week 7-12 1 visit/week
After this initial 3 month period, watering may still be required, particularly during the first
winter. Watering requirements to sustain healthy vegetation should be determined during
ongoing maintenance site visits.
5.2 Bioretention / Infiltration Sw ale Maintenance
Vegetation plays a key role in maintaining the porosity of the filter media of a bioretention
basin or infiltration swale and a strong healthy growth of vegetation is critical to its
performance. Therefore the most intensive period of maintenance is during the plant
establishment period (first two years) when weed removal and replanting may be required.
Typical maintenance of bioretention basin and infiltration swale elements as outlined
within Healthy Waterways Technical Design Guidelines will involve:
Routine inspection of the basin/swale profile to identify any areas of obvious increased
sediment deposition, scouring from storm flows, rill erosion of the batters from lateral
inflows, damage to the profile from vehicles and clogging of the filter media (evident by
a ‘boggy’ filter media surface).
Routine inspection of the inflows systems, overflow pits and under-drains to identify
and clean any areas of scour, litter build up and blockages.
Removal of sediment where it is smothering the vegetation.
Where a sediment forebay is adopted, removal of accumulated sediment.
Repairing any damage to the profile resulting from scour, rill erosion or vehicle
damage by replacement of appropriate fill and revegetation.
Tilling of the filter media surface, or removal of the surface layer, if there is evidence of
clogging.
Regular watering/irrigation of vegetation until plants are established and actively
growing.
Job No. M7130_001 Page 14
Rev 4 : 7 December 2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Noosa Springs SMP_Rev 4.pdfRelated documentApplication case desk ↗
About this file
- File size
- 13.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.