Council archive · source document
Noosa Springs SMP_Rev 4 · OPW17/0612
Attached to the e-mail Operational Works Application OPW17/0612 2 of 2– Precinct E2 Noosa Springs, Noosa Heads (MCU15/0109).
Very large file (13.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.
ALTUM CONSTRUCTIONS
PRECINCT F & E2 NOOSA SPRINGS DEVELOPMENT
8. REFERENCES
1. Australian Government Bureau of Meteorology (www.bom.gov.au)
2. Healthy Waterways 2006, WSUD Technical Design Guidelines for Southeast Queensland.
3. Queensland Department of Natural Resources and Water, “Queensland Urban Drainage
Design Manual”, 2013;
4. Queensland Government 2013, “State Planning Policy December 2013”.
5. Wallace, D 2016, Change to an Existing Approval, Noosa Council, March 2016.
6. Water by Design 2010, MUSIC Modelling Guidelines for Southeast Queensland – Version 1.
Job No. M7130_001 Page 19
Rev 4 : 7 December 2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Noosa Springs SMP_Rev 4.pdfRelated documentApplication case desk ↗
About this file
- File size
- 13.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.