Very large file (13.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.
ALTUM CONSTRUCTIONS
PRECINCT F & E2 NOOSA SPRINGS DEVELOPMENT
4. STORMWATER QUALITY MANAGEMENT
4.1 Water Quality Design Objectives
A conceptual stormwater quality treatment strategy has been developed in accordance
with Condition 49 of the Precinct F decision notice (March, 2016) and draft approval
condition received from council in relation to Precinct E2. Condition 49 identifies four
possible requirements for demonstrating water quality treatment of runoff from the
proposed development. The requirements for stormwater quality treatment as outlined in
condition 49 are summarised below:
1. Where stormwater runoff from the site will enter the Noosa Springs Lake System:
a) “MUSIC Modelling and calculations to demonstrate that concentrations of Total
Nitrogen, Total Phosphorus and prescribed water contaminants at risk of occurring
in runoff from the developed site will be no more than pre-development
concentration, or be of a concentration that is compatible to the water quality
needs of the lake system.”
b) “Monitoring protocol to confirm that any nutrients or prescribed water contaminants
at risk of runoff from the development site is not responsible for adverse water
quality matters within the Noosa Springs Lake System.”
2. Where waters will bypass the Noosa Springs Lake System:
a) “The design residence times of the Noosa Springs Golf Course lake system are
maintained.”
b) “An 80% reduction in TSS, 60% reduction in Total Phosphorus and 45% reduction
in Total Nitrogen prior to discharge of water from the site.”
The draft stormwater quality condition for Site requires a Stormwater Quality Management
Plan must be submitted to council for approval. The SQMP must be prepared by a RPEQ
experienced in water sensitive urban design and include the following information:
1. Details demonstrating the type, size and location of measures necessary to achieve
the water quality pollutant reduction targets required by the State Planning Policy.
2. Water quality criteria necessary to be met to ensure the waters entering the receiving
lake systems will not increase the likelihood of cyanobacteria blooms within lake
systems.
3. Design requirements necessary to be incorporated into the development to ensure
waters leaving the development meet the necessary water quality criteria.
4. Landscaping and fertilisation methods to prevent release of chemicals or fertilisers to
receiving lake systems.
Job No. M7130_001 Page 5
Rev 4 : 7 December 2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Noosa Springs SMP_Rev 4.pdfRelated documentApplication case desk ↗
About this file
- File size
- 13.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.