ALTUM CONSTRUCTIONS
PRECINCT F & E2 NOOSA SPRINGS DEVELOPMENT
5. Maintenance and monitoring criteria for necessary water quality improvement
devices.
4.1.1 Proposed Treatment Train
The proposed treatment train utilises a series of Bioretention Basins and Infiltration
Swales to treat stormwater runoff as it flows within the proposed developments. All water
to flow into the bioretention basins will be captured via the under drainage and overflow
riser pit, this water will be directed into the below ground stormwater network which will
discharge into the existing Noosa Springs lake system.
There will be three (3) Infiltration Swales located around the facilities area central to
Precinct F, these swales will also act as conveyance systems for flows exceeding the
infiltration rate of the filter media discharged into the piped stormwater drainage network.
Based on the operation of the proposed arrangement all water entering the piped
drainage network will trigger the requirements of Part 1a of Condition 49. However all
runoff lost from the system via infiltration will enter the groundwater table and eventually
discharge to Lake Weyba in the south. This proportion of stormwater runoff from the
development technically bypasses the Noosa Springs Lake System and therefore triggers
the requirements of Part 2b of Condition 49.
The stormwater quality management approach has ensured the concentration of
pollutants in runoff discharged from the two sites combined (Precinct F and Precinct E2)
are lower than the existing concentrations at the discharge location.
Additionally the Noosa Springs Lake System was originally designed to provide water
quality treatment for the Precinct F and Precinct E2 developments and therefore the runoff
discharged to the lake system will undergo further treatment prior to entering the natural
environment (Lake Weyba).
4.1.2 Climate Data
Climate data for the catchment was sourced from the Bureau of Meteorology (BOM).
Rainfall data was obtained from Cooroy Composite (40059) for the 10 years between
1973 and 1983 at six (6) minute intervals as specified by MUSIC Modelling Guidelines for
South East Queensland (Water by Design, 2010).
4.1.3 Catchment Properti es
The catchment area for water quality is based on the proposed development layout. A
lumped catchment approach was considered appropriate and adopted for the
assessment. Rainfall-runoff and pollutant export parameters were adopted from the
recommended values identified in Tables 3.7 and 3.8 of MUSIC Modelling Guidelines for
Southeast Queensland (Water by Design, 2010). Table 4.1 provides a summary of the
MUSIC Model parameters adopted with the various land uses throughout the study area.
Fraction impervious is sourced from the recommended values provided by MUSIC
Modelling Guidelines for Southeast Queensland (Water by Design, 2010).
Job No. M7130_001 Page 6
Rev 4 : 7 December 2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Noosa Springs SMP_Rev 4.pdfRelated documentApplication case desk ↗
About this file
- File size
- 13.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.