Original source · versioned page text
MCU14/0056 Response to SARA - Consulting Report
The original of this document is very large (24.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 121, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnEN 858-1:2002 (E) Normal service conditions Test conditions Key a) Sludge trap volume as indicated by the manufacturer z Sludge trap volume to be filled with an inert and impermeable material having a smooth surface Partition Static water level Sludge trap Separator Collecting chamber (see figure 4) Supply pipe, inclined at (2 + 0,5) % a ak wn = Figure 3b — Sludge trap combined and below the static water level of the separator 6 This is a licensed reproduction produced by SAI Global Ltd, an authorized distributor of British Standards
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.