Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

MCU14/0056 Response to SARA - Consulting Report

of 321

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (24.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 120, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
EN 858-1:2002 (E)

Normal service conditions Test conditions

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

|
te 2h54

 

 

 

 

 

 

 

b)
Key
a) Supply from sludge trap to 1 Scum board 6 FB want pipe, inclined at
(2 = 0,5) % @i

separator over a weir 2 Static water level 7 Weir
b) Supply from sludge trap to 3  Sludgetrap . 8 Inlet openings

separator by means ofe.g.two 4 Separator 9 Connecting pipe

inlet openings 5 Collecting chamber (see figure 4}

Figure 3a — Sludge trap combined and in line with the separator

Where the flow, under normal service conditions, between the sludge trap and separator is over an open weir, the
supply pipe shall be adapted to form an angular flume with sides not less than 45 ° as shown in a). The discharge
of the flume shall extend the full width of the weir. :

Where the flow, under normal service conditions, between the sludge trap and separator is by more than one
pipe/duct, the cross sectional area of the supply pipe shall be equal to the total cross sectional area of the
pipes/ducts and constructed as shown in b).

This is a licensed reproduction produced by SAI Global Ltd, an authorized distributor of British Standards 25
Log in to download the original file

MCU14_0056 Response to SARA - Consulting Report.pdf · 24.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.