Original source · versioned page text
MCU14/0056 Response to SARA - Consulting Report
The original of this document is very large (24.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 128, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnTable 5 (continued)
EN 858-1:2002 (E)
Aspects to be tested
Test method/evaluation of
conformity according to
Nature and number of samples,
test specimens and
measurements
Requirements
according to
Chemical resistance of internal
surfaces:
— Plastics materials and linings |8.1.4.2 Three test specimens according |6.2.7.1.2
to 8.1.4.2 per material type
— Sealing maierials 8.1.4.3 According to {SO 1817 6.2.7.1.3
— Coatings 8.1.4.4 Three steel test specimens 6.2.7.1.4
according to 8.1.3.2.6 per test
Chemical resistance of 8.1.5- Three test specimens according |6.2.7.2
external surfaces ‘to 8.1.3.2.6 per test
Dimensions of chambers and |Measurement for Prototype separator system 9.2
components compliance with
manufacturer's
documentation
Maximum operational liquid Procedures in 8.3.3.1.3 Prototype separator 3.11; 6.3.1
level and area of the separator
or sludge trap
Watertightness of components |8.2 Prototype separator system and |6.3.2
where necessary test apparatus
according to figure 1
Accessibility Visual inspection and Prototype separator system 6.3.3
measurement
Water seals Measurement Prototype separator system 6.3.4
Pipes and pipe joints Visual inspection and Prototype separator system 6.3.5
measurement
Internal components Visual inspection, test by |Prototype separator system 6.3.6
way of trial
Sludge trap Visual inspection Prototype separator system 6.3.7
Access covers Visual inspection Prototype separator system 6.3.8
Reaction to fire 8.4.2 Material test 6.2.8
Structural stability Verification of existence of 6.4
documents showing
compliance with 6.4
Functional requirements:
— General Verification on the basis of 6.5.1
the drawings
— Storage capacity for light Determination in 6.5.2
liquids accordance with 8.3.3.1.3
— Automatic closure device 8.3.2 Prototype separator or separate |6.5.3
tank
— Automatic warning Verify existence of Prototype separator system 6.5.4
devices/additional devices certificates
— Bypass separator All tests concerning the Prototype separator system 6.5.5
This is a licensed reproduction produced by SAl Global Ltd, an authorized distributor of British Standards
33
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.