Original source · versioned page text
MCU14/0056 Response to SARA - Consulting Report
The original of this document is very large (24.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 143, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnEN 858-1:2002 (E) Annex D (informative) Control by third party (third party control) D.1 General The purpose of third party control is: a) to ensure that the quality level of the product is continuously maintained according to the requirements of this standard, and b) to give independent certification to the products. NOTE For a new production unit this inspection should be undertaken, at the tequest of the manufacturer, within a twelve month period of its commissioning. D.2 Procedure of the third party control D.2.1 Factories certified to EN ISO 9001 Third party control consists of: a) controlling the validity of the licence granted to the manufacturer for compliance of his quality assurance system with EN !SO 9001; b) verifying that type testing has been satisfactorily carried out; c) verifying that the results of controls made by the manufacturer are in compliance with the requirements of this standard; d) independent random examination of finished products. The third party contro! is carried out at least twice a year, at regular intervals, and can be undertaken without previous announcement. D.2.2 Factories not certified to EN ISO 9001 For factories not certified to EN ISO 9001, the requirements of annex B, table B.4 can be applied. Third party control consists of: a) assessing the adequacy of the staff and equipment for continuous and orderly manufacture; b) verifying that type testing has been satisfactorily carried out in accordance with the requirements of this standard; ¢) verifying that factory production control is independent of production; d) verifying that the manufacturer's controls and tests have been carried out in compliance with this standard, and that the results have met the requirements (see annex B, tables B.1 to B.3), and 8) independent random examination of finished products. 48 This is a licensed reproduction produced by SAI Global Ltd, an authorized distributor of British Standards
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.