Skip to the record
Accept no substitutions.

Original source · versioned page text

MCU14/0056 Response to SARA - Consulting Report

of 321

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (24.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 144, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
EN 858-1:2002 (E)

The third party control is carried out at least four times a year, at regular intervals, and can be undertaken without
previous announcement.

The frequency of inspection may be reduced to two times a year provided that the third party is satisfied that:
— the manufacturer's internal quality control system is adequate;

— the controls have been continuously carried out in a proper and effective way for one year, and

— the results are in compliance with the requirements of this standard.

This reduced inspection frequency remains valid for as long as no defective products are detected.

The main aspects of third party verification are given in table B.4.

D.3 Report by the third party

The results of the third party control are given in a written report. The manufacturer signs this report. If no
agreement can be reached between the inspector and the manufacturer on the content of the report, the
manufacturer will sign the report and state his reservations thereon.

This report contains at least the following items:

— name of the manufacturer;

— name and location of the production plant;

— signature of the manufacturer's representative, place and date;

— the third party inspector's signature.

lt also contains:

a) for factories certified to EN ISO 9001, a statement regarding:

— the validity of the quality assurance certificate, and

— the conformity of the products.

b) for factories not certified to EN [SO 9001, a statement regarding the results of the inspection in terms of:

— staff;

— equipment;

— conformity of the products;

— factory production conirol.

Within three weeks of the inspection, an official report will be sent to the manufacturer by the third party.

D.4 Non-conforming products

If, during a third party inspection, a component of a separator system fails to meet any requirement to be tested, or
if the third party test results do not confirm those recorded in the manufacturer's internal quality control
documentation, the third party conducts further investigations and/or testing to identify the reason(s) for this
discrepancy.

This is a licensed reproduction produced by SAI Global Ltd, an authorized distributor of British Standards 49
Log in to download the original file

MCU14_0056 Response to SARA - Consulting Report.pdf · 24.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.