MCU14/0056 Response to SARA - Consulting Report
The original of this document is very large (24.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 175, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn GLAND 50 mm PVC CAP
MANHOLE
100 mm
60 mm
300 mm CABLE
50 mm Stand Off Clamps
200 mm
TANK BARREL
50 mm PVC PIPE Depends on Water Level at No Flow
And Tank Diameter
50 mm
No Flow Water Level OUTLET INVERT LEVEL
INSIDE/BOTTOM OF OUTLET PIPE
100 mm
Ø50 mm
200 mm
PROBE HEAD 100 mm
PURACEPTOR
1st Chamber near ACD Tube
50 mm
STORMCEPTOR
DATE REVISED BY TITLE:
2nd Chamber near Coalescer
SPEL OilSET 1000 Probe Setting
STORMWATER QUALITY
IMPROVEMENT DEVICE SIZE CODE DWG No: REV
83 - 87 FENNELL ST. PARRAMATTA. A4 EN 858-1 SO1PS 0
NSW. 2150.
PH: + 61 2 8838 1000.
FAX: + 61 2 9630 0369.
SCALE DRAWN BY: JL SHEET
EMAIL: [email protected] NTS DATE: 14.07.09
1 of 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.