Skip to the record
Search everything, all in one place.

Original source · versioned page text

MCU14/0056 Response to SARA - Consulting Report

of 321

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (24.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 21, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                 ENG
                                                    Engineering Report & Stormwater Management Plan
                                            Date:          27/01/2015      Document No.:     14012-ENG-04.Docx

                                             By:               AvT          Revision No.:             F


                      f. Stormwater Quantity Management

 Noosa Regional Council Policy requires that a development ensure Non Worsening of
 stormwater flows up to and including Q100 stormwater events. The proposed development
 includes detention basin storage in the South East corner of the site. With this detention
 basin, it is considered that the proposed development will not cause any worsening of flows
 from the site.

 The new proposed multi-use development will have a larger impervious area than the existing
 undeveloped site and will require a stormwater detention system to mitigate the effects of
 the additional runoff. Detailed calculations of the detention required are included in Appendix
 H of this report and are summarised in the table below:


            Runoff Coefficient (C10) - Undeveloped:        0.65          tc =      6 min.
            Runoff Coefficient (C10) - Developed:          0.85          tc =      6 min.

                                            PARAMETERS
      ARI                                                2yr   5yr  10yr 20yr 50yr                    100yr
Rainfall Intensity                          mm/hr       150.0 184.0 204.0 232.0 268.0                 296.0
Frequency Factor              fy=                       0.85      0.95     1.00     1.05    1.15      1.20
 Undeveloped C                Cu=                       0.60      0.67     0.70     0.74    0.81      0.84
  Developed C                 Cd=                       0.70      0.78     0.82     0.86    0.94      0.98

                                                   FLOWS
Undeveloped Flow              Qu=   C*I*A     l/s       1248      1711    1997      2385    3018      3478
 Developed Flow          Qd=Qi=     C*I*A     l/s       1462      2005    2340      2794    3535      4074
   Difference                              l/s          214        293     342       409     517      596
   Outlet Flow           Qo =              l/s          1248      1711    1997      2385    3018      3478
      Table 5.12:         Quantity Summary




 A PO Box 26, Carina Q 4152                                                                     20 | P a g e
 E [email protected]
 W www.vtce.com.au
Log in to download the original file

MCU14_0056 Response to SARA - Consulting Report.pdf · 24.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.