Log in to see the plans as drawnEnviropod Installation Procedure – 1 Piece Cage
Strut Installation
1. Measure the internal dimensions of the pit while marking the center of the pit length, at 150mm down
from entry of pit (the height where the struts are to be secured).
Remember to allow for dimension “A”.
2. Using a unit template mark the position of the holes for the L-brackets, based on the center mark.
3. Using an 8mm masonry drill bit drill holes for the insertion of the Dyna Bolts.
©2013 Stormwater360 | EnviroPod Installation Manual 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.