Original source · versioned page text
MCU14/0056 Response to SARA - Consulting Report
The original of this document is very large (24.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 215, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn 4. Slide the Top Section along the T Sections until it sits in the center of the pit.
5. Check unit to ensure a good fit with pit, if the unit does not make a good fit, and that any gaps are less
than 15mm. If the gaps are larger than 15mm the plastic will need to be replaced by a larger section.
6. On each strut drill a 5mm hole through the Top Section and the T Struts, and secure the Top Section to
the struts using a 73AS6-8 pop rivet. NOTE: if the EnviroPod incorporates a cage, step 6 can be
completed during stage 2 of “Cage Installation”.
7. Check plastic to ensure that it is bent upwards on all sides, adjusting plastic if required, fill small gaps
with silicon sealant if required.
©2013 Stormwater360 | EnviroPod Installation Manual 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.