Log in to see the plans as drawn ENG
Engineering Report & Stormwater Management Plan
Date: 27/01/2015 Document No.: 14012-ENG-04.Docx
By: AvT Revision No.: F
7. Water Reticulation
A new domestic water supply is proposed to service the new proposed multi-use
development. A new property connection will be provided to the site from Myall Street.
Associated water connections will be installed on Myall Street. Proposed fire hydrants are
located along the central internal road to service the new proposed buildings and Tourist Park.
For more details refer to the engineering plans in Appendix B.
Refer to the Water and Sewerage Network Analysis report by GHD which assesses the possible
impact of the development on the capacity of the adjacent water network in accordance with
Unity Waters requirements.
Roof water harvesting tanks are proposed for this development as part of the stormwater
quality treatment train and to reduce the water demand on the reticulated town water supply
system.
The collected water is intended to be used for non-potable uses such as toilet flushing and
landscape irrigation. In the event that the roof water harvesting tank is empty after long
periods of drought, the reticulated town water supply system will be used. The reticulated
town water supply system will be protected from potential backflow with the use of a
backflow prevention device that complies with AS/NZS3500.
To reduce the water demand on the roof water harvesting tank and the reticulated town
water supply system it is intended that all fixtures will be water efficient appliances.
The Internal water supply design for this proposed development will be by others.
A PO Box 26, Carina Q 4152 25 | P a g e
E [email protected]
W www.vtce.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.