Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

MCU14/0056 Response to SARA - Consulting Report

of 321

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (24.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 27, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                             ENG
                                                 Engineering Report & Stormwater Management Plan
                                         Date:          27/01/2015     Document No.:     14012-ENG-04.Docx

                                          By:              AvT          Revision No.:              F


 8. Water Supply Catchment

The development site is located within the Lake Macdonald Water Supply Catchment, with the
lake being approximately 3.5kms to the North East of the site.

Any development site within the Lake Macdonald Water Supply Catchment could potentially
impact on the runoff entering into the lake, therefore it is important that any development
uses best practise measures within the proposed designs to minimise or reduce the potential
impact.

Development within the Lake Macdonald Water Supply Catchment is to be in accordance with
the following codes and guidelines, which can be found in Appendix I:
 • Noosa Council Natural Resources Overlay Code
 • SEQ Water Development Guidelines


     State Planning Policy - State Interest Guideline for Water Quality
The SPP includes interim development assessment requirements to ensure that state interests
are appropriately considered by local government when assessing development applications
where the local government planning scheme has not yet appropriately integrated the state
interests in the SPP. The requirements should be considered by applicants when preparing a
development application and must be considered by local government when assessing a
development application as assessment manager.

The interim development assessment requirements have been reviewed and the specified
water quality targets have been used for the assessment of this development. It is considered
that the proposed development will achieve the require water quality targets as outlined in
Section 5 of this report.

     Erosion and Sediment Control
During the construction phase of the project, there is a potential for erosion of exposed soils
to occur on site. As previously outlined in this report and as shown on the preliminary design
drawings, erosion and sediment control measures will be installed prior to construction and
maintained throughout construction until adequate ground cover is achieved.

The proposed treatment measures will be designed in accordance with the International
Erosion Control Association Australasia standards and standard drawings to ensure that the
proposed works minimise any impact on the downstream water quality.

While every measure may be taken to ensure that the erosion and sediment control measures
are correctly installed and maintained, it is possible that the measures may fail. If this were to
occur, the contractor is to contact Unity Water and SEQ Water to ensure that adequate



A PO Box 26, Carina Q 4152                                                                  26 | P a g e
E [email protected]
W www.vtce.com.au
Log in to download the original file

MCU14_0056 Response to SARA - Consulting Report.pdf · 24.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.