Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

MCU14/0056 Response to SARA - Consulting Report

of 321

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (24.7 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 267, section 1. The text section number identifies this passage in the reader.

                   Corner Myall Street & Ferrells Road Cooroy, QLD 4563
                                                  SEQwater Development Guidelines
                          Development Guidelines for Water Quality Management in Drinking Water Catchments

Table 4 Element 1: On-Site Wastewater Treatment and Effluent Disposal Specific Outcomes and
Measures

                Specific Outcome                                   Measures                                        Comment

 S3    Site Evaluation (Assessment)           M3.1 A detailed site evaluation is             A geotechnical investigation has not been conducted,
       A complete evaluation of the site is   undertaken by a suitably qualified             however a detailed geotechnical investigation will be
       undertaken to ensure the most          person(s) that addresses the criteria that     conducted by a suitable qualified geotechnical engineer
       suitable location for wastewater       is contained in Specific Outcome S1 as         prior to detailed design
       treatment and disposal is              well as:
       determined.
                                              a) Depth to bedrock and seasonal
                                              groundwater;

                                              b) Nature of site water supply;

                                              c) Local climatic conditions;

                                              d) Site stability;

                                              e) Soil profile in accordance with
                                              Australian Standard; and

                                              f) Soil characteristics, particularly Cation
                                              Exchange Capacity (CEC), dispersal
                                              potential, permeability, depth of topsoil
                                              to impermeable layer and structure.

                                              M3.2 Siting of the treatment and disposal
                                              areas reflects the outcomes of the report
                                              in M3.1 and the other Specific Outcomes
                                              of this Element.
Log in to download the original file

MCU14_0056 Response to SARA - Consulting Report.pdf · 24.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.