Skip to the record
Beware of cheap imitations.

Original source · versioned page text

MCU14/0056 Response to SARA - Consulting Report

of 321

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (24.7 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 268, section 1. The text section number identifies this passage in the reader.

                   Corner Myall Street & Ferrells Road Cooroy, QLD 4563
                                                 SEQwater Development Guidelines
                         Development Guidelines for Water Quality Management in Drinking Water Catchments

Table 4 Element 1: On-Site Wastewater Treatment and Effluent Disposal Specific Outcomes and Measures cont.

                Specific Outcome                               Measures                                          Comment

 S4    Wastewater Treatment System            M4.1 The wastewater treatment system
                                              must include:
       The wastewater treatment system is
       certified under the Plumbing and
       Drainage Act 2002, combines black      a) A disinfection process to achieve the     Not Applicable
       (toilet) and grey (kitchen/ablution)   required microbiological quality and
       water, and is capable of producing     processes including: chlorination, UV
       the standard of treatment required     radiation, oxidation or membrane
       by this Element.                       processes as per the Queensland
                                              Plumbing and Wastewater Code, if
                                              surface irrigation is the desired disposal
                                              method;

                                              b) For a dwelling, provide emergency         Not Applicable
                                              storage capacity of 1,000 litres and
                                              adequate buffering for shock
                                              loading/down time and the like;

                                              c) For other than a dwelling, provide        The proposed pump station will include additional
                                              emergency storage capable of holding 3 –     emergency storage. Refer to sewer and water analysis
                                              6 hours peak flow of treated effluent in     report prepared by GHD.
                                              the event of emergencies/overload, with
                                              provision for desludging; and
Log in to download the original file

MCU14_0056 Response to SARA - Consulting Report.pdf · 24.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.