Original source · versioned page text
MCU14/0056 Response to SARA - Consulting Report
Plans and drawings: the text below has words only, no drawings.
Very large file (24.7 MB): may take a few minutes to open.
Original PDF page 268, section 1. The text section number identifies this passage in the reader.
Corner Myall Street & Ferrells Road Cooroy, QLD 4563
SEQwater Development Guidelines
Development Guidelines for Water Quality Management in Drinking Water Catchments
Table 4 Element 1: On-Site Wastewater Treatment and Effluent Disposal Specific Outcomes and Measures cont.
Specific Outcome Measures Comment
S4 Wastewater Treatment System M4.1 The wastewater treatment system
must include:
The wastewater treatment system is
certified under the Plumbing and
Drainage Act 2002, combines black a) A disinfection process to achieve the Not Applicable
(toilet) and grey (kitchen/ablution) required microbiological quality and
water, and is capable of producing processes including: chlorination, UV
the standard of treatment required radiation, oxidation or membrane
by this Element. processes as per the Queensland
Plumbing and Wastewater Code, if
surface irrigation is the desired disposal
method;
b) For a dwelling, provide emergency Not Applicable
storage capacity of 1,000 litres and
adequate buffering for shock
loading/down time and the like;
c) For other than a dwelling, provide The proposed pump station will include additional
emergency storage capable of holding 3 – emergency storage. Refer to sewer and water analysis
6 hours peak flow of treated effluent in report prepared by GHD.
the event of emergencies/overload, with
provision for desludging; and
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.