Original source · versioned page text
MCU14/0056 Response to SARA - Consulting Report
Plans and drawings: the text below has words only, no drawings.
Very large file (24.7 MB): may take a few minutes to open.
Original PDF page 280, section 1. The text section number identifies this passage in the reader.
Corner Myall Street & Ferrells Road Cooroy, QLD 4563
SEQwater Development Guidelines
Development Guidelines for Water Quality Management in Drinking Water Catchments
Table 8 Element 5: Water Sensitive Design and Stormwater/Runoff Management Specific Outcomes
and Measures
Specific Outcome Measures Comment
S21 Site Based Stormwater Quality (and M21.1 A Site Based Stormwater Management Plan A site based stormwater management plan
Runoff) Management Plan (SBSMP) is prepared that addresses all Specific has been prepared by a suitably qualified
A Site Based Stormwater Quality Outcomes of this Element and is relevant to the engineer for the development.
Management Plan including water particular land use, development and/or activity.
quality objectives, design,
maintenance, monitoring and M21.2 The SBSMP is prepared and signed-off by a A site based stormwater management plan
operation of all measures, is suitably qualified and experienced engineer. has been prepared by a suitably qualified
prepared for all High Risk engineer for the development.
Developments.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.