Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

MCU14/0056 Response to SARA - Consulting Report

of 321

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (24.7 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 281, section 1. The text section number identifies this passage in the reader.

                Corner Myall Street & Ferrells Road Cooroy, QLD 4563
                                              SEQwater Development Guidelines
                      Development Guidelines for Water Quality Management in Drinking Water Catchments

Table 8 Element 5: Water Sensitive Design and Stormwater/Runoff Management Specific Outcomes and
Measures cont.

              Specific Outcome                                 Measures                                           Comment

                                          M21.3 The SBSMP establishes that erosion,              The site based stormwater management plan
                                          sediment and stormwater quality are controlled at      provides treatment measures at each stage
                                          each stage of construction to prevent off-site
                                          movement of pollutants in compliance with the
                                          results from assessments describe under Specific
                                          Outcome S23 and the requirements outlined in any
                                          published Council/Government guideline, manual
                                          and the like.

                                          M21.4 The SBSMP ensures that stormwater                The proposed treatment measures will be
                                          management measures will be installed and              maintained in accordance with the Water By
                                          maintained by suitably qualified professionals.        Design guidelines

                                          M21.5 The SBSMP demonstrates that any                  A site based stormwater management plan
                                          revegetation, measures, devices and systems will       has been prepared for the development that
                                          be self-regulatory and low maintenance such that       provides a an acceptable solution in
                                          provision for a regime approved by a local             accordance with the Water By Design
                                          government is not necessary.M21.1 A Site Based         guidelines
                                          Stormwater Management Plan (SBSMP) is prepared
                                          that addresses all Specific Outcomes of this
                                          Element and is relevant to the particular land use,
                                          development and/or activity.
Log in to download the original file

MCU14_0056 Response to SARA - Consulting Report.pdf · 24.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.