Skip to the record
Every meeting, every word.

Original source · versioned page text

MCU14/0056 Response to SARA - Consulting Report

of 321

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (24.7 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 286, section 1. The text section number identifies this passage in the reader.

                Corner Myall Street & Ferrells Road Cooroy, QLD 4563
                                              SEQwater Development Guidelines
                      Development Guidelines for Water Quality Management in Drinking Water Catchments

Table 8 Element 5: Water Sensitive Design and Stormwater/Runoff Management Specific Outcomes and
Measures cont.

              Specific Outcome                                 Measures                                  Comment

                                          M24.8 Stormwater management measures for
                                          construction are used in locations where they
                                          remain in place for the duration of development
                                          works and/or where permanent stormwater
                                          controls will eventually be incorporated.

                                          M24.9 Where permanent stormwater quality
                                          management measures are required (structural and
                                          non-structural), such are selected, constructed and
                                          maintained in accordance with local government
                                          requirements, manuals, guidelines and the like with
                                          location and installation undertaken to prevent
                                          erosion or contamination of runoff and as
                                          appropriate to the existing and proposed features
                                          of the site.

                                           M24.10 Selection, design and installation of
                                          stormwater management measures should reflect
                                          the following principles:
                                          a) Minimise areas subject to disturbance;
                                          b) Maintain maximum protective vegetation using
                                          selective clearing where appropriate, with
                                          retention of native vegetation to maximise
                                          infiltration;
Log in to download the original file

MCU14_0056 Response to SARA - Consulting Report.pdf · 24.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.