Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

MCU14/0056 Response to SARA - Consulting Report

of 321

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (24.7 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 285, section 1. The text section number identifies this passage in the reader.

                Corner Myall Street & Ferrells Road Cooroy, QLD 4563
                                              SEQwater Development Guidelines
                      Development Guidelines for Water Quality Management in Drinking Water Catchments

Table 8 Element 5: Water Sensitive Design and Stormwater/Runoff Management Specific Outcomes and
Measures cont.

              Specific Outcome                                 Measures                                  Comment

                                           M24.4 Stormwater management measures and the
                                          overall stormwater management system
                                          demonstrate diversion of clean runoff around the
                                          problem areas listed in Specific Outcome S22 to
                                          stable areas and the rehabilitation/maintenance of
                                          such areas with deep-rooted vegetation or other
                                          appropriate ground cover.

                                          M24.5 Stormwater management measure
                                          principally rely on non-mechanical management
                                          measures.

                                          M24.6 Stormwater management measures
                                          principally rely on non-structural management
                                          measures (such as grass swales, infiltration areas,
                                          revegetated areas and the like) in situations where
                                          they offer better solutions than structural
                                          measures.

                                          M24.7 Stormwater management measures should
                                          be integrated into the overall design and
                                          landscaping of the site.
Log in to download the original file

MCU14_0056 Response to SARA - Consulting Report.pdf · 24.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.