Skip to the record
For the highest quality transcripts.

Original source · versioned page text

MCU14/0056 Response to SARA - Consulting Report

of 321

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (24.7 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 288, section 1. The text section number identifies this passage in the reader.

                  Corner Myall Street & Ferrells Road Cooroy, QLD 4563
                                                 SEQwater Development Guidelines
                         Development Guidelines for Water Quality Management in Drinking Water Catchments

Table 8 Element 5: Water Sensitive Design and Stormwater/Runoff Management Specific Outcomes and
Measures cont.

                Specific Outcome                                  Measures                                          Comment

                                              j) Prevent any clearing or earthworks in riparian
                                             lands or within sensitive areas;
                                              k) Establish where erosion, sediment and flow
                                             control devices should be used and the most
                                             effective devices in the circumstances (including
                                             storm events) which should be installed at the
                                             source to improve water quality;
                                              l) Re-establish vegetation and stabilise as soon as
                                             practical on areas that have been disturbed using
                                             stripped soils and vegetation consistent with native
                                             species in the area or appropriate to the soil types
                                             and climatic conditions; and
                                              m) Provide for maximised on-site stormwater
                                             reuse, rainwater storage and the like.


 S25   Erosion and Sediment Control Plan     M25.1 The Erosion and Sediment Control Plan            An erosion and sediment control plan has
       Where land uses, development or       (ESCP) is prepared and signed-off by a suitably        been prepared by a suitably qualified
       activities involve any earthworks,    qualified and experienced professional.                engineer for the development.
       roadworks and building works,
       appropriate practices, procedures
                                             M25.2 ESCPs establish that erosion, sediment and
       and devices are identified in an
                                             stormwater quality are controlled at each stage of
       Erosion and Sediment Control Plan.
                                             construction to prevent off-site movement of
                                             pollutants in compliance with the results from
                                             assessments described under Specific Outcome S23
                                             and the requirements outlined in any published
Log in to download the original file

MCU14_0056 Response to SARA - Consulting Report.pdf · 24.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.