Skip to the record
Beware of cheap imitations.

Original source · versioned page text

MCU14/0056 Response to SARA - Consulting Report

of 321

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (24.7 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 289, section 1. The text section number identifies this passage in the reader.

                  Corner Myall Street & Ferrells Road Cooroy, QLD 4563
                                                 SEQwater Development Guidelines
                         Development Guidelines for Water Quality Management in Drinking Water Catchments

Table 8 Element 5: Water Sensitive Design and Stormwater/Runoff Management Specific Outcomes and
Measures cont.

               Specific Outcome                                   Measures                                           Comment

                                             Council/Government guideline, manual and the
                                             like.

                                             M25.3 ESCPs establish that stormwater
                                             management measures are used in locations where
                                             they remain in place for the duration of
                                             development works and/or where permanent
                                             stormwater management measures will eventually
                                             be incorporated.

                                             M25.4 ESCPs establish that stormwater
                                             management measures are installed and
                                             maintained by suitably qualified professionals.
      Outcomes of Stormwater/Runoff           M26.1 Land uses, development, activities and          As detailed in the site based stormwater
      Management                             stormwater management ensure:                          management plan the proposed
      Stormwater management does not          a) No increased peak discharges outside the           development provides a stormwater
      cause an adverse impact on             boundaries of the site;                                detention basin to reduce stormwater
      flooding, drainage or water quality.                                                          quantity runoff from the site.
                                              b) No increased flood levels or volumes outside the
                                             boundaries of the site;
                                             c) No adverse impacts of flooding on developed or      The site based stormwater management
                                             developable areas;                                     plan provides details of the stormwater
                                                                                                    quality treatment measures that will be
                                             d) No increased erosion potential on or outside the
                                                                                                    used.
                                             boundaries of the site;
Log in to download the original file

MCU14_0056 Response to SARA - Consulting Report.pdf · 24.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.