Corner Myall Street & Ferrells Road Cooroy, QLD 4563
SEQwater Development Guidelines
Development Guidelines for Water Quality Management in Drinking Water Catchments
Table 11 Element 8: Excavation and Filling Specific Outcomes and Measures cont.
Specific Outcome Measures Comment
e) Above the 1 in 50 year ARI flood line.
S41 Stabilisation M41.1 Cut and fill batters should be consistent with All earthworks will be conducted to ensure
All areas subject to excavation and the following principles: compliance
filling activities are stabilised upon a) Do not straddle lot boundaries;
completion of works. b) Do not extend into riparian lands;
c) Are limited to a maximum slope of 1 in 4 with
batters being treated to allow for successful
stabilisation and/or revegetation;
d) Are protected from runoff; e) Filling and
excavation do not impact on the stability of land, as
indicated through preliminary engineering
drawings; and
f) Provide for several cuts and fills, rather than
severe and large cuts and fills.
M41.2 Revegetation is to achieve 60% surface
coverage after about 6 months and to minimise
weed invasion.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.