Original source · versioned page text
MCU14/0056 Response to SARA - Consulting Report
Plans and drawings: the text below has words only, no drawings.
Very large file (24.7 MB): may take a few minutes to open.
Original PDF page 317, section 1. The text section number identifies this passage in the reader.
Season’s Greetings from Saunders Havill Group Our office will be closed from midday Friday 19 December 2014 and will reopen Monday 5 January 2015 Brisbane / Emerald / Gladstone Surveying / Town Planning / Urban Design / Environmental Management / Landscape Architecture The information transmitted is for the use of the intended recipient only and may contain confidential and/or legally privileged material. Any review, re-transmission, disclosure, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you have received this email in error please delete all copies of this transmission together with any attachments and notify the sender. Opinions, conclusions and other information in this email that do not relate to the official business of Saunders Havill Group shal! be understood as neither given nor endorsed by it. We have taken precautions to minimise the risk of transmitting software viruses, but we advise you to carry out your own virus checks on any attachment to this message. We cannot accept liability for any loss or damage caused by software viruses. From: Leah Snerling [mailto:[email protected]] Sent: Tuesday, 23 December 2014 3:12 PM To: Andrew van Tonder Cc: Eddie Venturini Subject: RE: TRIM: RE: 6520 - meeting to discuss development at Cooroy email 1 of 2 Good afternoon Andrew, Thank you for providing the additional information we requested on the Cooroy mixed-use development. | have reviewed the documentation and am satisfied that stormwater management, setbacks to the minor watercourse and general treatment of the riparian corridor are in accordance with the Seqwater Development Guidelines. There are a few points that were made informally (in emails) or touched upon in reports that I'd like to confirm regarding both the riparian buffer and the pump station, and also some uncertainties around the proposed pump station in the absence of a report addressing this particular element of the proposal. To address these areas, | can provide the following advice / recommendations: : © Seqwater supports the 20m average setback and riparian buffer width for all uses to the minor stream on the subject site. The 10m additional buffer strip affords important additional protection to the watercourse and riparian vegetation, given the high impact nature of some uses proposed. The response letter prepared by Saunders Havill Group (Keira Grundy, dated 20 November 2014) and the Ecological Assessment Report (EAR -prepared by Saunders Havill Group, dated 24 June 2014) both make brief reference to weeding and revegetation of the 20m riparian buffer area, however no Rehabilitation and Weeding Management Plan has been provided with the application material. The Landscape Masterplan (Prepared by Saunders Havill Group, dated 10 February 2014) makes reference only to weeding in the riparian buffer area and planting in the additional 10m buffer strip. Given the degraded state of the existing riparian buffer (as evidenced in the aforementioned environmental advices) and the high impact nature of some of the proposed uses within a drinking water supply catchment, Seqwater considers it appropriate for a staged rehabilitation plan, including select and controlled weeding and revegetation to be developed for the existing riparian buffer. This should occur in addition to the proposed planting in the 10m buffer strip. it is recommended that a Rehabilitation and Weed Management Plan is prepared by a qualified professional at the appropriate stage of development and approved / endorsed by Council prior to development commencing on the site. Seqwater requests a copy of any such plan for review when available. e The Water and Sewerage Network Analysis (prepared by GHD, dated November 2014} mentions that it does not cover internal site servicing. No report specifically addressing the private pump station required on site has been prepared, therefore no information exists as to the capacity, maintenance or emergency response measures associated with this infrastructure. Seqwater recommends the preparation of an Inspection and Maintenance Schedule and an Emergency Response and Contingency Plan for the pump station.. This
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.