Skip to the record
The only place to find full transcripts.

Original source · versioned page text

MCU14/0056 Response to SARA - Consulting Report

of 321

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (24.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 318, section 1. The text section number identifies this passage in the reader.

should be endorsed / approved by the relevant authorities (Council, DEHP). Seqwater requests a copy of any
such plan for review when available.

e Should the location of the proposed on-site sewerage pump station change, Seqwater requires that this
facility maintains at least a 50m setback from the surveyed high bank of the watercourse on the site.

© Seqwater strongly supports provision of at least 25% and up to 50% more emergency storage capacity at
the pump station, than that required by the SEQ Sewer and Water Code.

e Seqwater requests to be included on a notification register in the event of any overflow / spill / other
sewage discharge event

Many thanks for your consultation in relation to the proposed development. If there is any further advice or
clarification you require, please contact me directly.

Kind regards,

Leah Snerling Senior Land Use Planner

@& seqwater

117 Brisbane Street, Ipswich, QLD, 4305 | PO Box 16146, City East, QLD 4002
p (07) 3035 5552 | m 0427 910 259 | f (07) 3229 7926
e [email protected] | w www.seqwater.com.au

  

 

 

Please consider the environment before printing this email. It can take up to 13 litres of water to make one sheet of A4 paper.

Our rangers can't be everywhere to help yor es
Play it safe this summer a eet]

eR aap TCD)

 
  

seqwater.com.au/play

 

From: Andrew van Tonder [mailto:[email protected]
Sent: Wednesday, 17 December 2014 10:34 AM

To: ‘Eddie Venturini’; Leah Snerling

Ce: 'Gavin Nye’; [email protected]

Subject: TRIM: RE: 6520 - meeting to discuss development at Cooroy email 1 of 2

Hi Leah

The proposed pump station is shown on drawing POO3 and is about 50m from the stream/ waterway.

Also please find attached the sewer and water analysis report that has more information on the proposed pump
station. The pump station would have a warning system in the event of an emergency and we are proposing to have
emergency storage that is 25-50% larger than is required by the SEQ Sewer and Water Code. Also in the event that
both pumps stop working, the owner could stop all uses on site.

‘Please do not hesitate to contact me should you require any further information.

Kind Regards,

Andrew van Tonder
Log in to download the original file

MCU14_0056 Response to SARA - Consulting Report.pdf · 24.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.