should be endorsed / approved by the relevant authorities (Council, DEHP). Seqwater requests a copy of any such plan for review when available. e Should the location of the proposed on-site sewerage pump station change, Seqwater requires that this facility maintains at least a 50m setback from the surveyed high bank of the watercourse on the site. © Seqwater strongly supports provision of at least 25% and up to 50% more emergency storage capacity at the pump station, than that required by the SEQ Sewer and Water Code. e Seqwater requests to be included on a notification register in the event of any overflow / spill / other sewage discharge event Many thanks for your consultation in relation to the proposed development. If there is any further advice or clarification you require, please contact me directly. Kind regards, Leah Snerling Senior Land Use Planner @& seqwater 117 Brisbane Street, Ipswich, QLD, 4305 | PO Box 16146, City East, QLD 4002 p (07) 3035 5552 | m 0427 910 259 | f (07) 3229 7926 e [email protected] | w www.seqwater.com.au Please consider the environment before printing this email. It can take up to 13 litres of water to make one sheet of A4 paper. Our rangers can't be everywhere to help yor es Play it safe this summer a eet] eR aap TCD) seqwater.com.au/play From: Andrew van Tonder [mailto:[email protected] Sent: Wednesday, 17 December 2014 10:34 AM To: ‘Eddie Venturini’; Leah Snerling Ce: 'Gavin Nye’; [email protected] Subject: TRIM: RE: 6520 - meeting to discuss development at Cooroy email 1 of 2 Hi Leah The proposed pump station is shown on drawing POO3 and is about 50m from the stream/ waterway. Also please find attached the sewer and water analysis report that has more information on the proposed pump station. The pump station would have a warning system in the event of an emergency and we are proposing to have emergency storage that is 25-50% larger than is required by the SEQ Sewer and Water Code. Also in the event that both pumps stop working, the owner could stop all uses on site. ‘Please do not hesitate to contact me should you require any further information. Kind Regards, Andrew van Tonder
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.