MCU14/0056 Response to SARA - Consulting Report

of 321

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (24.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 8, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                            ENG
                                                Engineering Report & Stormwater Management Plan
                                        Date:          27/01/2015     Document No.:     14012-ENG-04.Docx

                                         By:              AvT          Revision No.:              F


A geotechnical investigation will be undertaken and a report will be prepared for the site prior
to starting the detailed design stage of the development to ensure that the earthworks and
erosion control measures are designed to suit the site conditions.


 4. Roadworks

The proposed development fronts onto both Myall Street and Ferrells Road. External
roadworks are proposed for this development in accordance with the traffic impact
assessment report by Pekol Traffic and Transport, project number 13-081.

A new left turn auxiliary deceleration lane (AUL) into the new development is proposed for
traffic travelling from South to North along Myall Street. Dimensions are outlined in the traffic
impact assessment report and to be detailed as per Austroad’s: Guide to Road Design
Manuals. A channelised right turn treatment (CHR) is proposed for Myall Street at the
entrance to the new development. This is for traffic travelling from North to South along
Myall Street. Dimensions are outlined in the traffic impact assessment report and to be
detailed as per Austroad’s: Guide to Road Design Manuals.

No external roadworks are proposed for Ferrells Road.

Internal roadworks are required for the new proposed multi-use development. Refer
attached Appendix B for proposed layout plans and details. Line marking and signage will be
used through the new proposed development to emphasise the intended direction of
vehicular flow in accordance with the Manual for Uniform Traffic Control Devices (MUTCD).




A PO Box 26, Carina Q 4152                                                                  7|P a g e
E [email protected]
W www.vtce.com.au
Log in to download the original file

MCU14_0056 Response to SARA - Consulting Report.pdf · 24.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.