MCU14/0056 Response to SARA - Consulting Report

of 321

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (24.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 9, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                             ENG
                                                 Engineering Report & Stormwater Management Plan
                                         Date:          27/01/2015     Document No.:     14012-ENG-04.Docx

                                          By:              AvT          Revision No.:              F


 5. Stormwater Drainage

It is proposed that the stormwater drainage for the proposed multi-use development will be
piped to individual in-ground proprietary treatment device and then to bio-retention basins
for each catchment area. Refer attached Appendix B for proposed layout plans and details.
The stormwater from the service station, fast food outlet, food store and car wash areas and
the associated car parking will be treated in an in-ground device and basin to the South of the
car wash area, as well as landscaping around the car parking. The stormwater from the self-
storage unit will be treated in an in-ground device and basin to the East of this unit. The
stormwater from the internal roadway will be treated in the closest stormwater treatment
train. And the stormwater from the tourist park will be treated in an in-ground device and
basin to the East of the tourist park along the edge of the existing overland flow path.

All these individual an in-ground device and bio-retention basins will flow into a large single
detention basin located to the South of the site. It is proposed that the detention basin will
then drain to the existing overland flow path at the South of the site via a new concrete
headwall channelling the stormwater towards the two existing box culverts under Myall
Street. For more details refer to the engineering plans in Appendix B.

As indicated by Cooroy & Lake Macdonald Natural Resources Overlay (Map OM3.5), the site is
located within the Lake Macdonald water supply catchment.




A PO Box 26, Carina Q 4152                                                                   8|P a g e
E [email protected]
W www.vtce.com.au
Log in to download the original file

MCU14_0056 Response to SARA - Consulting Report.pdf · 24.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.