Log in to see the plans as drawn 1.0 Introduction
SPEL Environmental has been commissioned by vT Consulting Engineers to prepare a site based risk
assessment report to address the concerns raised by Noosa Regional Council regarding the proposed
service station development located at Corner Myall Street & Ferrells Road, Cooroy, QLD. The aerial
image of the site is shown in Figure 1.1.
Subject Site
Figure 1.1 – Aerial image of Corner Myall Street & Ferrells Road, Cooroy, QLD
1.1 Objectives
The Overall objective of this report is to demonstrate that installation of the SPEL Puraceptor to treat the
stormwater runoff from the high risk area is compatible with the Noosa Regional Council requirements and
that the SPEL Puraceptor is the appropriate SQID to be applied for such applications providing equivalent
advantages to the suggested design by the Noosa Regional Council (i.e. Blind Sump and separate GPT).
The main environmental concerns that have been issued by the Noosa City Council are as follows:
Ensure that the fuel dispensing area, tank filling area and one extra additional stormwater pit
drains and channeled to a SPEL® Puraceptor with a minimum capacity of 10,000 litres prior to
discharge to Council’s stormwater drainage system.
Ensure the SPEL® Puraceptor is maintained every six months or if the probe alarm is activated
and that all regulated waste from the SPEL® Puraceptor is removed from the premises by a
licensed waste transporter and disposed of at a licensed waste treatment facility. Receipts for the
SPEL® Puraceptor maintenance, waste collection and transportation of waste must be retained
on site and made available to a Council officer on request.
HEAD OFFICE POSTAL EMAIL ABN spel.com.au
100 Silverwater Road PO BOX 7138 [email protected] 83 151 832 629
Silverwater NSW 2128 Silverwater NSW 2128
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.