MCU14/0056 Response to SARA - Consulting Report

of 321

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (24.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 85, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
          3.0      Site Based Assessment
          3.1      High Risk & Medium Risk Area
          The hydrocarbon, oil-based liquids and the runoff associated with them are generally the main substances
          that make the high risk and medium risk areas distinct from each other. Traditionally, the forecourt of a
          service station that includes the dispensing area and the fill points is classified as the high risk area. The
          primary concern in the design of service stations in Australia has always been to cover this area and direct
          the stormwater runoff away from this zone to medium risk area. Figure 3.1 shows the proposed under
          canopy area (forecourt area), which is approximately 538m2. The grades on site are designed in a way so
          that the runoff from medium risk area will not enter the forecourt zone and the high risk area will not be
          impacted by flooding of medium risk area. Moreover all the possible spills in the high risk area are directed
          to SPEL Puraceptor for further treatment.




          Figure 3.1 – Under canopy area at proposed service station at Cooroy, QLD


          As illustrated in this figure all high risk areas (Canopy) are contained within the bunds and will be directed
          into a SPEL Puraceptor. The remaining pavement is considered medium risk areas and will be directed
          away from high risk areas. The Intensity – Frequency – Duration (IFD) of the site is shown in Figure 3.3,
          which has been extracted from the Bureau of Meteorology. According to this information the worst runoff
          from the forecourt area for duration of 6 minutes and an ARI of 20 will be 31.8L/s.




HEAD OFFICE                  POSTAL                          EMAIL                              ABN                        spel.com.au
100 Silverwater Road         PO BOX 7138                     [email protected]                  83 151 832 629
Silverwater NSW 2128         Silverwater NSW 2128
Log in to download the original file

MCU14_0056 Response to SARA - Consulting Report.pdf · 24.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.