Council archive · source document
Geotech Report · OPW26/0094
Project No. PG-10899 Page | 8 November 2023 Ref: PG-10899, 2023-10-16, GR VER 1 DD Sunnyside CD Sunnyside Pty Ltd – Geotechnical Investigation - Proposed Residence, 30 Mossman Court, Noosa Heads 11.0 BUILDING FOUNDATIONS Given the encountered subsurface profile, a high level footing system would generally be suitable for the support of the proposed structure, with appropriate ground improvement works and due consideration of the potential hydrostatic uplift forces. Assuming an excavation depth of 3m for the basement, provided the founding soils are compacted to a minimum Density Index of 75% for a minimum depth of 750mm below the footings, an allowable bearing capacity of 200kPa could be adopted for the foundation design. This classification could possibly be achieved through insitu compaction of the exposed sands but may require the over-excavation of the founding soils (up to 400mm), compaction of the exposed material and the replacement of the excavation using “clean” sand. It should be noted that silty sands were encountered in the sand profile and filling should be preferably disposed of. Some difficulties in treating these sands should be expected. It is strongly recommended that if a high level footing system is to be adopted, sufficient “clean” sand from higher in the excavation profile be stockpiled on-site, to allow for the replacement of the silty sands at the founding level. To enable the required ground improvement works to be undertaken, the following earthworks operation is recommended: i. Install the temporary retention system and dewatering system. ii. Dewater the site to at least 0.9m below the final excavation level. iii. Excavate the site to the design basement level and test the base of the excavation to determine the extent of over-excavation required. iv. Following determination of the required extent of over-excavation, excavate the site to the required level and compact the exposed sands using a large (300kg plus) vibrating plate compactor or a small smooth drum roller. It should be noted that the silty sands encountered at some test locations could be difficult to compact and manage, if not appropriately dewatered. It may be necessary to remove the silty sands and replace them with clean sands from higher in the excavation profile. v. Replace the over-excavation with “clean” sand and compact in layers to the design founding level. The founding soils should be compacted to a minimum Density Index of 75% (in accordance with AS 1289 5.6.1).
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Geotech Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.8 MB (small file)
- File type
No other editions are linked here.